Information
-
Date - Initials - Job Number(s)
-
Job Name
General Project Information
-
Safety Manager Assigned to this project:
-
Site hours of operation:
-
List Sub-Contractors and Competent Persons per sub:
-
Prepared by
-
Weather Conditions
-
Conducted on
-
Location
1. Planned / Scheduled work for the day.
-
1a. Pre-Task / Safety Briefing prior to start of work?
-
1b. Work performed according to plan?
-
Brief description of work to be performed.
-
1c. Adequate tools, materials and Safety controls to perform work?
-
1d. Rail road flagman on site and safety briefing given?
-
Were risk assessment findings communicated during the job safety briefing?
-
Were track authority/protection parameters communicated during the briefing?
-
Are job briefings updated as personnel/conditions change?
-
Are safety zones around equipment established and communicated?
-
Has a right of way Fire Risk Prevention/Risk Assessment For been completed?
2. Ladders / Scaffold
-
Are ladders present in use on site?
-
2a. Unsafe or damaged ladders destroyed, discarded, and removed from site?
-
2b. Ladders properly positioned?
-
2c. Ladders properly secured?
-
Is scaffold present on site?
-
2d. Was scaffolding erected according to plan, and by qualified person?
-
2e. Is inspection tag present and completed by competent person?
-
List responsible party for scaffold, type of scaffold, inspection frequency and competent person:
3. Emergency Response
-
3a. Adequate emergency plans for site?
-
3b. Emergency procedures displayed at site?
-
3c. Adequate first aid kits and equipment for site?
-
3d. Are the Hazcom program and SDS sheets present, available, and up to date?
4. Personal Protective Equipment (PPE)
-
4a. Adequate PPE supplied / utilized?<br>
-
4b. Appropriate training in safe use, clean-up and inspection of PPE?
5. Fall / Perimeter Protection
-
5a. Guard rails at required height?
-
5b. Holes greater than 2" covered, secured, and clearly marked?
-
5c. Fall arrest plan, equipment, & personnel properly trained?
-
5d. Are all fall exposures from any height protected?
6. Lifting Equipment
-
6a. Hoisting Equipment adequate for task at hand? (Right machine for the task?)
-
6b. All workers, and operators aware of hoisting loads over head and near power lines, practices and procedures according to company policy and OSHA Standards?
-
6c. Unsafe or damaged lifting equipment, including ropes, slings, chains, hooks removed from service?
7. Work Environment
-
7a. Sufficient lighting?
-
7b. Adequate housekeeping?
-
7c. Adequate access/egress provided to the site and all work areas?
8. Fire Prevention
-
8a. Are flammable liquids being properly stored?
-
8b. Are there an adequate number of fire extinguishers present and in working order?
-
8c. Are flammable liquids are stored in safety cans with the wire mesh flame arrestor intact?
-
8d. Are compressed gas cylinders located or stored in a secure and upright position?
-
8e. Are oxygen cylinders stored a minimum of 20 feet from other combustible/flammable liquids or gases?
9. Incidents, Accident, Injury, Near Miss
-
9a. Were there any incidents, injuries, accidents or near miss' to report today?
-
9b. Detailed information narrative?
-
9c. Detailed Information Photo's
10. Electrical Hazards
-
10a. GFCI outlets inspected regularly?
-
10b. Electrical equipment placed away from water?
-
10c. Extension cords inspected prior to use?
-
10d. Electrical equipment at safe distance from flammables?
-
10e. Are all power tools inspected prior to use?
11. Lock Out/Tag Out: Hazardous Energy, Equipment or Other.
-
11a. Lock-out/tag-out (LOTO) procedures for electrical or other hazardous equipment?
12. Excavations
-
12a. Will excavation work be performed today?
-
12b. Has an excavator Corporate Safety Program been submitted to Superintendent?
-
12c. Is there a competent person for excavating on site?
-
12d. Is there an excavation plan, with associated "DIG" numbers reviewed and approved?
-
12e. Are Safety restraint belts in place and being used?
-
12f. Are 'BACK-UP'or other movement alarms in place and functioning properly?
-
12g. Is traffic control required, and in place according to 'traffic control plan'?
-
12h. Are Flaggers required?
-
Are the Flaggers certified according to City, State, & OSHA standards?
-
Are the Flaggers trained for the task at hand, and familiar with surrounding activities?
-
12i. Have open excavations been protected?
