Title Page
-
Task/ Cargo/ Equipment
-
Conducted on
-
Location
JHSC Personel
-
Union:
-
Western:
-
Guests or Third party reps:
Pre-Analysis
-
This JHA is intended to be used in the development of:
-
The Risk Assessment portion of this analysis does NOT replace the risk assessment process agreed to by the JHSC.
-
The Risk Assessment portion of this analysis is only good for a temporary procedure does NOT replace the risk assessment process agreed to by the JHSC.
-
This is JHA is:
-
Previous JHA:
-
Do any of the following S.O.P's apply to this operation?
- Hatch Accsess
- Hatch Clean Up
- Ship Crane Inspection
- Lashing/Unlasing
- Fall Protection
Job Hazard Analysis
-
Add Step:
-
Identify Step:
-
Describe the work area, task being performed, or equipment being used, that create the hazards.
-
Hazard(s):
-
Hazard Type:
- Slips/Trips/Falls
- Fall From Hight
- Pinch Points
- Strains/Sprains
- Cuts/Bruises
- Struck by
- Crush
-
Pre-control Risk:
-
Current Control(s):
-
Post-control Risk:
-
Preposed new control:
-
Post-control Risk:
-
Notes:
-
Pictures:
Post-Analysis
-
Additional Recommendations:
-
Additional Notes:
-
Add media