Information
-
Jett Industries, Inc. EH&S Safety Checklist
-
Weather
-
Port Richmond WWTP
-
Conducted on
-
Gerald L. Brown
-
SSR Comments
-
Personnel
JOB INFORMATION
-
OSHA 300 forms complete and posted from February 1 - April 30?<br>
-
OSHA and DOL posters posted?
-
Emergency phone numbers posted?
-
Tool box safety talks log up to date?
-
MSDS filed?
-
Employee training records up to date and on file?
-
Work areas properly signed and barricaded?
HOUSEKEEPING
-
Work areas neat?
-
Projecting nails or screws bent over or removed?
-
Waste containers provided and used?
-
Passageways and walkways clear?
-
Cords and leads off the floor?
FIRE PREVENTION
-
Hot Work permit completed and in place?
-
Adequate fire extinguishers, checked and accessible?
-
Phone no. of Fire Department posted?
-
"No Smoking" posted and enforced near flammables?
ELECTRICAL
-
Extension wires with bare wires or missing ground prongs taken out of service?
-
Ground fault interrupters being used?
-
Terminal boxes equipped with required covers?
-
LOTO in place and logged as needed.
HAND, POWER & POWDER ACTUATED TOOLS
-
Hand tools inspected regularly?
-
Guards in place on machines?
-
Correct tool being used for job at hand?
-
Blades have been removed before storage of tools (Demo saw)?
-
Operators of powder actuated tools licensed?
FALL PROTECTION
-
Safety harnesses and yoyo's have monthly inspection completed?
-
Safety rails and cables secured properly?
-
Safety harnesses worn properly?
-
Employees exposed to fall hazards tied off?
-
Employees below protected from falling objects?
-
No employees endanger of implement?
LADDERS
-
Ladders extended at least 36" above landing?
-
Ladders are secure to prevent slipping, sliding or falling?
-
Ladders with split or missing rungs taken out of service?
-
Stepladders used in fully open position?
-
No step at top two rungs of stepladder?
SCAFFOLDING
-
Stair towers inspected and signed off daily.
-
All scaffolding inspected daily?
-
Erected on sound rigid footing?
-
Tied to structure as required?
-
Guardrails, intermediate rails, toe boards and screens in place?
-
Planking is sound and sturdy?
-
Proper access provided?
FLOOR & WALL OPENINGS
-
All floor openings covered and marked "HOLE" or "COVER" or barricaded?
-
Perimeter protection in place?
-
Deck planks secure?
-
Materials stored away from edge?
TRENCHES, EXCAVATION & SHORING
-
Competent person identified and present?
-
Excavations are shored and sloped back?
-
Materials are stored at least 2' away from trench?
-
Ladders provided every 25' in trench?
-
Equipment is at a safe distance from edge of trench or excavation?
MATERIAL HANDLING
-
Materials properly stored or stacked?
-
Employees using proper lifting techniques?
-
Tag lines used to guide loads?
-
Proper number of workers for each operation?
-
Materials not being stored in access.
WELDING AND BURNING
-
Gas cylinders stored upright?
-
Hard hats on all torch setups.
-
Flash back protectors located at the torch head and regulators.
-
Proper separating distances between fuels & oxygen?
-
Goggles or shields used?
-
Fire extinguishers readily available?
-
Hoses in good condition?
Equipment Inspection (loader, Telehandler, excavator, dozed, etc.)
-
Daily Visual Completed?
-
Seatbelt being worn.
Enviromental
-
Silt Fence in place and maintained
-
Barrier Fence Maintained
CRANES
-
Outriggers extended and swing radius barricade in place?
-
Outriggers on solid ground with proper pads or dunnage?
-
Operator is familiar with load charts?
-
Hand signal charts on crane?
-
Crane operator logs up to date?
-
Employees kept from under suspended loads?
-
Chains and slings inspected and tagged as required?
-
Employees have Qualified Signal and Rigging training?
CONCRETE CONSTRUCTION
-
Employees are protected from cement dust?
-
Exposed skin covered?
-
Runways are adequate?
PERSONAL PROTECTIVE EQUIPMENT
-
Proper gloves being worn?
-
Hard hats being worn?
-
Safety glasses being worn?
-
Respirators used when required? Proper respirator documentation available?
-
Hearing protection being worn when required?
-
Traffic vests or high visibility clothing material being worn?
Confined Space
-
JHA completed for the operation and reviewed with crew and signed.
-
Confine Space permit completed if needed.
-
Proper signage in place.
-
All employees confine space trained.
-
Air monitor has been calibrated and bump tested before use.
-
Emergency rescue equipment inspected and in place as needed.
-
Proper access in place as needed.
-
Respirators inspected and employee fit tested and med. clearance if needed.
Access
-
All access area are clear of snow, ice and mud?
-
All access areas are signed or barricaded as needed?
-
Employees using proper access?
-
Safety Manager
-
Superintendent
Incidents or Accidents
-
Accidents
-
Incidents
-
Violations or Stop work orders