Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
WEATHER:
-
Weather was recorded at:
-
Temperature:
-
Precipitation:
-
Wind:
-
Weather photo's:
-
Any weather delays?
-
Weather delay comments:
Site prep and utilities
1. SITE PREP AND UTILITIES:
-
Are you doing QC on SITE PREP and UTILITIES?
-
1.1. Do you have all required permits?
-
1.2. Do you have your SWMP permit and plans on site and posted ?
-
1.3. Do you have complete & approved plans, spec's, submittals ?
-
1.4. Do you have a signed contract for the contractor doing the work ?
-
1.5. Do you have the contractors safety plan ?
-
1.6. Have you done a prep meeting with the contractor on plans, spec's, submittals, safety, site lay down area and house keeping ?
-
1.7. Is the site survey complete ?
-
1.8. Do you have a site specific trenching/shoring/confined space safety plan ?
-
1.9. Do you have all material on site per plans, spec's, submittals ?
-
1.10. Does your SWMP show concrete wash out ? ( thrust blocks/inlets/man holes )?
-
1.11. Are you importing soil ? If so have you received a proctor on material ?
-
1.12. If you are importing or exporting soil, does your SWMP detail where it's coming from Or going too ? Does your permits cover this material ?
-
1.13. Have you had a pre-con with the testing agency to confirm spec's, and compaction requirements ?
-
1.14. Are inlets and manholes properly protected after installation ?
-
1.15. Do you have adequate cover for utilities being installed ?
-
1.16. Have you reviewed the soils report ?
-
Do you have current utility locates by excavating contractor ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Concrete foundations
2. CONCRETE FOUNDATION pre-pour checklist:
-
Are you doing QC on CONCRETE FOUNDATION pre-pour?
-
2.1. Do you have all permits on site ?
-
2.2. Do you have approved plans, spec's, submittals, shop drawings ?
-
2.3. Do you have a signed contract for the contractor doing the work ?
-
2.4. Do you have the contractors safety plan ?
-
2.5. Have you done a prep meeting with the contractor on plans, spec's, submittals, safety, site lay down area and house keeping ?
-
2.6. Do you have your 3rd party inspections scheduled ?
-
2.7. Are you prepared for cold/inclement weather ? ( blankets, ground heater, reinforced poly ) ?
-
2.8. Do you have all materials on site per plans, spec's, submittals, shop drawings ? ( rebar, bolts, embeds, sleeves ) ?
-
2.9. Do you have all contractors scheduled to install, bolt, embeds, rebar, sleeves ?
-
2.10. Do you need to install a building ground to foundation rebar ? ( UFER GROUND ) ?
-
2.11. Is your SWMP current and shows the location of the concrete washout ?
-
2.12. Do you have the foundation recessed at all doorways for SOG to pour through ?
-
2.13. Do you have access to footings with concrete trucks ?
-
2.14. Have you reviewed the soils report ?
-
2.15. Are you placing caissons ?
-
2.16. Have you reviewed the site boring report ? ( water table )
-
2.17. Do you have approved shop drawings for rebar cages ?
-
2.18. Do you have an approved detail for rebar cage splice ? ( caisson hole deeper than plan ) ?
-
2.19. Do you have all material on site per approved plans, shop drawings ?
-
2.20. Do you have rebar cages tied prior to drilling caissons ?
-
2.21. Do you have a drilling sleeve on site in case you incur water ?
-
2.22. Have you reviewed the spec's for concrete placement ? ( tail gate, concrete pump ) ?
-
2.23. Do you have clear access for drill rig, crane, concrete truck ?
-
2.24. Do you clear access to all bench marks for caisson elevations ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Concrete sog/sod
3. CONCRETE SOG/SOD pre-pour checklist:
-
Are you doing QC on CONCRETE SOG/SOD pre-pour?
-
3.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
3.2. Do you have a signed contract for the contractor doing the work ?
-
3.3. Do you have the contractors safety plan ?
-
3.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
3.5. Do you have all material on site per plans, spec's, submittals, shop drawings ? ( rebar, rebar chairs, wire mesh, vapor barrier, expansion joint etc ) ?
-
3.6. Do you have all underground complete and inspected ? ( plumbing, electrical ) ?
-
3.7. Do you have all waterproofing, sleeves etc installed ?
-
3.8. Do you have 3rd party inspections scheduled ?
-
3.9. Do you have under slab insulation ?
-
3.10. Has sub grade been tested and approved ?
-
3.11. Do you have lock outs, recessed slabs, slopes, floor drains, shower drains ?
-
3.12. Do you have concrete curing agents to apply ? Are they correct for floor finishes ? ( polished concrete, tile, carpet etc ) ?
-
3.13. Do you have moisture sensitive flooring ? SEE SECTION 19
-
3.14. Do you have the SDS sheets on the curing agents on site and are they accessible ?
-
3.15. Is your SWMP current and show the location of the concrete washout ?
-
3.16. Have you reviewed the control joint layout with the design team ?
-
3.17. Do you have electrical floor boxes ? Are they installed ?
-
3.18. Have you verified finished floor thickness and set floor drains, mop sinks, floor sinks, shower drains to appropriate heights ?
-
3.19. Do you have subcontractors on pour watch ?
-
3.20. Have you reviewed the specifications to confirm curing requirements, wet cure, chemical cure etc ?
-
3.21. Are plans in place for protection of slabs that will have finished concrete, polished/sealed concrete ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Site concrete/paving
4. SITE CONCRETE/PAVING pre-pour checklist:
-
Are you doing QC on SITE CONCRETE/PAVING pre-pour?
-
4.1. Do yo have approved plans, spec's, submittals, shop drawings ?
-
4.2. Do you have a signed contract for the contractor doing the work ?
-
4.3. Do you have the contractors safety plan ?
-
4.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
4.5. Do you have all materials on site per plans, spec's, submittals, shop drawings ? ( wire mesh, expansion joint, dowels, sidewalk chases etc ) ?
