Title Page

  • Job Number

  • Location
  • Client Details

  • Conducted on

  • Prepared by

Type of work undertaken

  • Removal

  • Repair

  • Encapsulation

  • Environmental Clean

General site information

  • ASB5

  • NNLW

  • Non Licenced Work

  • F10

Site access and working arrangements

  • Project team details

  • Start date

  • Finish date

  • Duration of project

  • Working times?

  • Mon-Fri?

  • Weekend Working?

  • Shift working?

  • Shift pattern?

  • Continual works?

  • Out of hours working?

  • Number of operatives per shift?

  • Number of supervisors per shift?

  • Void property?

  • Access arrangements?

  • Occupied property?

  • Access control to asbestos removal working area?

Type of premises

  • School

  • Office

  • Factory

  • Retail

  • Residential

  • Other

  • Please state

Vehicle and skip access

  • Good

  • Poor

  • Other

  • Please state

  • Photo where van is located

  • Please state

  • Photo where waste van/skip is located

  • Please state

Hygiene Facility (DCU)

  • Direct connection?

  • If NO justification? (Eg flat)

  • Modular

  • Standard

  • Alley cat

  • Self contained

  • Photo where DCU is to be located

  • Photo were water is to be obtained

  • Please state

  • Photo were power is to be obtained

  • Please state

  • Photo were foul drain is located

  • Please state

Quantity of asbestos waste and disposal arrangements

  • Estimated amount of waste generated by works (bags, wraps, weight)

  • Is skip required?

  • Photo were skip is to be located

  • Location and size

  • RIS Sulo bin or dedicated waste compartment

  • Coharts

  • ATS

  • Bowmers

  • Pinden

Survey details (if any)

  • Analytical company name

  • Management

  • Refurbishment

  • Bulk samples

  • Other

Type of asbestos

  • Amosite

  • Chrysotile

  • Crocidolite

  • Other

  • state which type

Type of application

  • Pipe work

  • Soffit

  • Ceiling

  • Wall

  • Debris

  • Floor

  • Roof

  • Beams/cross sections

  • Internal/External

  • Photo(s) of asbestos location(s)

Type of ACM

  • Spray coating

  • Cement

  • Insulation

  • AIB

  • Floor Tiles

  • Textured coating

  • Debris (material type unknown)

  • Other

  • state which

Condition of asbestos

  • Good

  • Poor

  • Fair

  • Requires pre clean

  • Other

  • state which

Asbestos fixings

  • Nailed

  • Screwed

  • Bolted

  • Other (eg glued)

  • state which

Existing services (pipe work, plant)

  • In service

  • Off line

  • Redundant

  • N/A

  • Photo(s) of services (if any)

Emergency arrangements

  • Fire

  • First Aid

  • Client/ PC arrangements

  • Photo(s) of muster points

  • state where

Control measures to be taken

  • Fully controlled

  • Two stage

  • Respirator zone

  • Speed frame

  • Timber frame

  • state what size

  • Bag lock?

  • If NO justification?

  • CCTV

  • How many

  • VIsion panels?

  • How many?

Control measures to be taken

  • Fully controlled

  • Two stage

  • Respirator zone

  • Speed frame

  • Timber frame

  • state what size

  • Bag lock?

  • If NO justification?

  • CCTV

  • How many

  • VIsion panels?

  • How many?

Working techniques to be used

  • Injection machine (BS8520)

  • Spray bottle

  • Airless sprayer

  • Encapsulation

  • Internal/External

  • Wrap and cut

  • Shadow vac

  • Partial enclosure

  • Other (eg ALG Memo 03/12)

  • State which

Working at height requirements

  • None

  • Ladders

  • Steps

  • Podiums

  • Internal/External

  • Hop ups

  • Tower scaffolds

  • Fixed scaffolds

  • Does the scaffold need a licence or design?

  • Qty

  • Types

  • Mobile elevated working platform?

