Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PRE-TASK PLANNING and BBS
-
Pre-task plan completed and discussed with all crew members
-
Pre-task plan updated if scope of work changes
-
Site specific safety plan reviewed
-
JHAs reviewed and signed
-
BBS Card/s assigned
PERSONAL PROTECTIVE EQUIPMENT (BPM ALL)
-
Hardhats worn at all times (SM 9.4)<br>
-
Proper hand/arm protection
-
Hearing protection used when required (SM 9.12)
-
Face shields when there is potential for flying objects or working overhead (SM 9.5)
-
Safety Glasses with Side-shields (SM 9.5)
-
Full Body Harness w/ Lanyard or Retractable where needed (SM 9.10)
HOT WORK (BPM 5, 7, 10 & 28)
-
Hot Work permit filled out, signed and posted
-
Fire Protection (extinguishers / fire blankets) (SM 12.2)
-
Fire extinguishers inspected and tagged (SM 12.3)
-
Welding shields in use
-
Cylinders secured and capped when not in use
-
Leads and Hoses in good condition (SM 12.6)
WALKING / WORKING SURFACES (BPM 3 & 31)
-
All floor openings and holes greater than 2" covered (SM 9.11.2)
-
Aisle ways are clear of tripping hazards such as ext. cords, welding leads and stored material
-
All leading edges with falls greater than 6' protected (SM 9.11)
-
Weld rods / all-thread stubs are placed in buckets or trash containers (SM 12.5)
-
Work area properly illuminated (SM 18.5)
-
Roof top work has proper fall protection system (SM 9.11)
MATERIAL LIFTING / HANDLING (BPM 12, 14, 26 & 30)
-
Employees are using proper lifting techniques
-
Slings and chokers in good condition
-
Shackles are used on multi-leg picks
-
Cranes, chain falls, come-alongs and air tuggers are properly sized and used correctly
SCAFFOLDS AND MAN-LIFTS (BPM 2, 20 & 11)
-
Handrails and toe-boards in place (SM 16.3)
-
Scaffolds have proper access and are tagged, dated and inspected by a competent person (SM 16.2, 16.4, 16.6)
-
Fall protection used in boom-lifts (SM 9.10)
-
Fall protection requirements for scissor lifts are being met (SM 9.10)
EXCAVATIONS (BPM 24)
-
5 feet or more in depth - shored, sloped or benched (SM 7.14)
-
Spoils are a minimum of 2' from edge of the excavation (SM 7.9)
-
Excavations are inspected daily for any changes in working conditions (SM 7.10)
-
Entry permits are filled out and posted for excavations greater than 5 feet (SM 7.10)
-
Proper access / egress is provided (SM 7.4)
LADDERS (BPM 1)
-
All ladders are free of defects (SM 10.3)
-
Stepladders used only in the open and locked position ( SM 10.4)
-
Straight ladders are being used at proper angle (SM 10.4)
-
Straight ladders are equipped with safety feet and are secured to avoid displacement (SM 10.4)
-
Access to ladders free of debris and/or obstructions (SM 10.4)
POWER TOOLS (BPM 3, 4, 6, 8, 9, 23, 27, 34, 35 & 36)
-
Power cords in good condition (SM 18.3)
-
Guards and handles in place (SM 11.5)
-
Ground-fault interruption protection in place (SM 18.4)
Comments and Action Items
-
Comments
-
Action Items
SIGNATURES
-
SITE REPRESENTATIVE
-
AUDITOR