-
4.6. Has sub grade been tested and approved ? Is proof roof required/passed ?
-
4.7. Is the survey complete ? ( TBC, HC chases, ramps, etc ) ?
-
4.8. Do you have 3rd party inspections scheduled ?
-
4.9. Do you have all underground complete ? ( site electrical, irrigation sleeves, utilities, etc ) ?
-
4.10. Are you prepared for winter protection ? ( blankets, ground heater, reinforced poly ) ?
-
4.11. Are you using concrete curing agents ? Do you have current SDS sheets on site and are they accessible ?
-
4.12. Is your SWMP current and show the location of the concrete washout ?
-
4.13. Have you reviewed control joint layout with the design team ?
-
4.14. Do you have corner bars added at all outside corners ?
-
4.15. Has a ROW pre-con meeting been conducted if applicable ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Tilt-up/pre-cast pre pour
5. TILT-UP/PRE-CAST pre-pour checklist:
-
Are you doing QC on TILT-UP/PRE-CAST pre-pour?
-
5.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
5.2. Do you have a signed contract for the contractor doing the work ?
-
5.3. Do you have the contractors safety plan ?
-
5.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
5.6. Have you reviewed plans to insure all embeds, line up at tie points, bracing points, pick points, etc ) ?
-
5.5. Do you have all materials on site per plans, spec's, submittals, shop drawings ? ( forms,sleeves, embed, wire mesh, HMFS, wood bucks, etc ) ?
-
5.7. Have you verified all block outs, sleeves, and rough in are installed ?
-
5.8. Have you reviewed layout of all reveals in panel surface's ?
-
5.9. Do you have curing/release agents being used ? Do you have current SDS sheet on site and accessible ?
-
5.10. Is insulation of proper thickness and butted tightly ?
-
5.11. Has the engineer of record inspected the panels prior to concrete placement ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Tilt-up/pre-cast pre erection
6. TILT-UP/PRE-CAST pre-erection checklist:
-
Are you doing QC on TILT-UP/PRE-CASE pre erection?
-
6.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
6.2. Do you have a signed contract for the contractor doing the work ?
-
6.3. Do you have the contractors safety plan ?
-
6.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
6.5. Do you have an approved panel bracing plan ? Signed by a licensed structural engineer ?
-
6.6. Do you have concrete test reports on site showing concrete strengths in panels and SOG ? Do they meet or exceed plans and spec's ?
-
6.7. Have you checked all embed layout prior to picking ? ( tie points, pick point, bracing points ) ?
-
6.8. Do you have welding certifications for Antoine welding on site and are they current ?
-
6.9. Do you have all materials on site ?
-
6.10. Have you done a site safety meeting with all trades to notify of heavy equipment operations starting ? ( CRANES )
-
6.11. Has crane access been inspected and verified with crane operator ?
-
6.12. Do you have a copy of crane operators certification on file ?
-
6.13. Do you have a copy of rigger/signal personal training certification on file ?
-
6.14. Are all crane inspections/certifications current ?
-
6.15. Have you reviewed the picking/erection plan ?
-
6.16. Has the subcontractors competent person verified installed bracing matches the plan ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Pre-steel erection
7. STEEL ERECTION pre-erection checklist:
-
Are you doing QC on STEEL ERECTION pre-erection?
-
7.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
7.2. Do you have a signed contract for the contractor doing the work ?
-
7.3. Do you have the contractors safety plan ?
-
7.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety,site lay down area and house keeping ?
-
7.5. Do you have welding certifications for anyone welding and are they current on site ?
-
7.6. Do you have 3rd party inspections scheduled ?
-
7.7. Do you have all materials on site ?
-
7.8. Have you checked all bolt patterns, layout, locations ?
-
7.9. Have you provided grid lines, offsets, bench marks for control ?
-
7.10. Prior to any columns being set, do you have written notification of any repaired,replaced or field modified anchor bolts and certification that those modifications were done with the approval of the structural engineer of record ?
-
7.11.have you done a site safety meeting with all trades notifying them of heavy equipment operations starting ? ( CRANES )
-
7.12. All trades acknowledged that no work will be allowed under the steel erection at anytime ?
-
7.13. Will arrangements be made for steel erector to leave fall protection in place for other trades to use ?
-
7.14. Is there adequate access for cranes and trucks and equipment ? Is the site prepped, graded, and compacted for crane placement ?
-
7.15. Fully planked or decked floor or nets must be installed and maintained within two stories or 30 feet whichever is less, directly under erection work ?
-
7.16. Plumbing-up equipment must be properly installed before the structure is loaded with construction materials ?
-
7.17. Metal deck must be secured against displacement before end of shift ?
-
7.18. Floor openings must be covered and marked of protected by guardrails or nets ?
-
7.19. Metal deck must be secured upon placement ?
-
7.20 columns will be anchored with a minimum of 4 anchor bolts ? If not you must have documentation signed by the engineer of record ?
-
7.21. Competent person must determine whether guying or bracing is required ?
-
7.22. Will perimeter safety cable be installed at the final interior & exterior perimeter of the floor & roof before the metal decking is installed ?
-
7.23. All steel erection employees must have and use fall protection when 15'-0" and above ?
-
7.24. Have all connectors and employees working within the CDZ been trained in accordance with ( 1926.761 ) ?
-
7.25. Is the CDZ-controlled decking zone restricted to employees engaged in the leading edge work ?
-
7.26. A good accessible ladder must be installed to upper and lower floors ?
-
7.27. Steel erector must provide to CONTRACTOR Documentation that all their employees have been trained in fall HAZARDS ?
