Information
-
Jobsite name/number
-
Jobsite address:
-
Conducted on
-
Contract day no:
-
Location
-
Weather
Equipment and Personnel
Personnel on site:
-
Enter number of Supervisors:2
-
Enter number of Surveyors:0
-
Enter number of Fitters:
-
Enter number of Millwrights: 1
-
Enter number of Carpenters:
-
Enter number of Laborers:3
-
Enter number of Operators:1
-
Enter number of Electricains:
Equipment on site: Wheel loader
-
List equipment on site: 524 wheel loader 330 case track hoe roller wacker
Log of work completed by major task:
Excavation:
-
Tap to enter information Backfill around building/walls and sort out rocks to make fill suitable
Yard Piping:
-
Tap to enter information
Concrete and Resteel:
-
Tap to enter information
Miscelaneous Metals:
-
Tap to enter information Removed north shoring support beam and pilings
Demolition:
-
Removed east side shoring boards / make ready for beam removal
Architectural (Masonry, Paint, Roofs, etc)
-
Tap to enter information and further notes as needed.
Site Work:
-
Tap to enter information
Mechanical:
-
Tap to enter information
Electrical:
-
Tap to enter information
Other:
-
Tap to enter information
Deliveries:
-
Tap to enter information
Visitors:
-
Tap to enter information
Notes:
-
Enter any pertinent information not covered above:
-
Progress Pictures: select yes, then click on media to add pictures.
-
Supervisor/Foreman
-
Engineer Field Rep/Site Inspector: