JOB PLAN
-
Planner walk down checklist. Please refer to the Ivara work order for additional details.
-
Time and date of Job site visit.
-
Planner: Dan Courtemanche x.206 ch.1
Info
-
Work Order / Work Request
-
Work Order #
-
Work Request #
-
Asset number on work request verified against asset in field?
-
Asset #
-
Equipment model(s) in CMMS verified against model in field?
-
Enter equipment model(s)
Equipment Model
Location
-
Area
- Batch Digester (#2)
- Brown Stock Washing
- Chemical Unloading
- Continuous Digester (1A)
- Hardwood Bleach (#2)
- Maintenance Shop
- Mill Stores
- O2 Bleach
- Power House
- R10 Generator
- Screen Room
- Softwood Bleach (#1)
- Tall Oil
- Thickener / Cleaners
- Other
-
Floor
- Ground
- 1-1/2
- 2
- 2-1/2
- 3
- 4
- 5
- 5-1/2
- 6
- 7
- 7-1/2
- 7-3/4
- 8
- Mezzanine
- Operating
- Pier
- Washer
- Filter
- Roof
- Top
- Bottom
- Basement
- Other
-
Control Room for Lock Out
- Batch Digester (#2)
- Brown Stock Washing
- Chemical Unloading
- Continuous Digester (1A)
- Hardwood Bleach (#2)
- Maintenance Shop
- Mill Stores
- O2 Bleach
- Power House
- R10 Generator
- Screen Room
- Softwood Bleach (#1)
- Tall Oil
- Thickener / Cleaners
- Other
-
Map
- Not on maps
- PP-100
- PP-101
- PP-102
- PP-103
- PP-104
- PP-105
- PP-106
- PP-106 back
- PP-107
- PP-108
- PP-109
- PP-110
- PP-111
- PP-112
- PP-113
- PP-114
- PP-115
- PP-116
- PP-117
- PP-117B
- PP-118
- PP-119
- PP-150A
- PP-150B
- PP-151
- PP-152
- PP-153
- PP-154
- PP-155A
- PP-155B
- PP-156
- PP-157A
- PP-157B
- PP-157C
- PP-158
- PP-159
- PP-160
- PP-161
- PP-162
- PM-622
- PM-623A
- PM-623B
Details
-
Problem Description
-
Photos
-
Sketch
-
Job Scope
-
Enter task description(s)
Task
-
If job scope changes, check with operator to see if lock out requirements have changed.
-
Prep work required?
-
Enter prep task description(s) and duration(s)
Prep Task
-
Follow-up work required?
-
- PMG acceptance test
- Equipment rebuild
- Ship equipment for rebuild
- Other
-
Enter follow-up tasks.
Task
-
Problems to resolve?
-
Enter problem details
Problem
-
Work acceptance criteria
- 4 smiley faces
- Acceptable drip rate
- No process leaks
- No oil leaks
- Acceptable VA baseline
- Inspection by supervisor
- Inspection by NDT Tech
- Inspection by engineer
- Proper belt tension
- Other
-
Additional acceptance criteria.
Acceptance criteria
-
Rigging required?
-
A competent craftspersons must develop a sound rigging plan to be reviewed with his supervisor prior to starting the job.
-
Rigging options
- Rated lifting beam
- non-rated lifting bean
- Non-rated rigging point
- Limited rigging options
- Accessible with mobile equipment
- No access with mobile equipment
- Complex rigging required
- Drift required
- Other
-
Other rigging options.
Rigging option
-
Running condition
-
S/D?
- Any Area
- Batch Digester Annual
- Hardwood Area
- Mill Wide Annual
- Softwood Area
- Water Wash
- Other
-
Advanced details
-
Around-the-clock?
-
Complexity level
-
Exhaustion level
-
Contingency
-
Notes
-
Support documents required?
- Engineering Drawings
- Manuals
- MSDS
- Other
-
Other support documents required.
Document
Permits & Procedures
-
LOTO required?
-
No exposure to energy sources
-
Line / Process break?
-
Attach line breaking procedures to Ivara work order.
-
Hot work required?
-
Attach hot work permit to work order package.
-
Confined space entry?
-
Operations is responsible for developing a CSE plan, arranging for breathing air, attendants, gas testing and continuous monitoring.
-
Gas test required?
-
Reason for gas test
- Enclosed space
- Oxygen area
- Ozone area
- LEL / PID area
- Turpentine area
- Other
-
Supervisor must arrange to have a gas test done.
-
Lifting over 25 tons?
-
Attach lifting permit to work order for all lifts over 25 tons.
-
TSSA?
-
Attach ITP (Inspect and Test Plan) to work order package. Please initial and date all applicable sections of the ITP.
-
Working on top of tank?
-
Attach completed permit for working on top of tanks to the work order package.
-
Work to be performed by a contractor?
-
Submit contracting out notification to Local:
- 74
- 74-1
- 156
- 956
-
All services above $25,000 require competitive bidding or an exception form.
-
Working from heights?
-
Attach working from heights procedure to work order.
-
Is fall arrest required?
-
Inspect all components and tie-off point(s).
Resources
-
Skills required?
