Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Are lifting chains tagged and in good condition
-
Have they been checked by a competent prson
-
Are slings tagged with the correct coloured tag
Lifting equipment
-
Is there a rescue plan in place
-
Has a risk assessment been carried out
-
Harness's being worn ?
-
Is there a scaffold with edge protection
-
Is a plan of work in place
Working at height
-
Other issues
Other issues
-
Escape procedures in place
-
Risk assessment complete
-
Permit to enter issued
Confined spaces
-
Vibration, job rotation
-
Noise, ear protection
Hazardous operations
-
Secure site access
-
Hoarding or Heras fencing
Site security
-
Sub contractors RAMS
-
Employee training information up to date
-
Site specific employee inductions
-
Relevant H & S posters displayed
-
Risk Assessments in place
-
COSHH Assessments in place
-
Method statement in place and up to date
-
H & S file on site and up to date
Health & Safety file
-
Drying room provided
-
Toilet facilities clean
-
Hot & cold running water in toilet
-
Suitable toilet facilities
-
Welfare area clean
-
Facilities to heat food
-
Facilities to boil water
-
Suitable seating arrangements
-
Supply of drinking water
-
Washing facilities
Welfare arrangements
-
Suitable lighting in place
-
Access & egress routes free of loose cables and trip hazards
-
Stairwells clear
-
All waste materials removed
-
-
Access and egress routes clear
Houskeeping
-
Eye wash stations
-
Nearest A & E displayed
-
Correct number of 1st aiders and identified
-
1st aid station suitably identified
-
All contents in date
-
Suitably sized and number of 1st aid boxes
First Aid
-
Emergency exits marked and clear of debris
-
Warning bell/horn
-
Suitable fire extinguishers in place and correctly stored
-
Fire plan displayed
Fire arrangements/procedures
-
Plugs in good order
-
Cables in good order
-
PAT tested and tagged
Electrical plant
-
Flashing beacon in place and working
-
Operators training up to date
-
Seat belt being worn
-
Quick hitch safety pin in place
-
Daily plant check complete
Plant
-
All tools returned to store after use
-
Are all tools in a safe working condition
Portable tools
-
Are all services identified
Overhead /underground services
-
Excavation Safe and shored where required<br>
-
Services isolated
-
Services located by hand dig
-
Service information issued
-
Permit to dig issued
Excavations
-
Appropriate RPE issued and in use.
-
Appropriate PPE issued and in use
PPE/RPE
-
Banksman in use
-
Pedestrian segregation
-
Vehicle segregationists
Access/egress
-
Ladders in good condition and secure
-
Edge protection in place and secure
Edge protection/ladders
-
All personnel briefed
-
Risk assessment in place
-
Plan of Work inplace
Safety critical operations
-
Is paperwork complete and up to date
Daily diary
-
Are meetings logged and up to date
Safety meetings & toolbox talks
-
Are there any issues with the scaffold
-
Has the scaffold had a weekly inspection
-
Is a scafftag system in place