Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
Has scaffold been inspected by Competent Person Today?
-
is scaffold at least 10' away from energized power lines?
-
Daily JSA forms for each available for review?
Construction
-
Mudsill, base plate, and Screwjack in place?
-
Guardrails, Midrails and Toeboards installed?
-
Are working levels fully decked from to back?
-
Is there less than 1 inch gap between boards?
-
Do boards overlap at least 6 to 12 inches?
-
Are tiebacks installed perpendicular to the face of the building?
-
Are tiebacks secured to a structurally sound anchorage?
-
Do support devices rest on surfaces capable of supporting 4 x the weight?
-
Are access platforms at least 18 inches wide?
-
Do scaffold components match?
-
Add photograph of scaffold here:
-
Add diagram of scaffold here:
Access / Fall Protection
-
Is ladder access provided for employees on all working levels?
-
Are guardrails installed at 42 inches?
-
Are mid rails or X-brace installed at 21 inches?
-
Are open ends at each working level blocked off or have pass gate?
-
Are toe boards or screens installed?
-
Add photograph of scaffold here:
Baker / Perry
-
Rolling scaffold wheels locked when employee using?
-
Have handrails been installed if platform over 6 feet?
-
If double stacked have outriggers been attached?
-
Add photograph of scaffold here:
Review
-
Superintendent signature
-
Safety Director signature