-
7.28. Do you have on file crane operators certifications ?
-
7.29. Do you have on file rigger/signal personal certifications ?
-
7.30. Do you have on file crane certification/inspections ?
-
7.31. Have you verified the concrete is at appropriate strength and provided notification to the erector ?
-
7.32. Have you reviewed where architectural metals will be installed during the steel erection sequence and made a plan for protection of these materials through construction ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Masonry structural
8. MASONRY STRUCTURAL checklist:
-
Are you doing QC on MASONRY STRUCTURAL?
-
8.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
8.2. Do you have a signed contract for the contractor doing the work ?
-
8.3. Do you have the contractors safety plan ?
-
8.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety,site lay down area and house keeping ?
-
8.5. Do you have all materials on site per plans, spec's, submittals, shop drawings ?
-
8.6. Do you have 3rd party inspections scheduled ?
-
8.7. Has the contractor done the site prism's ?
-
8.8. Have the masonry control joint locations been reviewed and coordinated with exterior veneer ?
-
8.9. Have you done a site subcontractor coordination meeting for masonry accessories ? ( sleeves, electrical, plumbing, HVAC, HMFS, etc ) ?
-
8.10. Have you done a site safety meeting to notify all trades of heavy equipment operations starting or ongoing ? ( FORKLIFT ) ?
-
8.11. Is your SWMP current and shows the location for washout and masonry mix area ?
-
8.12. Will you be doing daily inspections on anchors, ties, mortar net, weep vents, reinforcement, horizontal, vertical and size ?
-
8.13. Will non-compliance notice's be issued for any work noted above ? See JHL forms, non-conformance and Stop work orders.
-
8.14. Do you have signed documentation showing structural steel contractor is complete and allowing other trades to tie in or load the structure ?
-
8.15. Do you have a cold weather placement plan ?
-
8.16. Do you have an approved bracing plan ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Wood framing
9. WOOD FRAMING checklist:
-
Are you doing QC on WOOD FRAMING?
-
9.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
9.2. Do you have a signed contract for the contractor doing the work ?
-
9.3. Do you have the contractors safety plan ?
-
9.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
9.5. Will the contractor be using forklift/high reach equipment ? If so do you have documentation showing contractors employees have been trained ?
-
9.6. Does the plans, spec's, cal for certified lumber ? If so do you have certified documentation ?
-
9.7. Have you done a site safety meeting with all trades notifying of heavy equipment operations starting or ongoing ?
-
9.8. Have you checked foundations for plumb, level, square ?
-
9.9. Have you checked foundations for correct layout of bolts, embeds, straps, hold downs, etc ?
-
9.10. Have you shim/shave and straight edge walls ?
-
9.11. Do you have structural steel to be installed prior to wood framing ? If so have you checked plumb, level, square ?
-
9.12. Do you have sign off documentation from the structural steel contractor allowing tie in or loading the structure ?
-
9.13.has the contractors employees been trained in fall protection ? Do you have documentation showing employee training ?
-
9.14. Do you have all materials on site per plans, spec's, submittals, shop drawings ?
-
9.15. Are materials stored Ina safe manner and off the ground/mud ?
-
9.16. Do you have shop drawings for store front, curtain wall, punched openings, HMFS, for R.O. And backing/blocking ?
-
9.17. Do you have shop drawings for all interior, toilet partitions, restroom hardware, marker boards, fire extinguisher cabinets, handrails, millwork, etc ?
-
9.18. Do you have fire protection in place ? No smoking signs in place ?
-
9.19. Do you have documentation of truss repairs, sealed by truss engineer ?
-
9.20. Have you reviewed/coordinated all material planing issues due to shear walls ?
-
9.21. Have you verified all pre-rock requirements ?
-
9.22. Have you reviewed sill gasket requirements ?
-
9.23. Has framing contractor verified top of foundation/slab flatness prior to standing walls ?
-
9.24. Have all window RO's been reviewed with framer and glazer prior to framing the openings ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Metal stud framing structural
10. METAL STUD FRAMING STRUCTURAL checklist:
-
Are you doing QC on METAL STUD FRAMING STRUCTURAL?
-
10.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
10.2. Do you have a signed contract for the contractor doing the work ?
-
10.3. Do you have the contractors safety plan ?
-
10.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
10.5. Will the contractor be using forklift/high reach equipment ? If so do you have documentation showing employee training ?
-
10.6. Have you done a site safety meeting with all trades notifying of heavy equipment operations starting or ongoing ?
-
10.7. Have you checked foundations for plumb, level, square, bolts, embeds, straps ? If so are they in the correct location and elevation ?
-
10.8. Do you have all structural steel in place all bolts, welding, bracing complete ?
-
10.9. Have you had 3rd party inspections and do you have documentation showing sign off ?
-
10.10. Is all safety cabling in place ?
-
10.11. Has structural steel contractor signed off to allow tie in or loading of structure ?
-
10.12. Do you have all material on site per plans, spec's, submittals, shop drawings ?
-
10.13.do you have welding certifications for anyone doing welding ? ( jamb studs, clips, headers ) ?
-
10.14. Do you have documentation showing contractor has trained his employees in fall protection ?
-
10.15.is the site clean and swept prior to structural framing starting ?
-
10.16. Do you have shop drawings for store front, curtain wall, punched openings, wood Windows, awnings, HMFS, for R.O. And blocking ?
-
10.17. Have all window RO's been reviewed with framer and glazer prior to framing the openings ?
-
10.18. Have you met sill gasket requirements ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Metal stud framing light gage
11. METAL STUD FRAMING LIGHT GAGE checklist:
-
Are you doing QC on METAL STUD FRAMING LIGHT GAGE?
-
11.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
11.2. Do you have a signed contract for the contractor doing the work ?
-
11.3. Do you have the contractors safety plan ?
-
11.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
11.5. Will the contractor be using scaffolding or high reach equipment ? If so do you have documentation showing competent person and employee training ?
-
11.6. Have you done a coordination meeting with MEP contractors for layout on panel locations, duct openings, pipe/plumbing chases, fire/smoke walls and respecting others work ?
-
11.7. Have you checked that structural steel is plumb, level, square, all welds and bolts complete, all bracing is complete ?
-
11.8. Do you have 3rd party inspections complete and documentation in hand ?
-
11.9. Do you have documentation showing structural steel contractor has signed off allowing tie in or loading of structure ?
-
11.10. Do you have all materials on site per plans, spec's, submittals, shop drawings ? ( plate seal, track, slip track, studs, bridging, HMFS, etc ) ?
-
11.11. Do you have shop drawings for HMFS, toilet partitions, restroom hardware, marker boards, fire extinguisher cabinets, handrails, millwork, etc ?
-
11.12. Have you verified special gauge requirements for corner studs, King studs, etc ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Pre meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Roofing general
12.ROOFING GENERAL checklist:
-
Are you doing QC on ROOFING?
-
12.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
12.2. Do you have a signed contract for the contractor doing the work ?
-
12.3. Do you have the contractors safety plan ?
-
12.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
12.5. Have all structural steel inspections been completed and signed off " ROOF READY " ?
-
12.6. Do you have documentation signed by structural steel contractor allowing tie in and loading the structure ?
-
12.7. Are concrete cure inspections complete ?
-
12.8. Has roofing contractor signed off that sub surfaces are complete and ready to be covered ?
-
12.9. Are all roof penetrations cored and installed, all fall protection points are installed, and entry platforms post/screen wall post installed and ready to be covered ?
-
12.10. Are roof expansion joints properly blocked/rated ?
-
12.11. Parapet cap/roof blocking installed and ready to cover ?
-
12.12.all fire/smoke stopping complete ?
-
12.13. All roof surfaces cleaned and free of debris ?
-
12.14. Are roof drains and over flows installed and ready to cover ? Have you had a coordination meeting with the roofer/plumber to verify drain elevations ?
-
12.15. Are tops of all roof curbs at least 8 inches above adjacent finished roof height ?
-
12.16. 2 layered insulation joints are offset at a minimum 12 inches ?
-
12.17. Cover board joints are offset at a minimum 6 inches to the insulation joints ?
-
12.18. Have you verified fastener pattern/spacing for corners, perimeter, and field ?
-
12.19. PVC membrane seams are 100% probed for weld integrity ?
-
12.20. Membrane boots are installed per plans and spec's ?
-
12.21. Has FINISHED ROOFING signage been posted ?
-
12.22. Has the roofing manufacture done the final roof inspection ?
-
12.23. Are all plumbing and electrical penetrations at least 12" away from adjacent vertical surface's ?
-
12.24. Has the plumbing contractor coordinated vent locations with outside air intakes on equipment ?
-
12.25. Is end of day water cut off being installed and materials properly protected ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Roofing type 1 ( fully adhered metal decking )
12. ROOFING TYPE 1 ( FULLY ADHERED METAL DECKING ) checklist:
-
Are you doing QC on ROOFING TYPE 1 ( FULLY ADHERED METAL DECKING )?
-
YOU MUST DO SECTION 12.ROOFING GENERAL ?
-
12.26. Adhesion test positive ?
-
12.27. Roof hatch and ladder curbs complete ?
-
12.28. Loose laid insulation is laid and sloped per plans, spec's ?
-
12.29. Are all roof curb insulated to avoid condensation ?
-
12.30. Cover board and rhino bond fasteners installed per manufactures instructions ?
-
12.31. PVC-1 membrane properly attached per rhino bond anchoring system, all welded seams overlapped a minimum 3 inches if mechanically and 4 inches if hand welded ?
-
12.32. Membrane runs up and over parapet and covers the outside of cap ?
-
12.33. Walkway paths are installed per plans and spec's ?
-
12.34. Is vapor barrier required ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Roofing type 2. ( fully. Adhered to concrete )
12. ROOFING TYPE 2 ( FULLY ADHERED TO CONCRETE DECKING )checklist:
-
Are you doing QC on ROOFING TYPE 2 ( FULLY ADHERED TO CONCRETE ) ?
-
YOU MUST DO SECTION 12. ROOFING GENERAL ?
-
12.38. Adhesion test positive ?
-
12.39. Vapor retarder, insulation, and plywood in installed per plans and spec's ?
-
12.40. Roof expansion joint is framed per plans, spec's, ( blocking/backing ) ?
-
12.41. Insulation is fully adhered and slopes per plans and spec's ?
-
12.42. Cover board is fully adhered to insulation ?
-
12.43. Is vapor barrier required ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Roofing type 3 ( fully adhered to wood ddecking )
12. ROOFING TYPE 3 ( FULLY ADHERED TO WOOD DECKING ) checklist:
-
Are you doing QC on ( FULLY ADHERED TO WOOD DECKING )?
-
YOU MUST DO SECTION 12. ROOFING GENERAL ?
-
12.46. Adhesion test is positive ?
-
12.47. Vapor retarder, insulation and plywood in installed per plans, spec's ?
-
12.48. Roof expansion joint is framed per plans, spec's ? (Blocking/backing )
-
12.49. Insulation is fully adhered and slopes per plans, spec's ?
-
12.50. Cover board is fully adhered to roof insulation ?
-
12.51. Is vapor barrier required ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Roofing type 4 (( ballasted metal deck ) Roofing type 5 ( ballasted concrete deck )
12. ROOFING TYPE 4 ( BALLASTED METAL DECKING ) ROOFING TYPE 5 ( BALLASTED CONCRETE DECKING ) checklist:
-
Are you doing QC on ROOFING TYPR 4 ( BALLASTED METAL DECK ) ROOFING TYPE 5 ( BALLASTED CONCRETE DECK ) ?
