Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Final Inspection Checklist for Controllers
-
Does the joystick move freely?
-
Is brush holder gap within 0.125" max and 0.0625 min (per Stephan French)?
-
Has unit been detailed up to Joy Global standards?
-
Is the work scope signed off?
-
Are all connections properly soldered and mechanically sound?
-
Mechanical interlock(s) functional.
-
Has service number stamped into body?
-
Have final photos been taken of the component?
-
Add parts list to the job pouch from warehouse / receiving area.
Job information
-
Inspectors name