Title Page
-
Conducted on
-
Prepared by
-
Location
-
Retrofit Installation Checklist
-
Please look at the "NO" answers for clarity of what your are looking for when answering the questions.
Installation
-
Equipment is clean
-
Exterior is dirty
-
Top plates are dirty
-
Bottom Plates are dirty
-
Timer bars are ready to be retrofitted
-
Timer bars are not working
-
Timer bars are not programmable
-
Temperature boards are ready to be retrofitted
-
Temperature boards are not functional
-
Temperature boards are not programmable
-
Retrofit Racks are correctly installed
-
Restaurant has the long stem probe and can demonstrate how to use it
-
The restaurant does not have a thermometer probe
-
The restaurant PIC or team member cannot demonstrate how to use it
-
All temperatures are set correctly
-
UHC/PHC at Fryer - Top set at 270 degrees +/- 10 degrees - (enter temperatures below)
-
#1
-
#2
-
#3
-
#4
-
UHC/PHC at Fryer - Bottom set at 185 degrees +/- 10 degrees (enter temperatures below)
-
#1
-
#2
-
#3
-
#4
-
UHC/PHC at Grill - Top set at 270 degrees +/- 10 degrees (enter temperatures below)
-
#1
-
#2
-
#3
-
#4
-
UHC/PHC at Grill - Bottom set at 185 degrees +/- 10 degrees (enter temperatures below)
-
#1
-
#2
-
#3
-
#4
-
Metal covers are set up correctly and the proper pans are used
-
Fry products have metal covers?
-
Fry products are not in shallow pans with proper racks/screens/or baskets
-
Grill products do not have metal covers?
-
Grill products are not in 2.5" deep pans
-
Job aids are posted
-
The fryer cook/stage times job-aid is not posted
-
The flat Grill cook/stage times job-aid is not posted
-
The clamshell Grill cook/stage times job-aid is not posted
Programming
-
All product names, times, and dayparts are programed correctly in the fryer UHC
-
Product names are not programmed correctly
-
Holding times are not programmed correctly
-
Dayparts are not programmed correctly
-
All product names, times, and dayparts are programmed correctly in the grill UHC/PHC.
-
Product names are not programmed correctly
-
Holding times are not programmed correctly
-
Dayparts are not programmed correctly
-
Built-to charts are updated in BOH
Jenius Training
-
Restaurant back of house employees and team leaders have completed the Build-to course in Jenius
-
All Team Leaders have not been trained
-
All Grill employees have not been trained
-
All Fryer employees have not been trained
-
All Assembly employees have not been trained
Employee Knowledge and Behaviors Observation
-
PIC has a 2nd copy of current built-to charts in the front to easily communicate and provide real time updates (recommended)
-
PIC is communicating with the BOH team on any adjustments needed to the build-to charts
-
Pre-cooking/staging/build-to is in place and used correctly including posting, adjusting, using build-to charts, and discarding expired product
-
Build-to charts do not reflect the retrofit changes have been adjusted in the BOH
-
Build-to charts are not posted, don't show correct day or daypart for current time of day
-
Build-to charts not adequately adjusted by PIC (if applicable)
-
Team members are not following the build-to amounts and products don't reasonably match the holding cabinets
-
Product is not discarded once expired
-
PIC - Can correctly explain and execute pre-cooking, staging, and "stop and drop"
-
PIC cannot explain cooking to hold
-
PIC cannot explain cooking to replace
-
PIC does know their "zeros" and cannot explain "stop and drop"
-
PIC is not communicating to the BOH team "stop and drop"
-
PIC does know how to change the daypart in the time bar
-
Grill TM - Can correctly explain and execute pre-cooking, staging, and "stop and drop"
-
Grill TM doesn't know how to explain how use to the build-to chart, when and how much product to drop
-
Grill TM cannot explain cooking to hold
-
Grill TM cannot explain cooking to replace
-
Grill TM does not use "Stop and Drop" for "0" quantity items on build-to chart and not dropped within 30 seconds
-
Grill TM does not know how to change the daypart in the time bar
-
Fryer TM - Can correctly explain and execute pre-cooking, staging, and "stop and drop"
-
Fryer TM doesn't know how to explain how to use the build-to chart, when and how much product to drop
-
Fryer TM cannot explain cooking to hold
-
Fryer TM cannot explain cooking to replace
-
Fryer TM does not use "Stop and Drop" for "0" quantity items on build-to chart and not dropped within 30 seconds
-
Fryer TM does not know how to change the daypart in the time bar
-
Assembly TM - Can correctly explain and execute pre-cooking, staging, and "stop and drop"
-
Assembly TM knows how to explain how to use the build-to chart, when and how much product to drop
-
Assembly TM cannot explain cooking to hold
-
Assembly TM cannot explain cooking to replace
-
Assembly does not use "Stop and Drop" for "0" quantity items on build-to chart and not dropped within 30 seconds
-
Guest Service person knows the zeros and calls out "stop and drop"
Sign Off
-
Name and Signature