-
YOU MUST DO SECTION 12. ROOFING GENERAL ?
-
12.56. Loose laid vapor barrier installed per plans and spec's ?
-
12.57. Loose laid insulation is laid and slopes per plans and spec's ?
-
12.58. Loose laid PVC-2 membrane is installed per plans and spec's ?
-
12.59. PVC-2 is mechanically fastened or full adhered at the perimeter pre plans and spec's ?
-
12.60. PVC-2 continue up and over parapet cap per plans and spec's ?
-
12.61. Have you had final inspection prior to covering with ballast ?
-
12.62. Protection layer over PVC is installed with 6 inch overlap, and 12 inch overlap at penetrations ?
-
12.63. Protection membrane to be ballasted at the end or each day ?
-
12.64. Size 3 aggregate used 12 LB per SQ FT field and 15 LB at perimeter ?
-
12.65. Roof pavers installed per plans and spec's ?
-
12.66. Does the membrane of up and over the parapet cap and cover the outside of cap ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Roofing built-up
12. ROOFING BUILT-UP
-
Are you doing QC on ROOFING BUILT-UP ?
-
12.70. YOU MUST DO SECTION 12. ROOFING GENERAL ?
-
12.71. Do you have all deck inspections signed off ? ( concrete, metal, wood ) ?
-
12.72. Have the roofing contractor signed off that the roof is clean and ready to cover ?
-
12.73. Do you have all roof blocking complete ? ( edge, rakes, curbs, can't strip, parapet, etc ) ?
-
12.74. Is all roof blocking NON-COM material ?
-
12.75. Do you have the pot location shown on your SWMP ?
-
12.76. Do you have the area around the pot and under the feeder line safed off with RED danger tape ?
-
12.77. Has the pot operator been trained in emergency procedures, ( fire, splash back, etc ) ?
-
12.78. Is vapor barrier required ?
-
12.79. Have the roof insulation been installed correctly, laps, thickness, slope's, crickets etc ?
-
12.80. Has the base sheet been turned over the outside nailer minimum 1 1/2" ?
-
12.81. Have all pre metals been installed per manufactures instructions ?
-
12.82. Has final edge cap/gravel stop been installed, set in mastic and nailed off at 3" OC staggered ?
-
12.83. Has the edge metal joint covers been installed 4" to 6" wide and set in mastic ?
-
12.84. Does the base flashing go up and over the parapet cap and cover the outside cap ?
-
12.85. Are you using surface mounted counter flashing ?
-
12.86. Are you using the correct primers and mastic's and base sheets ?
-
12.87. Has the owner been made aware that the top of surface mounted flashings is a maintenance item and must be maintained through out the life of the roof ?
-
12.88. Have you reviewed the manufactures instructions for installing drains ?
-
12.89. Have you reviewed the manufactures instructions for curb flashing ?
-
12.90. Have you reviewed the manufactures instructions for inside/outside corners ?
-
12.91. Do you have expansion joints ? Are they framed correctly ? ( Width, height, materials, etc ) ?
-
12.92. Have you reviewed manufactures instructions for expansion joints ?
-
12.93. Have you reviewed the manufactures instructions for vent stack flashing ?
-
12.94. Have you reviewed manufactures instructions for pan/pitch pocket flashing ?
-
12.95. Have you reviewed the manufactures instructions for scupper flashing ?
-
12.96. Have you reviewed manufactures instructions for mechanical equipment stand ?
-
12.97. Do you have the work area below the area being roof blocked off with danger tape and notified all trades of potential for HOT asphalt dripping through ?
-
12.98. Do you have a fire watch set up ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC inspection:
-
Project manager:
-
Superintendent:
-
Subcontractor:
Waterproofing Horziontal and Vertical-fluid applied or membrane
13. WATERPROOFING HORIZONTAL and VERTICAL -fluid applied checklist:
-
Are you doing QC on WATERPROOFING HORIZONTAL and VERTICAL -fluid applied ?
-
13.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
13.2. Do you have a signed contract for the contractor doing the work ?
-
13.3. Do you have the contractors safety plan ?
-
13.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
13.5. Are you doing HORIZONTAL or VERTICAL ?
- horizontal
- vertical
-
13.6. FLUID APPLIED or MEMBRANE ?
- fluid applied
- membrane
-
13.7. Do you have all materials on site per plans, spec's, submittals, shop drawings ?
-
13.8. Have you checked the surface, for cleanliness, dust free, remove pins, bolts, concrete fins ?
-
13.9. Are the footings clean, free of dirt and concrete rubble ?
-
13.10. Have you patched all form ties, bug holes and major gouges ?
-
13.11.do you have drains in the horizontal slabs ? Are they installed and flashed correctly ? Verify weep holes and keep them clear ?
-
13.12. Have you done moisture testing on walls and slabs ? Do you have documentation showing its ok to cover ?
-
13.13. Do you have drain board ?
-
13.14. Do your details call for fluid applied waterproofing under concrete slabs ? IF YES STOP WORK AND CALL THE OFFICE !
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Superintendent:
-
Subcontractor:
Waterproofing for Sheet membrane and Flexible Flashing
13. WATERPROOFING for SHEET MEMBRANE and FLEXIBLE FLASHING checklist:
-
Are you doing QC on WATERPROOFING for SHEET MEMBRANE and FLEXIBLE FLASHING ?
-
13.21. Do you have approved plans, spec's, submittals, shop drawings ?
-
13.22. Do you have a signed contract for the contractor doing the work ?
-
13.23. Do you have the contractors safety plan ?
-
13.24. Have you done a pre meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
13.25. Where are you doing the work?
- foundations
- first floor
- second floor
- third floor
- fourth floor
- fifth floor
- roof
- decking
-
13.26. Do you have all materials on site per plans, spec's, submittals, shop drawings ?
-
13.27. Are materials stored in a safe and clean manner, off the ground/mud ?
-
13.28. Have you checked all surfaces to sure they are free of dust, dirt, concrete fins, bolts, anchors, split lumber/plywood ?
