Information
-
Address: 3390 W. Alameda Ave.<br>Denver, CO 80219
-
Westwood Crossing
1677 -
Prepared by: Cory Jackson
Weather
-
Report Day: today
Weather
-
Weather Was Recorded At:
-
Temperature:
-
Precipitation:
-
Wind:
-
Weather Delays
-
Delay Details:
General Info
WORK ACTIVITY / FIELD FORCE
-
JHL Constructors
-
GC
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 02-Contractor:
-
Category:
-
Work Activity Details:
-
Work area:
-
Personnel
-
Photo's
-
Division 03-Contractor: Three Brothers Concrete, M&R Concrete, Brannan Concrete
-
Category: Concrete
-
Work Area:
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 04-Contractor: MixTech Masonry
-
Category: Masonry
-
Work Area:
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 05-Contractor: Summit Steel
-
Category: Metals
-
Work Area:
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 06-Contractor: DL Cohen
-
Category: Wood, Plastics, Composties
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 07-Contractor: United Insulators, MATO, Grabau Roofing
-
Category: Thermal and Moisture Protection
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 08-Contractor: UFPI, EAP Glass
-
Category: Openings
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 09-Contractor: WalPro
-
Category: Finishes
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 10-Contractor:
-
Category: Specialties
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 11-Contractor:
-
Category: Equipment
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 12-Contractor:
-
Category: Furnishings
-
Work Area:
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 13-Contractor:
-
Category: Special Construction
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 14-Contractor:
-
Category: Conveying equipment
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 21-Contractor: American Sprinkler
-
Category: Fire Suppression
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 22-Contractor: MAI Mechanical
-
Category: Plumbing
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 23-Contractor: LDI Mechanical
-
Category: HVAC
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 25-Contractor:
-
Category: Integrated Automation
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 26-Contractor: Wayne's Electric
-
Category: Electrical
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 27-Contractor:
-
Category: Communications
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 28-Contractor:
-
Category: Electronic Safety and Security
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 31-Contractor: LVI
-
Category: Earthwork
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 32-Contractor:
-
Category: Exterior Improvements:
-
Work Activity Details:
-
Personnel
-
Photo's
-
Division 33-Contractor: Soils Modification
-
Category: Utilities
-
Work Activity Details:
-
Personnel
-
Photo's
EQUIPMENT
EQUIPMENT:
-
Do you have heavy equipment on site?
-
Contractors with equipment:
- utility's
- earth work
- plumbing
- electrical
- irrigation
- framer
- structural steel
- general contractor
-
Type or equipment:
- motor grader
- loader
- track excavator
- skid steer
- mini excavator
- back hoe
- concrete pump
- forklift
- trencher
- hydro crane
- tower crane
-
Idle equipment:
- motor grader
- loader
- track excavator
- skid steer
- mini excavator
- back hoe
- concrete pump
- forklift
- trencher
- hydro crane
- tower crane
-
Maintenance being done:
-
Description of work:
-
Work area:
-
Is the equipment Rental or owned?
-
Additional comments:
Visitors
VISITORS
-
Do you have visitors on site?
-
Visitors's name's:
-
Company:
-
Arrival time:
-
Remarks:
-
Visitors signature if applicable:
MATERIALS
MATERIALS/DELIVERIES:
-
Did you have an delivery today?
-
Type of materials:
-
Delivery time:
-
Off load location:
-
Ticket number:
-
Description of materials:
-
Additional comments:
CHANGE ORDERS
CHANGE ORDERS:
-
Did you receive any change orders today?
-
Description of change:
-
Date initiated:
-
Notes:
-
Did you pass the change on to corresponding contractor?
Delays
Delays
-
Did you have any delays today?
-
List the cause of the delay:
-
Description of delay:
-
Activity ID:
-
Are there cost associated with this delay?
-
Start of delay:
-
Resolved date:
SAFETY
SAFETY
-
Did you have safety issues today?
-
Safety issue:
-
Cause of safety issue:
-
Was a subcontractor involved in the safety issue?
-
Name of contractor and employee:
-
Safety photo's:
-
Actions taken:
-
Superintendent:
-
Subcontractor:
INSPECTIONS
INSPECTIONS
-
Did you have 3rd PARTY, STATE, CITY, INSPECTIONS today?
-
Location:
-
Spec. Reference:
-
Pass/Fail
- PASSED
- FAILED
-
Is re-inspection required?
-
Is re-testing required?
-
Name of contractor:
-
Additional comments:
SCHEDULE-STORM WATER
SCHEDULE
-
Did you have any schedules issues today?
-
Schedule item:
-
Activity ID:
-
Title:
-
Start date:
-
Finish date:
-
Percentage:
-
Additional comments:
STORM WATER
-
Did you have any storm water issues today?
-
Storm water item:
-
Area:
-
Start date:
-
Finish date:
-
What repairs were made:
-
Additional comments:
Meetings
Meetings
-
Did you have any meetings today?
-
Type of meeting:
- OAC
- Subcontractor
- Prep meeting
- Safety meeting
- Inspectors
- Engineers
-
Meetings minutes:
-
Additional comments:
REPORT APPROVAL
REPORT APPROVAL:
-
Superintendent:
-
Field report prepared by: