Title Page
-
Conducted on
-
Prepared by
-
Location
-
Has a risk assessment and method statement been prepared
-
Obtain cast stone samples for approval
-
Check type, shape, colour and dimensions
-
Check for handling damage and repair work
-
Check all surfaces for cracks
-
Ensure items are clearly identified
-
Check relevant items have design approval
-
Ensure correct methods of unloading, handling and stacking
-
Ensure items are stored and protected as necessary
-
Check fixing methods are correct
-
Ensure DPC requirements are met
-
Check that any fixed stone susceptible to damage is protected
-
Check that Cast Stone Products have attained 14 day strength prior to delivery to site
-
Ensure that any shrink wrapping is removed 7 days prior to use