Information

  • JRM Weekly Safety Audit

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. General

  • 1.1 Did company representative accompany inspector?

  • 1.2 Are all Safety Signage/ Emergency Action Plans on Site

  • 1.3 Are OSHA posters/emergency numbers posted?

  • 1.4 Are confined space hazards identified & addressed?

  • 1.5 Are safety meetings held/documented?

  • 1.6 Are first aid kits available & properly stocked?

  • 1.7 Are fire extinguishers available/charged/inspected and rated 20 lbs ABC

  • 1.8 Are all rebar/pipe & other impalement hazards capped/protected?

  • 1.9 Are gas cylinders properly used & stored?

  • 1.10 Is material storage proper?

  • 1.11 Is housekeeping and sanitation proper & enforced?

  • 1.12 Are flammable materials in approved containers & properly labeled?

  • 1.13 Are all hand/power tools properly used/maintained/stored?

  • 1.14 Are all operations performed at least 10 feet from overhead power lines?

  • 1.15 Are competent flagmen properly dressed, trained & posted?

  • 1.16 Are barricades/traffic control through & around site proper?

  • 1.17 Are access/egress locations with a change in elevation >19 inches provided with stairs, ladders or ramp?

2. Equipment

  • 2.1 Are parts/equipment free from damage?

  • 2.2 Are all guards in place & working properly?

  • 2.3 Is all equipment properly maintained & inspected?

  • 2.4 Do backup alarms work?

  • 2.5 Are equipment operators properly trained?

  • 2.6 Are seatbelts operative & used?

  • 2.7 Are aerial/scissors lifts properly used?

  • 2.8 Are forks on the ground when parked?

  • 2.9 Is the forklift operator in the seat with a raised load?

3. Personal Protective Equipment

  • 3.1 Is PPE being worn by all JRM Personal.<br><br><br><br><br><br>

  • 3.2 Is respiratory protection proper?

  • 3.3 Is hearing protection used & proper?

  • 3.4 Is proper foot protection worn?

  • 3.5 Is proper head protection worn?

  • 3.6 Is proper eye protection worn?

  • 3.7 Is hand protection/clothing proper?

  • 3.8 Is PPE hazard assessment complete & on file?

  • 3.9 Is Appendix D on file for voluntary respirator use?

4. Electrical

  • 4.1 Are GFCI's in use.

  • 4.2 If temporary lights being used is there a permit from DOB on site

  • 4.3 Are Lockout/Tagout procedures in place & used?

  • 4.4 Are temporary cords properly used & maintained and temporary electrical panels being used?

  • 4.5 Do all boxes/panels have covers & are all circuits labeled?

  • 4.6 Are arc flash hazards identified & addressed?

  • 4.7 Are all live electrical closets locked and have posted danger no entry signage

5. Fall Protection

  • 5.1 Are all ladders being used properly?

  • 5.2 Is fall protection provided at heights over 6 feet?

  • 5.3 Is fall protection equipment inspected & maintained?

  • 5.4 Are stairways properly protected & used?

  • 5.5 Are all ladders rated heavy duty type 1 , 250lbs or greater also there are no aluminum ladders on site.<br>

  • 5.6 Are all floors holes properly covered or protected?

  • 5.7 Is the roofer's warning line system/roof monitor system proper?

6. Steel Erection/Cranes

  • 6.1 Is site access/layout/storage area proper?

  • 6.2 Has GC provided all written documents for erection process to begin?

  • 6.3 Is a Steel Erection Plan required & in place?

  • 6.4 Is crane setup proper?

  • 6.5 Is crane properly maintained/copy of annual inspection available?

  • 6.6 Is rigging hardware inspected daily?

  • 6.7 Are loads properly rigged/carried?

  • 6.8 Are areas under swinging loads properly barricaded & enforced?

  • 6.9 Are rigger & signalperson trained/qualified?

  • 6.10 Are steel erection procedures proper?

  • 6.11 Are 2-bolt connections/4 bolt column anchor requirements followed?

  • 6.12 Are connector requirements in compliance?

  • 6.13 Does Controlled Decking Zone meet standards.

  • 6.14 Are employees using fall protection above 15 feet. ( Subpart R )

  • 6.15 Are oxygen & acetylene bottles properly used & stored?

  • 6.16 Is a JRM Hot Work Permit completed & posted when required?

  • 6.17 Is perimeter safety cable properly installed & used?

7. Masonry/Scaffolding

  • 7.1 Is scaffold competent person on site?

  • 7.2 Are all scaffold users properly trained?

  • 7.3 Are scaffold erection/disassembly procedures proper?

  • 7.4 Is fall protection provided for erectors/dismantlers?

  • 7.5 Are baseplates/mud sills stable & proper?

  • 7.6 Are all scaffold frames pinned together?

  • 7.7 Is scaffold tied to structure using stiffbacks?

  • 7.8 Are scaffold frames/planks/parts free of damage & defects?

  • 7.9 Are walk/work planks properly installed & set?

  • 7.10 Are guardrails properly installed & used?

  • 7.11 Are toe boards/warning line properly installed & used?

  • 7.12 Is scaffold /baker access proper, are all whelks locked when in use?

  • 7.13 Are masonry walls properly braced?

  • 7.15 Are all of baker scaffolds guard rails on at 4ft ?

  • 7.16 Do those that work on a scaffold/baker possess a 4hr scaffold card.

8. Trenching/Excavating

  • 8.1 Is the trench competent person on site?

  • 8.2 Is the trench/excavation inspected daily?

  • 7.14 Is the Limited Access Zone set & enforced?

  • 8.3 Has a proper soils analysis been conducted?

  • 8.4 What is the soil type?

  • 8.5 Is employee protection proper for soil type & depth?

  • 8.6 What type of employee protection is in place?

  • 8.7 Is safe access/egress provided?

  • 8.8 Are water removal procedures proper?

  • 8.9 Has the trench been evaluated as a confined space?

9.0. Summury

  • The overall rating for this audit is?

  • Comments

  • Supervisor signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.