-
13.29. Do you have current SDS sheets on sealers, mastic's, cleaners ? Are they on site and accessible ?
-
13.30. Verify if installers are required to be factory trained ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Superintendent:
-
Subcontractor:
Drywall
14. DRYWALL pre-rock checklist:
-
Are you doing QC on DRYWALL pre rock ?
-
14.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
14.2. Do you have a signed contract for the contractor doing the work ?
-
14.3. Do you have the contractors safety plan ?
-
14.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
14.5. Do you have all materials on site per plans, spec's, submittals, shop drawings ?
-
14.6. Are all materials stored in a clean and safe manner off the ground/mud ?
-
14.7. Have you checked walls and ceilings for plumb, level, square ?
-
14.8. Have you checked for bowed, twisted studs, all walls have been straight edged and planed ?
-
14.9. Checked all blocking/backing, including ADA handrails, balcony rails, stair rails, cabinets, smart boards, toilet partitions, door stops, etc ?
-
14.10. Check all draft stop, vertical and horizontal ?
-
14.11. Check sub floors for damage and soft spots ? ( for material staging )
-
14.12. Confirm point load locations ? ( for material staging )
-
14.13. Confirm materials for fire ratings and sill treatment ?
-
14.14. Confirm window and door locations, opening sizes and coordinate with floor thickens system ? Check all door/window HMFS for plumb, level, square, cross string ?
-
14.15. Check windows are installed properly and operate easily ?
-
14.16. Confirm ADA/ANSI unit requirements and dimensions ?
-
14.17. Confirm proper installation of structural hardware, hangers, straps, anchors, bolts, compression post etc ?
-
14.18. Confirm header and beam locations, type and installation ( cripples and King studs ) ?
-
14.19. Confirm wall types, sheer wall location and construction ?
-
14.20. Is drywall being used in a shear application ? If so verify edge blocking and nailing requirements ?
-
14.21. Has bottom track been cleaned and vacuumed ?
-
14.22. Confirm building is clean and swept ?
-
14.23. Is framing complete and inspected by City Official, 3rd party inspector, and structural engineer of record ? Do you have a signed copy of the inspection ?
14. DRYWALL pre-rock ( ELECTRICAL )
-
14.26. All nail plates installed correctly ?
-
14.27. Fire protection has been installed around all conduit/MC cable above ceilings and walls ?
-
14.28. All gypsum board in fire rated partitions due to electrical conduit/MC cable installation is free of damage ?
-
14.29. Any and all blocking used by contractor is complete ?
-
14.30. All boxes have proper support ears for the partition type they are in, secure, and in the right location ?
-
14.31. Have mud rings been coordinated to account for double layered walls where required ?
-
14.32. Have box walks been complete with the owners ?
-
14.33. Electrical inspection has been performed by City Official or State inspector ?
14. DRYWALL pre-rock ( PLUMBING )
-
14.36. All water lines/waste and vent have been tested ?
-
14.37. Fire protection has been installed around lines above ceilings and fire rated partitions ?
-
14.38. All plumbing lines are strapped correctly ?
-
14.39. All nail plates are installed correctly ?
-
14.40. All gypsum board in fire rated partitions due to piping installation is free from damage ?
-
14.41. Any and all blocking used by subcontractor is correctly installed ?
-
14.42. All piping has been insulated complete and correctly ?
-
14.43. Have clean outs locations been coordinated not to span dissimilar materials ?
-
14.44. Plumbing inspection has been performed by City Official or State inspector ?
14. DRYWALL pre-rock ( FIRE PROTECTION )
-
14.46. All penetrations through fire rated partitions above ceiling level have had fire protection installed ?
-
14.47. All sprinkler line have been tested ?
-
14.48. All sprinkler heads have been capped or protected ?
-
14.49. Water has been placed into the system, tested at 200 PSI for 2 hours and holding ?
-
14.50. If you don't have heat in the building have you drained the system ?
-
14.51. Sprinkler inspection has been performed by the State inspector ?
14. DRYWALL pre-rock ( HVAC )
-
14.56. All penetrations through fire rated partitions above ceiling level have had fire protection installed ?
-
14.57. All duct penetrating the exterior walls have been properly sealed ?
-
14.58. All duct supply drops and returns are in the correct locations ?
-
14.59. All flex duct is properly secured and the correct length per plans, spec's, and code ?
-
14.60. All supply's and returns are properly covered to keep small animals, and drywall dust out ?
-
14.61. All line sets are run and have been tested ?
-
14.62. All condensate drains are sloped and properly secured ?
-
14.63. All fire/smoke dampers have been tested and inspected ?
-
14.64. All fan boxes/VAVs have adequate access to controls, not blocked by conduit, sprinkler lines, AV/fire alarm ?
-
14.65. Are RO's for fire/smoke dampers correct ?
-
14.66. HVAC inspection has been performed bey the City Official or State inspector ?
14. DRYWALL pre-rock ( LOW VOLTAGE )
-
14.69. SOHO/Main rack or Black box has been installed, and in the proper location ?
-
14.70. Checked phone back board is fire rated ? Including ground bar and mule tape in service conduits ?
-
14.71. All penetrations are properly fire sealed ?
-
14.72. All boxes in the correct locations and secure ?
-
14.73. All gypsum board in fire rated partitions due to wiring installation is free from damage ?
-
14.74. Checked that all over head cabling has been installed and secured per plans, spec's, and code ? Plenum rated where required ?
