29.2 Customer Lead-in Underground
-
Conduit entry into pit to standard.
-
29-53-1 Minor
-
Add media
-
New 20mm lead-in conduit installed to standard; not exposed to termites and does not allow water to drain externally to house.
-
29-53-2 Major
-
Add media
-
Lead-in conduit neatly & securely attached to building.
-
29-53-3 Minor
-
Add media
-
Lead-in conduit type and size to standard.
-
29-53-4 Minor
-
Add media
-
Conduit at correct depth.
-
29-53-5 Minor
-
Add media
-
Correct cable type and size used i.e. RG6 or RG11
-
29-53-6 Major
-
Add media
-
RG6 /RG11 heat shrink present at tap port as per standard.
-
29-53-7 Minor
-
Add media
-
Thread moisture seal installed (rubber grommet).
-
29-53-8 Minor
-
Add media
-
Site left safe.
-
29-53-9 Major
-
Add media
29.3 Customer Lead-in Aerial
-
Riser pipe has correct depth of conduit.
-
NBN ID 29-54-1 Minor
-
Add media
-
Correct size riser pipe installed on pole.
-
NBN ID 29-54-2 Minor
-
Add media
-
Riser pipe neatly & securely attached to pole.
-
NBN ID 29-54-3 Minor
-
Add media
-
Aerial cable correctly attached to pole. I.e. screw hook / bandit tie.
-
NBN ID 29-54-4 Minor
-
Add media
-
Minimum ground clearance maintained.
-
NBN ID 29-54-5 Major
-
Add media
-
Nylon insulator fitted at building terminations.
-
NBN ID 29-54-6 Major
-
Add media
-
Correct cable type and size used.
-
NBN ID 29-54-7 Major
-
Add media
-
Correct separation from other services. (e.g. Metal objects - Power/Optus).
-
NBN ID 29-54-8 Major
-
Add media
-
200mm drip loop provided prior to entry into aerial fed PCD; No drip point for cable at customer premises.
-
NBN ID 29-54-9 Minor
-
Add media
-
Site left safe.
-
NBN ID 29-54-10 Major
-
Add media
29.4 Single Dwelling Cabling
-
PCD installed in correct location.
-
NBN ID 29-55-1 Minor
-
Add media
-
PCD installed.
-
NBN ID 29-55-2 Major
-
Add media
-
PCD cover secured correctly.
-
NBN ID 29-55-3 Minor
-
Add media
-
Cable entry at correct orientation i.e. cable enters from below into PCD.
-
NBN ID 29-55-4 Major
-
Add media
-
Rubber boot correctly fitted in PCD.
-
NBN ID 29-55-5 Minor
-
Add media
-
Isolator missing.
-
NBN ID 29-55-6 Major
-
Add media
-
Isolator not installed to standard.
-
NBN ID 29-55-7 Major
-
Add media
-
Splitter not installed to standard.
-
NBN ID 29-55-8 Minor
-
Add media
-
Amplifier not installed to standard.
-
NBN ID 29-55-9 Minor
-
Add media
-
Correct connector installed in PCD box.
-
NBN ID 29-55-10 Minor
-
Add media
-
Connector not fitted correctly (loose, etc.)
-
NBN ID 29-55-11 Minor
-
Add media
-
PCD Box incorrectly mounted (screws, etc.)
-
NBN ID 29-55-12 Minor
-
Add media
-
Site left safe.
-
NBN ID 29-55-13 Major
-
Add media
29.5 Multi Dwelling Unit Customers Connections
-
Correct cable separations from services.
-
NBN ID 29-56-1 Major
-
Add media
-
Cable installed to standard i.e. continuous run of cable from TAP to PCD.
-
NBN ID 29-56-2 Major
-
Add media
-
Isolator missing.
-
NBN ID 29-56-3 Major
-
Add media
-
PCD not secured correctly.
-
NBN ID 29-56-4 Major
-
Add media
-
Correct PCD has been used for an MDU.
-
NBN ID 29-56-5 Major
-
Add media
-
Rubber boot correctly fitted to PCD.
-
NBN ID 29-56-6 Major
-
Add media
-
PCD mounted / secured correctly.
-
NBN ID 29-56-7 Minor
-
Add media
-
Splitter installed with PCD.
-
NBN ID 29-56-8 Minor
-
Add media
-
Amplifier installed with PCD.
-
NBN ID 29-56-9 Minor
-
Add media
-
Correct connector used at tap location.
-
NBN ID 29-56-10 Minor
-
Add media
-
Connector fitted correctly (loose, etc.)
-
NBN ID 29-56-20 Minor
-
Add media
-
Site left safe.
-
NBN ID 29-56-21 Major
-
Add media
29.6 Multi Dwelling Unit Construction
-
Lead-in cable installed correctly.
-
NBN ID 29-57-1 Minor
-
Add media
-
Tap/device location protected.
-
NBN ID 29-57-2 Minor
-
Add media
-
Security Box correctly mounted (screws, etc.)
-
NBN ID 29-57-3 Minor
-
Add media
-
Cable supported and protected correctly.
-
NBN ID 29-57-4 Minor
-
Add media
-
Cables separated from other services correctly.
-
NBN ID 29-57-5 Major
-
Add media
-
Fire stopping reinstated.
-
NBN ID 29-57-6 Major
-
Add media
-
Suitable location for Backbone devices.
-
NBN ID 29-57-7 Minor
-
Add media
-
Backbone devices installed correctly.
-
NBN ID 29-57-8 Minor
-
Add media
-
Site left safe.
-
NBN ID 29-57-9 Major
-
Add media
29.7 Labelling
-
Customer service labelled correctly.
-
NBN ID 29-58-1 Minor
-
Add media
-
Power blocks labelled correctly (Red tape)
-
NBN ID 29-57-2 Minor
-
Add media
-
Contractor ID label/pride tag installed where required.
-
NBN ID 29-57-3 Minor
-
Add media
-
Network (feeder) cables labelled correctly (orange tape).
-
NBN ID 29-57-4 Minor
-
Add media
-
Earth wires labelled correctly (yellow tape).
-
NBN ID 29-57-5 Minor
-
Add media