Information
-
Job Reference:
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel Involved:
-
ACTIVITY DESCRIPTION:
HAZARDS
-
1.1. Height
-
1.2. Equipment
-
1.3. Power Lines
-
1.4. Electricity
-
1.5. Sharp Objects
-
1.6. Slippery / Wet Surfaces
-
1.7. Gasses
-
1.8. Dust
-
1.9. Underground Utilities
-
1.10. Overhead Obstructions
-
1.11. Hazardous Substances
-
1.12. Working In Isolation
-
1.13. Ignition Sources
-
1.14. Manual Handling
-
1.15. High Pressure
-
1.16. Lifting Equipment
-
1.17. Rotating Machinery
-
1.18. Entry & Exit
-
1.19. Ground Openings
-
1.20. Entanglement
-
1.21. Animals, Pests
-
1.22. High Voltage
-
1.23. Confined Space
-
1.24. Sun Rays / Adverse Weather Conditions
-
1.25. Pollution
-
1.26. Grinding
-
1.27. Public Areas
-
1.28. Other Hazards
CONTROL MEASURES
-
2.1. Isolations
-
2.2. Spotters
-
2.3. Lighting
-
2.4. Respiratory Protection
-
2.5. Application of PPE
-
2.6. Signage
-
2.7. Barricades
-
2.8. Fall Arrest
-
2.8. Extinguishers
-
2.9. Screens
-
2.10. Fire Blankets
-
2.11. Procedures
-
2.12. Competent People
-
2.13. Locating Equipment
-
2.14. UV Protection
-
2.15. Gas Detection
-
2.16. Designated Work Areas
-
2.17. Supervision of Public
-
2.18. Other Control Measures
DESCRIPTION OF WORKS & CONTROLS
-
3.1. Job Steps
-
3.2. Risk Description
-
3.3. Controls Description
SIGN OFF
-
Team Member
-
Team Member
-
Team Member
-
Team Member
-
Authorized Person: I have reviewed this JSA and agree that it is a fair assessment of the job and I authorize this work to proceed.
-
Team Leader