-
14.75. Low Voltage inspection has been performed by City Official or State inspector ?
14.DRYWALL pre-rock ( INSULATION )
-
14.79. All rock wool is in place for fire blocking on party walls ?
-
14.80. All insulation in ceilings and walls are installed with proper R Value ?
-
14.81. Vapor barrier has been installed correctly on exterior walls ?
-
14.82. Spray foam if required is complete and has been inspected ?
-
14.83. Interior wall penetrations from floor to floor have been sealed ?
-
14.84. All ceiling and wall insulation inspection has been performed by City Official or 3rd party inspector ?
14. DRYWALL pre-rock ( GENERAL )
-
14.89. All blocking and or strapping in fire rated partitions is fire rated wood ( NON COM ) ?
-
14.90. All Windows have been waterproofed ?
-
14.91. All wall penetrations to be above ceiling have been verified for fire stop ? ( duct,electrical. Plumbing, cabling etc ) ?
-
14.92. Building is clean and swept ready for drywall ?
-
14.93. All trade inspections have been accounted for ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Superintendent:
-
Subcontractor: Electrical:
-
Subcontractor: Plumbing:
-
Subcontractor: Sprinkler:
-
Subcontractor: HVAC:
-
Subcontractor: Low Voltage:
-
Subcontractor: Insulation:
Ceiling tile pre-tile checklist
15. CEILING TILE pre-tile checklist:
-
Are you doing QC on CEILING TILE pre tile?
-
15.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
15.2. Do you have a signed contract for the contractor doing the work ?
-
15.3. Do you have the contractors safety plan ?
-
15.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
15.5. Will the contractor be using scaffolding or high reach equipment ? If so do you have documentation showing competent person and employee training ?
-
15.6. Do you have all material on site per plans, spec's, submittals, shop drawings ?
-
15.7. Is HVAC above ceiling complete and inspected ?
-
15.8. Is electrical above ceiling complete and inspected ?
-
15.9. Is plumbing above ceiling complete and inspected ?
-
15.10. Is fire suppression above ceiling complete and inspected ?
-
15.11. Is low voltage above ceiling complete and inspected ?
-
15.12. Are all fire/smoke penetrations complete and inspected ?
-
15.13. Do you have all electrical boxes above ceiling clearly marked ?
-
15.14. Are all fire/smoke dampers/FPB clearly marked on the grid for location ?
-
15.15. Do you have all plumbing valves tagged per plans and spec's ? ( domestic water, hydronic system, supply, returns etc ) ?
-
15.16. Above ceiling insulation where required ?
-
15.17. Is light fixture tenting required ? Do you have the correct clearance's ?
-
15.18. Are hold down clips required ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Superintendent:
-
Subcontractor: Electrical:
-
Subcontractor: Plumbing:
-
Subcontractor: HVAC:
-
Subcontractor: Fire Suppression:
-
Subcontractor: Low Voltage:
Window rough in
16. WINDOW ROUGH IN checklist:
-
Are you doing QC on WINDOW ROUGH IN ?
-
16.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
16.2. Do you have a signed contract for the contractor doing the work ?
-
16.3. Do you have the contractors safety plan ?
-
16.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
16.5. Will the contractor be using scaffolding or high reach equipment ? If so do you have documentation showing competent person and employee training ?
-
16.6. Do you have all materials on site per plans, spec's, submittals, shop drawings ?
-
16.7. Are all materials stored in a dry and safe manner, off the ground/mud ?
-
16.8. Elevation ( facing ) ?
- north
- south
- east
- west
-
16.9. Floor?
- 1st
- 2nd
- 3rd
- 4th
- 5th
-
16.10. Window type ?
- curtain wall
- store front
- punch opening
- wood window
- vinyl windows
-
16.11. Window number ? ( always north-south and east-west )
-
16.12. Is initial flashing complete ?
-
16.13. Window wrap secured ( 2 X 4s typically )
-
16.14. Flex wrap at all corners installed ?
-
16.15. Jamb details lapped on top of bottom corners ?
-
16.16. Header detail/corner lapped onto jamb details ?
-
16.17. Perm-A-barrier secured onto window flashing ?
-
16.18. Any folds firmly adhered/NO fish mouthing ?
-
16.19. Window shims installed ?
-
16.20. Nail flange caulked ?
-
16.21. Window plumb, level, square ?
-
16.22. Correct screw spacing ( 16" O.C. ) or per plans and spec's ? Or per manufactures recommendations ?
-
16.23. Positive lapping at every detail ?
-
16.24. Interior caulking of sill complete ?
-
16.25. Correct handing of window ?
-
16.26. Does the window open without binding ?
-
16.27. Has draft stop been installed at perimeter of window ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Superintendent:
-
Subcontractor:
Exterior enclosure/envelope checklist
17. EXTERIOR ENCLOSURE/ENVELOPE checklist: * window wrap/flashing * building wrap * exterior insulation/spray foam * flashing at material changes
-
Are you doing QC on EXTERIOR ENCLOSURE/ENVELOPE ?
-
17.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
17.2. Do you have a signed contract for the contractor doing the work ?
-
17.3. Do you have the contractors safety plan ?
-
17.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
17.5. Have you conducted a pre-con with your independent inspector ?
-
17.6. Will the contractor be using scaffolding or high reach equipment ? If so do you have documentation showing competent person and employee training ?
-
17.7. Do you have all materials on site per plans, spec's, submittals, shop drawings ?
-
17.8. Are all materials stored in a safe manner and off the ground/mud ?
-
17.9. Are all trades complete with roof/wall penetrations and inspected by City Official, 3rd party inspector, State inspector ?
-
17.10. Is the exterior sheeting complete and signed off by City Official or 3rd party inspector ?
-
17.11. Do you have all exterior blocking complete ? ( Windows, parapet wall, parapet cap, awnings, doors, etc )
-
17.12. Do you have all blocking/backing installed for any architectural design items ?
-
17.13. Do you have exterior building wrap installed correctly, laps, tapped, inside corners, outside corners, windows , doors ? Fasteners per spec and manufactures requirements ?