  • Type required

Analytical services

  • Sensible Asbestos Solutions

  • Ace Consultants

  • Environtec

  • Leftfield Environmental

  • REC

  • CARE

  • DMV

  • Shield Onsite Services

  • Anchem

  • PCS Asbestos Consultants

  • Bradley Environmental

  • 4 stage

  • Reassurance

  • Air test RIS van

  • Personal, background and leaks

  • Perimeter testing

Enclosure/respirator zone(s) details (location and sizes)

  • Enclosure/respirator zone 1

  • Photo of enclosure/respirator zone 1

  • Enclosure/respirator zone 2

  • Photo of enclosure/respirator zone 2

  • Enclosure/respirator zone 3

  • Photo of enclosure/respirator zone 3

  • Enclosure/respirator zone 4

  • Photo of enclosure/respirator zone 4

  • Enclosure/respirator zone 5

  • Photo of enclosure/respirator zone 5

  • Photo of enclosure/respirator zone 6

  • Enclosure/respirator zone 6

  • Enclosure/respirator zone 7

  • Photo of enclosure/respirator zone 7

  • Enclosure/respirator zone 8

  • Photo of enclosure/respirator zone 8

Fibre control equipment

  • 500 NPU

  • 1000 NPU

  • 1500 NPU

  • 2000 NPU

  • 4000 NPU

  • H type vac

  • Multi point injection

  • Is water available on site?

  • Photo of water location

  • If no how is to be sourced?

  • Is power available on site?

  • If no how is to be sourced?

  • 240 volt, 110 via transformer

  • 10kva hard wired

  • Photo of power supply

  • If no how is to be sourced?

Transit and waste route

  • Waste route to skip or waste van enc 1

  • Photo of route enc 1

  • Transit route to DCU

  • Photo of route

Transit and waste route

  • Waste route to skip or waste van enc 2

  • Photo of route enc 2

  • Transit route to DCU

  • Photo of route

Transit and waste route

  • Waste route to skip or waste van enc 3

  • Photo of route enc 3

  • Transit route to DCU

  • Photo of route

Transit and waste route

  • Waste route to skip or waste van enc 4

  • Photo of route enc 4

  • Transit route to DCU

  • Photo of route

Safety wear

  • Full face mask

  • Half face mask

  • Type 5/6 disposable overalls

  • Safety boots

  • Gloves

  • Hard hats

  • Ear protection

  • Googles

  • Hi vis vest

  • Fall arrest (harness and lanyard)

  • Other

  • State type

Non asbestos risk assessment

Access and egress

  • Any restricted access?

  • Confined spaces?

  • Working at height?

  • Work equipment?

  • Adequate lighting?

  • Fragile roofs?

  • Unstable work areas?

Work at height

  • Edge protection?

  • Hand rails?

  • Harnesses?

  • Fragile roof?l

  • Equipment?

Work environment

  • Adequate lighting?

  • Floors/walkways in good condition?

  • Any spill ages or even ground?

  • Are stairs in good condition?

  • Explosive atmosphere?

  • Hot/cold environment? (Plant room, boiler/chill store)

  • Hot/cold surfaces? (Radiators/pipe work)

  • Noise

  • Sharps? (Needles, broken glass etc)

Services

  • Are services are to be isolated?

  • Isolated by?

  • Are services are concealed?

  • Where?

  • Gas

  • Water

  • Steam

  • Electric

  • Other

  • State type

Debris

  • Existing debris

  • Sharps?

  • Guano?

  • Other

  • State type

Water

  • Is there area likely to be flooded?

  • Is the area near water?

Over hazards

  • Rats

  • Pigeons

  • Dermatitis

  • Mold

  • Hand Arm Vibration

  • Manual Handling

Fire

  • Sources of heat?

  • Sources of fuel (flammable materials, liquids)

  • Hot works?

COSHH

  • Hazardous chemicals present or to be used?

  • Special PPE/RPE required?

Welfare

  • Supplied by the client?

  • Supplied by JFH ?

Additional comments

  • Add drawing

  • Add drawing

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.