Title Page
-
Job Address
-
Inspection Date
-
Prepared by
Frame Inspection
Ground Floor
-
Have all walls been erected as per the plan and layout?
-
Are all walls plumb, straight and packed as per the laser level indicators?
-
Is all ply bracing installed as per the layout?
-
Have all strap braces been tensioned and screwed off at every frame point including noggins?
-
Are all K - Braces screwed off?
-
Have all screw bolts been installed at braces as per the layout? Double bolts in ply etc.
-
Have all steel posts been dyna bolted?
-
Have all bulkheads and dropped ceilings been installed? Kitchen bulkheads at 2315 unless otherwise noted?
-
Has all trimming been installed? With screws through frames into top plates?
-
Are all the windows and doors installed as per the plan?
-
Have all door plates been removed with 5mm screw bolts installed?
-
Are the alfresco beams and steel posts installed as per the plan and layout?
-
Have all steel lintels or beams been packed for plasterboard?
-
Are all beams or frames fixed to steel beams? Eg over garage beams?
-
Are there any damaged frames requiring replacement or repair?
Flooring Systems
-
Have all joists been installed as per the layout? All joists landing on studs?
-
Has all the rim board been installed as per the layout?
-
Have all joist blocking been installed?
-
Have all steel beams been installed as per the plans?
-
Have all the joists boots been screwed off as per guidelines?
-
Have all LVL’s and 17c beams been installed correctly?
-
Is there 5mm clearance on steel beam packing LVL’s?
-
Have first floor frames been secured through the steel beams?
-
Are there any screws rubbing on joists?
-
Have all bracing trimmers been installed?
-
Is the flooring glued and screwed as per guidelines?
First Floor
-
Have all walls been erected as per the plan and layout?
-
Are all walls plumb and straight?
-
Have all strap braces been tensioned and screwed off at every frame point including noggins?
-
Are all K-Braces screwed off?
-
Are all strap bracing and K-Bracing double screwed into the flooring system?
-
Have all door plates been removed and 45mm screws installed?
-
Have the baths frames and ply sheeting been installed as per the plan?
-
Have all bulkheads and dropped ceilings been installed?
-
Have all windows been installed as per the plan?
-
-
Have all gang plates and internal to external strapping been installed?
Roofing
-
Have all trusses, hips and rafters been installed as per the layout?
-
Have all triple grips been installed as per the layout? Including first truncated truss?
-
Have all cyclone ties been installed and screwed as per the layout?
-
Has all the speed bracing been installed as per the layout? Including wrapped and fixed around both the hips and top plates?
-
Have all valleys been installed? Including valley boards, skid blocks etc?
-
Are all truss boots screwed off?
-
Is all trimming completed? Including change of direction at hip ends?
-
Has the man hole been trimmed with ply sheeting installed?
-
Have all shear blocks been installed?
-
Have all L-Grips been installed?
-
Have all Botton cord braces been installed?
Lower Roofs
-
Have all lower roofs been installed as per the plan and layout?
-
Are all triple grips installed as per the layout?
-
Are all the cyclone ties installed and screwed as per the layout?
-
Is all the speed bracing installed? Including wrapped and fixed over both top cords and top plates?
-
Is all trimming completed including change of direction at hip ends?
-
Are all steel uprights installed?
-
Are all truss boots screwed off?
-
Has the lower roof manhole been installed?
-
Are all shear blocks installed?
-
Are all L - Grips installed?