Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Final Inspection Checklist for Letourneau Level Links
-
Has job number and country code been stamped into component?
-
Are bearings lubricated and wrapped properly?
-
Add parts list to job pouch from warehouse / receiving area.
-
Have final photos been taken of component?
-
Has work scope been filled out and initialed?
-
Has part number and weight been stenciled onto component?
-
Is the prep, paint, and detail of the component up to Joy Global standards?
-
Is the level link secured to the pallet?
-
Has a Joy Global tag been attached to component and is information correct?
Job information
-
Inspectors name