Audit
Asset number
Size of job
Do residents need to be informed?
Work to be conducted
On-site power?
If so, where is it located?
On-site Water?
If so, where is it located?
Will a shutdown be required?
If so, estimated how long?
Are inflitrations visible?
If, where?
Coating thickness required
Are there any fixtures that need removed?
If so, what needs removed?
Are the any other obstructions in the asset?
If so, what?
Does the asset have a high or low flow?
If the job will take longer than a day is there a facility to heat the truck?
- Perfect, New concrete
- Stained but overall good
- Gas attack starting, light film
- Medium gas attack 3mm aggregate
- Heavy gas attack 6-50mm aggregate
- Existing coating
Benching condition
Does the aspro need replacing?
Other there any other risks identified with the asset or worksite?
Please give a brief description of the asset condition and associated site