-
12j. Is shoring designed by a Structural Engineer?
-
12k. Is contaminated material being handled according to plan and disposed of properly in accordance to EPA expectations?
-
12L. Is erosion control in place? I.e: silt fence, drain screens, pump sock - filter bag, etc...
-
12m. Has all earth work been inspected by the competent person prior to entering?
-
12n. Are precautionary measures in place for dewatering trenches / excavations?
-
12o. Have proper permits been acquired prior to digging?
-
12p. Has the soil been tested to determine classification by the competent person?
-
12q. Is benching, sloping, shoring, or shielding required?
-
12r. Is any special insurance required, if so, has it been obtained? (RR Prospective, etc..)
-
12s. Are dust control and street sweeping equipment being used? ie... Water truck - Street sweeper
-
12t. Are there any atmospheric hazards?
-
12u. Are access & egress points in place according to standards?
13. Administrative Procedures
-
13a. Procedure for incident reporting followed? (Incident, witness, injury, etc.)
-
13b. Has proper orientation been provided to workers, contractors, visitors?
-
All personnel have completed the BNSF Contractor Safety Orientation Program?
-
All personnel have an e-RAILSAFE ID?
-
13c. Proper permits acquired prior to task? (Hot Works, Confined Space etc)
-
13d. Site Safety Plan readily available?
-
Is a completed copy of the BNSF Engineering Contractor Safety Action Plan form available on site?
-
13e. Supervision on site? (List Supt., PM, BNSF Rep, and Flagmen)
-
13f. Appropriate consultative arrangements? (Ability to get resolution to concerns)
-
13g. Routine inspections, monitoring, audits submitted regularly?
14. Tower & Mobile Cranes
-
14a. Is there a crane on site today?
-
14b. Are crane inspections current and copies available?
-
14c. Is the load chart readily available, legible, and being followed?
-
14d. Are signal persons and riggers qualified with proof readily available?
-
14e. Are all hook 'Safety Locks' in working order?
-
14f. Is crane positioned at the correct safe distance from over-head power lines?
-
14g. Are outriggers properly padded?
-
14h. Are access ladders and steps properly protected and in good condition?
-
14i. Does the operator have appropriate licensing accord to Job, City, & State requirements?
-
14j. Is all rigging properly tagged and regularly inspected?
15. Site exterior condition.
-
15a. Are site access points clear and maintained?
-
15b. Is the public roadway at site access points clear of dirt and debris which could cause a roadway hazard?
-
15c. Are erosion and sediment control measures in place, adequate, and in accordance with SWPPP?
16. Site Security
-
16a. Is the site fenced to prevent un-authorized entrance?
-
16b. Are equipment and job trucks locked at the end of shift to prevent un-authorized use?
-
16c. Are materials and equipment stored in a secure area to prevent theft?
-
16d. List any site security measures that are currently in place for the site, i.e. security cameras or night time security personnel.
17. Atmospheric: Lead, Asbestos, Silica
-
17a. Have potential atmospheric hazards been Identified? (If yes, please describe)<br>
-
17b.Has formal testing been performed prior to beginning of task to identify hazard and exposure levels?
-
17c. Has the hazard been remediated / abated, if yes, by whom? (please provide copies of completion reports)
-
17d. Are employee's provided with appropriate PPE to be protected from exposure to hazard?
18. General Duty Clause, Miscellaneous Findings & Other Safety Observations
-
18a. Were observations or miscellaneous findings that pose a potential hazard discovered during audit process?
-
18b. Were there deficiencies that aren't listed discovered during audit process?
-
Brief description & photo:
19. Corrective Actions
-
19a. Enter any corrective actions that will be undertaken
-
Add media
20. On-Track Safety
-
Will work be performed within 25 feet of the track?
-
20a. Do all personnel know the authority limits?
-
20b. Do all personnel know who the employee-in-charge is? Flagman, look-out, etc.
-
20c. Do all personnel know what the method of warning is?
-
20d. Do all personnel where the designated place-of-safety is?
-
20e. In adjacent track situations, are activities conducted on the field side of the track, where practical?
-
20f. Is a copy of the MW Operating Rules with the BNSF rule qualified employee-in-charge when personnel and/ or equipment foul the tracks?
-
20g. Do all personnel on the project know the on-track safety strategy?
-
20h. Are all personnel aware of the 25 foot from tack centerline safety zone?
Sign Off
-
Auditor's signature