Title Page

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • - This work shall be considered binding upon signatures of customer and crew leader
    - If after you agree to this work, you desire any changes or additional work, they must be agreed upon in writing. Workers are instructed not to undertake additional work without authorization. Changes may require an additional cost.
    - Color should be chosen prior to signing. An additional cost will be charged for color changes made after commencement of the work.
    - Work to be included in the current scope of the job unless otherwise noted.

  • Description of work to be performed:

  • COST:
    We propose to furnish material and labor, complete and in accordance with the above specifications, or any of the above individual tasks at their respective prices as stated above.

    The total for the stated additional work is:

  • Warranty:

    All work is included in the warranty given by Jondec Painting located on your original proposal.

    Work to be completed in a substantial and workmanlike manner.
    Jondec Painting to provide all necessary equipment.

  • Crew Leader Signature

  • Customer Signature

  • Jondec Painting
    17243 Odell Avenue
    Tinley Park, IL 60477
    708-532-2340
    708-532-3126 (fax)
    jondecpainting@comcast.net
    www.jondec.com

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.