-
17.14. Do you have exterior wrap inspected by City Official or 3rd party inspector ?
-
17.15. Do you have exterior applied spray foam insulation ?
-
17.16. Exterior cladding ( brick/stone ) do you have ties installed prior to spray foam insulation ?
-
17.17. Exterior cladding ( metal panels ) do you have furring channels installed prior to spray foam insulation ? Verify spacing and orientation ?
-
17.18. Did you have inspection on brick ties/furring channels by City Official or 3rd party inspector ?
-
17.19. Do you have exterior spray foam insulation complete and inspected by City Official or 3rd party inspector ?
-
17.20. What is the time frame for spray foam insulation ( between cover up and degrading )<br>WARRANTY
-
17.21. Exterior cladding EFIS, do you have a plan for controlling the ridged foam ( snow from sanding/small cut offs from blowing ) Environmental SWMP ?
-
17.22. Exterior cladding plaster, do you have a plan in place for curing to avoid cracks/shrinkage ?
-
17.23. Are the correct flashing be used for ( EIFS, Plaster ) ( Windows, doors, expansion joints, wainscoting at brick, stone, metal panels ) ?
-
17.24. Is your SWMP plan up to date and does it show the area for EFIS/Plaster clean out ?
-
17.25. Prior to spray foam verify all flashings are properly installed ( sloped away from the building and have end dams ) ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Superintendent:
-
Subcontractor:
Exterior claddings checklist
18. EXTERIOR CLADDINGS checklist: * metal wall panels * composite panel with rain screen * masonry veneer
-
Are you doing QC on EXTERIOR CLADDINGS ?
-
18.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
18.2. Do you have a signed contract for the contractor doing the work ?
-
18.3. Do you have the contractors safety plan ?
-
18.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
18.5. Will the contractor be using scaffolding or high reach equipment ? If so do you have documentation showing competent person and employee training ?
-
18.6. Do you have all materials on site per plans, spec's, submittals, shop drawings ?
-
18.7. Are all materials stored in a safe manner and off the ground/mud ?
-
18.8. Do you have documentation showing all inspections have been signed off ?
-
18.9. Is your SWMP up to date and show masonry mix area and washout ?
-
18.10. Have you built a mockup and has it been approved ?
-
18.11. Do you have all correct flashings for masonry veneer ?
-
18.12. Do you have wet or dry joint system ?
- wet joint
- dry joint
-
18.13. Exterior cladding ( Cementitious board ) are the correct flashings in place ?
-
18.14. Exterior cladding ( Cementitious board ) are dust masks/respiratory protection being used ? If so does the contractor have a respiratory program and documentation showing training ?
-
18.15. Exterior cladding ( metal panels ) are the correct flashings in place ?
-
18.16. Exterior cladding ( metal panels ) do you have a protection plan in place, at tie in points to other materials ? ( sheet roofing, window frames, glass, etc ) ?
-
18.17. Exterior cladding ( plaster ) are all flashings, trim and wire being installed correctly ?
-
18.18. Exterior cladding ( plaster ) i.e. The contractor following the plaster curing plan ? ( to prevent cracking, shrinking )
-
18.19. Exterior cladding ( composite panel w/rain screen ) have you checked the building for plumb, level, square ?
-
18.20. Composite panel w/rain screen, is the building envelope/weather resistant barrier complete and been water tested ?
-
18.21. CPWRS=composite panel w rain screen, do you have the correct flashings being used ? ( Windows, doors, scuppers, electrical boxes, etc ) ?
-
18.22. CPWRS, do you have the correct furring installed and per manufactures instructions ?
-
18.23. CPWRS, do you have all materials on site per plans, spec's, submittals, shop drawings ?
-
18.24. CPWRS, do you have the materials stored in a safe manner and off the ground/mud ?
-
18.25. Is the CPWRS contractor paying attention to panel direction in order to maintain color and finish consistency across panels ?
-
18.26. Contractor is cutting all materials from the back side to avoid scratch in the panel ?
-
18.27. Has the contractor set control lines to assure plumb, level ?
-
18.28. Have you verified panel clips are in line with building studs ?
-
18.29. Contractor is removing plastic protective film after the panel is installed ? ( don't leave protective film on panel as it may cause color variation ) ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Superintendent:
-
Subcontractor:
Moisture sensitive flooring checklist
19. MOISTURE SENSITIVE FLOORING checklist:
-
Are you doing QC on MOISTURE SENSITIVE FLOORING ?
-
19.1. Do you have approved plans, spec's, submittals, shop drawings ?
-
19.2. Do you have a signed contract for the contractor doing the work ?
-
19.3. Do you have the contractors safety plan ?
-
19.4. Have you done a prep meeting with the contractor on plans, spec's, submittals, shop drawings, safety, site lay down area and house keeping ?
-
19.5. Have you done a pre-pour meeting ? ( owner, construction manager, superintendent, testing lab, concrete contractor, concrete supplier, flooring contractor, flooring representative, adhesive manufacture ) ?
-
19.6. Have you tested the SOG for moisture, pH ?
-
19.7. Do you have all materials on site per plans, spec's, submittals ? Are the floor prep materials approved by the flooring manufacture ?
-
19.8. Do you have SDS sheets on site and accessible ? ( glues, cleaners, floor prep materials ) ?
-
19.9. Are all materials stored in a safe and clean manner ?
-
19.10. Have you check all floors to be sure they are clean and swept ?
-
19.11. Have you check that all floors are flat and humps have ground flat ?
-
19.12. Do you have a floor protection plan and material available ?
-
19.13. Are you using a scrabbler to knock down high spots or curled joints ? If so do you have a ventilation plan ?
-
ADDITIONAL COMMENTS:
-
Photo's of QC issues:
-
Date of QC Prep meeting/Inspection:
-
Superintendent:
-
Subcontractor: