Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
General
-
Is the JSA properly filled out and relevant to today’s task(s)?
-
Is the JSA signed by all crew members?
-
What is the toolbox topic this week? Ask member of crew.
PPE
-
Hard hats worn by all personnel in work areas?
-
Eye and face protection worn as required?
-
Hearing protection worn as required?
-
Respiratory protection worn as required?
-
Proper boots worn as required?
-
Coveralls/Tyvek worn as required?
-
PPE in good condition and stored properly?
Housekeeping
-
Walkways and stairs kept clear of material and debris?
-
Cords and hoses strung to avoid trip/fall hazard?
-
Gang boxes clean and orderly?
-
Trash, scrap and debris picked up and disposed of?
Fire Protection
-
Proper class fire extinguishers in work area?
-
Fire extinguishers inspected and signed monthly?
-
Flammables stores and handled in approved containers?
Tools
-
Correct tool used for the job?
-
Tools in good and reliable condition?
-
Power tools unplugged if unattended?
Ladders
-
Straight ladders secured/tied off?
-
Straight ladders extend 3’ above landing?
-
Straight ladders have feet or blocked at bottom?
-
Straight ladders set with 4 to 1 slope?
-
Step ladders locked in place properly?
Scaffolds and Aerial Lifts
-
Scaffold planks kept clean?
-
Scaffolds have guardrails, mid rails and toe boards?
-
Wheels on rolling scaffolds locked during use?
-
Scaffold tags present and signed off by competent person?
-
Only trained employees using aerial lift?
-
Operator and passenger are tied off properly?
Working at Heights and Open Holes
-
Elevated work areas closed in by handrails or other hard barricade?
-
Rails are sturdy, continuous and have mid rails?
-
Floor holes are surrounded by hard barricade or covered with hole cover?
-
Hole covers secured down?
-
Hole covers properly marked?
Excavation and Trench
-
Excavations 5’ or deeper shored, sloped or boxed
-
Workers staying within protected area?
-
Spoil pile is kept at least 2’ back from lip of trench?
-
Barricades placed when trench not occupied?
-
Ladders placed every 25’ for worker entry and exit?
Communication
-
Do foreman/supervisors communicate with their crew when needed?
-
Do foreman/supervisors address safety concerns?