Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Product General Information

  • Product Name \ Product Number for which the Audit is being conducted:

  • Description of the product for which the Audit is being conducted:

  • Example Photo of the Product that is being Audited:

  • To what level is the product ready ready to move into full production? (0-3 = not ready multiple major gaps exist, 4-6 = preliminary pilot run ready with few major and minor gaps, 7-8 production ready with only minor gaps, 9-10 = full production ready)

  • General Audit Summary:

  • Signature of Auditor:

Material Inventories, Pilot builds, Equipment, Tools, and Facility

  • Have all components and parts materials been ordered or available for use in the inventory warehouse?

  • Has all the major production and testing equipment been installed and qualified? If no, list the equipment pending implementation.

  • Is tooling and processing fixtures (weld fixtures, circuit test fixtures, glue clamps, etc) available and qualified? If no, list tooling and fixtures pending implementation.

  • Does the facility have available resources (Floor Space, Power Outlets, Work Benches) to support planned production ramp? List any areas of risk.

  • Has any prototype \ pilot builds been conducted at the target production facility? If yes, list batch build code numbers,quantity, and testing outcome of pilot builds.

Basic Process and Engineering Documentation

  • Is a BOM product structure defined and registered into the MRP system or Document Control?

  • Is the Engineering Documents (component specifications or part drawings) for all material complete and released to Document Control?

  • Is the In-Process and Final Product Engineering Documents (assembly drawings) defined, complete, and released to Document Control?

  • Has an Engineering Product Specification Document been developed and released into Document Control?

  • Is the Production Process Map defined and contain all of the material inputs and sequenced procedure operations for producing the product?

  • Has an Illustration-Directory been developed and indicates the needed Engineering Documents for Production Manufacturing?

  • Has Manufacturing Cost been captured and an Analysis performed for producing the product?

  • Is the Production Traveler complete and correlate with the Production Process Map?

Production Procedure Documentation (Working Instructions)

Product Incoming Inspections

  • Do each of the material items in the process map have an Incoming Inspection Instruction Procedure documented? If no, please list the items that do not have a documented procedure.

  • If yes, have all the Incoming Inspection Instruction Procedure been released to Document Control? If no, please list the items that have not yet been released.

Process Procedure Details

  • Fill out a section and answer details for each operation defined in the Production Process Map. Addition of more sections in the template may be required.

Operation Detail 1

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 2

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 3

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 4

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 5

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 6

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 7

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 8

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 9

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 10

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 11

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 12

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 13

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 14

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 15

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 16

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 17

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 18

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 19

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 20

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 21

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 22

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 23

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 24

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 25

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 26

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 27

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 28

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 29

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 30

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 31

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 32

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 33

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 34

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 35

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 36

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 37

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 38

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 39

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Operation Detail 40

  • Operation Sequence Number / Node:

  • Operation Sequence Description:

  • Is the Product, Process, and Node correct on each section\page (process control card, data collection card, and operating procedure card) and correlate with the Production Process Map?

  • Does the documents for the operation have a unique document ID and revision on each page and is it correct?

  • On the process control card, does it have the operation process function called out correctly and include the process inputs, mechanisms, controls, outputs, and critical control data listed?

  • Is the critical control data and\or KPI's for this operation defined,identified, and recorded on the data collection card? (List the KPI's)

  • Are the Operating Procedure Instructions complete, correct, and when followed yeild the correct product output for the operation?

  • Does the content contained in the operation correlate with the Production Process Map?

Supply Chain

  • Has a supplier source been identified for each material item on the process map?

  • Has a price quote been obtained for each material item on the process map?

  • Has standard lead times for each material item on the process map been established?

  • Do any of the material items on the process map require special quality requirements from the supplier for receiving the item into inventory? If yes please list the item and confirm those requirements are included into the incoming inspection instructions for those items. (Example: Certificate of Compliance, Supplier Test Report, etc.)

Regulatory Compliance

  • Has the Product UN38.3 testing been completed and been found to conform to the regulation?

  • Has the Product completed the China Transportation Registration and been issued Certifications for Road, Sea, and Air transport? List the certificate numbers.

  • Has the Product completed testing and been found to conform to other regulatory compliance testing such as UL (1642, 2054) or IEC (62133)? List any applicable standards.

  • Has the Product been certified by an independent certification agency (TUV, UL,etc.) to a test standard? List the standard, certification agency, and certificate number.

Product Branding and Labeling

  • Is the product labeling complete and include the proper product number, product information (voltage, amp hour, watt hour), warnings, and handling information?

  • Is the product marketing data sheet complete, correct, and released into Document Control?

  • Has a product marketing campaign been developed and include press releases, articles, presentations, and brochures to promote the product?

Product and Shipping Packaging

  • Is the product packaging scheme complete? (blister pack, product box, etc.)

  • Has shipping boxes been designed with required markings and available for packing products for shipment?

  • Is a packaging procedure for preparing the product for shipment complete and include pallet layout and weight requirements?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.