- Carpenter
- Electrician
- Fiberglasser
- Instrument Tech
- Lube Tech
- Millwright
- Pipefitter
- Rigger
- Vibration Analyst
- Welder
- Contractor
- Waterblaster
- Other
-
Other skills required.
Skill
-
Bill of Materials
-
Add item to BOM
Item
-
Special tools required?
-
- Optalign
- Laser sheave alignment tool
- Belt tensioner
- Packing puller
- Other
-
Additional specialty tools required.
Tool
-
PPE required?
-
- Rubber suit
- Rubber gloves
- Rubber boots
- Googles
- Face shield
- SCBA
- Half mask respirator
- Full face respirator
- Chemical suit
- Other
-
Additional PPE required.
Item
-
Rigging required?
-
-
Additional rigging items required.
Item
-
Scaffold required?
-
-
Scaffolding details.
Details
-
Mobile equipment required?
-
- Fork lift
- Forklift with boom
- P&H (crane)
- Boom truck
- Handy Herman
- Scissor lift
- Broderson
- Other
-
Other mobile equipment required.
Equipment
-
External services required?
-
- Boom Truck / Crane
- Confined Space Attendant
- HP Cleaning / Vacuum Truck
- Waterblasting
- NDE
- Fitter / Welder
- Millwright
- Other
-
Other external services required.
Service
EMERGENCY: Contact Security by Phone ext.316 or Radio ch.1
-
Advanced emergency info
-
Nearest eyewash / shower
-
Nearest phone
- 271 - R10 control room
- 272 - Beater Room control room
- 280 - Pipe Shop
- 283 - Chemical Unloading control room
- 301 - Power House stairwell
- 302 - Tall Oil control room
- 314/436 - Digester control room
- 324/337 - Bleach Plant control room
- 801 - Millwright Shop
- Other
-
Nearest emergency door
- 1 - Electrical shop
- 9A - Alley by Chemical Unloader
- 10 - Bleach high density storages
- 11 - O2 Bleach at ramp
- 19 - 1A Digester big door
- 20 - Salt Dock
- Other
JSA / JHA
-
Perform Job Safety / Hazard Analysis?
-
A Job Safety / Hazard Analysis has not been performed.
-
Line of fire
-
Add media
-
Slips / Trips
-
Fall to lower level
-
Struck by / Struck against
-
Caught / Crushed
-
Cut / Puncture / Abrasion
-
Pressurized system / Compressed gas
-
Hot / Cold environment
-
Thermal Contact
-
Chemical Contact
-
PSM Chemicals
- Chlorine
- Chlorine Dioxide
- Methanol
- Sodium Chlorate
- Turpentine
-
Non-PSM Chemicals
- Black Liquor
- Caustic
- Hydrogen Peroxide
- White Liquor
- Sulphuric Acid
- Other
-
Gas Area
-
Possible exposure to
- Chlorine Dioxide
- Hydrogen Sulphide
- Oxygen
- Ozone
- Other
-
May be required to carry an H2S monitor. Check with the operator.
-
Other gas?
-
Carry approved respirator at all times.
-
Designated Substances?
-
Possible exposure to
- Acrylonitrile
- Arsenic
- Asbestos
- Benzene
- Coke Oven Emmisions
- Ethylene Oxide
- Isocyanates
- Lead
- Mercury
- Silica
- Vinyl Chloride
-
Radiation
-
Electrical
-
Vibration
-
Noise
-
Over 85 dB - Hearing protection required.
-
Confined Space Entry
-
Check that all requirements on the CSE have been met.
-
Entanglement
-
Obstruction
-
Fire / Explosion
-
Dust / Fumes / Vapour
-
Approved respirator and cartridges must be work during exposure.
-
Ergonomics
-
Visibility / Lighting
-
Addition lighting may be required.
-
Access / Egress
-
Working on Roof
-
Requires use of buddy system.
Must not be closer than 6 feet from edge unless a physical barricade is erected. -
Traffic
-
Traffic hazard
- Adjacent to mobile equipment route
- Adjacent to road
- Adjacent to train tracks
- Watch for people and equipment while operation mobile equipment
- Other
-
Working Alone
-
Use buddy system or maintain periodic radio contact.
-
Drop tool to lower level
-
Drop hazard
- Working from scaffold or platform
- Working on grating
- Working adjacent to handrail
- Working from man-lift
- Working near roof edge
- Working adjacent to opening in floor
- Working adjacent to opening in wall
- Working below / Drop from above
- Drop into equipment
- Other
-
Biohazardous Material
-
Insect Bite
-
Weather
-
Environmental damage
-
- Draining contents of tank to sewer
- Equipment outside of contained area
- Venting of emissions to atmosphere
- Other
General Instructions
-
Perform 10 foot safety circle.
-
Complete job safety check sheet.
-
Ensure controls are in place for all identified hazards.
-
Keep work area tidy for the entire duration of the job.
-
Dispose of all garbage properly.
-
Place all recyclables in proper bins.
-
Put away all tools and rigging.
-
Return all unused parts to mill stores return bin.
-
Leave the job site cleaner than you found it.
-
Report activity as "Complete" in Ivara and leave feedback.