Title Page
-
Job Name:
-
Job Number:
-
Job Location:
-
Project Manager:
-
Superintendent Name:
-
Safety Representative:
-
Conducted on
-
Prepared by:
-
Techniques and Operations
- Drilled Shafts
- Auger Cast Piles
- Vibratory Hammer
- Drilled Shaft Entry/Confined Space Entry
- Wirth Drill
- Slurry Mixing/Use
- Barge Operations
- Secant Piles
Fall Protection:
-
Hazard(s)
-
Competent Person:
Drill Rig(s):
-
Hazard(s)
-
Daily Inspection
Heavy Equipment (Endloaders/Forklifts/Bobcats):
-
Hazard(s)
-
Qualified Operators
Rigging:
-
Hazard(s)
-
Nylon Slings (Remove if stitches are ripped, core shows, cuts, etc.)
Personal Protective Equipment (PPE):
-
Hazard(s)
Hand/Power Tools:
-
Hazard(s)
-
Superintendent's Signature:
-
Safety Representative's Signature