Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. Personnel

  • 1.1. All personnel Katala site inducted

  • 1.2. All personnel CSR site inducted

  • 1.3. Council, Client, Consultant representatives both Katala and CSR site inducted

  • 1.4. Evidence of operator competences

  • 1.5. Industry induction cards sighted

  • Induction register complete with evidence of training in SWMS and Safety Induction

2. Plant and Equipment

  • 2.1. Pre start check list in place for all items of plant

  • 2.2. Plant in good condition

  • 2.3. Safe or compatible attachments used with plant/equipment

  • 2.4. Competent operators

  • 2.5. Flashing lights and reverse beepers in place and working

  • 2.6. Tag out procedures for cleaning, servicing and maintenance

  • 2.7. Service records available for inspection

  • 2.8. Seat belts worn at all times

  • 2.9. Site speed limit sited and adhered to

3.0. Existing services

  • 3.1. DBYD Information on site and current

  • 3.2. All existing services located and plotted on plans

  • 3.3. Services which impact construction works physically marked

  • 3.4. Overhead power identified and protected

  • 3.5. All site personnel made aware of location of services

4. Lifting Equipment

  • 4.1. All lifting equipment free from damage

  • 4.2. Tests and tags current

  • 4.3. Correct SWL used

  • 4.4. SWMS in place for lifting

  • 4.10. Personnel trained in used of lifting equipment

5. Personal Protective Equipment

  • 5.1. Hard hats being worn at all times

  • 5.2. Hi Viz vests or equivalent at all times on site

  • 5.3. Safety foot ware being worn on site

  • 5.4. Hearing protection, breathing protection, gloves, safety glass available or being worn we're required

  • 5.5. Wet weather clothing available on site

6.0 Housekeeping

  • 6.1. Slip/trip hazards clear in pedestrian areas

  • 6.2. Rubbish bins in place

  • 6.3. Car park clearly marked and delineated

  • 6.4. Toilets clean and adequate for site

  • 6.5. Lunch room clean and adequate for site

  • 6.6. Drinking water available

  • 6.7. Safety policy displayed

  • 6.8. All construction signs in place at entry points to site and in other relavent places

7. Hazardous Substances

  • 7.1. MSDS register up to date

  • 7.2. MSDS attached to register

  • 7.3. Risk assessment completed for substances

  • 7.4. Storage area and Containers suitable for use and labelled correctly

  • 7.5. Personnel trained in use of hazardous substances

  • 7.6. Correct PPE and handling equipment on site

  • 7.7. Emergency procedures for spill/fire/exposure on site

  • Adequate ventilation

9. Emergency Response

  • 9.1. Emergency plans displayed with evacuation points

  • 9.2. First aid kit adequate, correctly stored and complete

  • 9.3. First aid officer's name displayed

  • 9.4. Emergency phone numbers displayed

  • 9.5. Insufficient access to formally trained First Aiders for all shifts?

  • 9.6. Fire extinguishers suitable and currently inspected

10. Traffic Management

  • 10.1. Traffic management plan, (TMP), iin place

  • 10.2. Personnel trained in TMP

  • 10.3. TMP daily inspection being conducted

11. Personal Protective Equipment (PPE)

  • 11.1. Lack of, or inadequate PPE (including sun protection)

  • 11.2. Lack of system to issue, inspect, replace and monitor PPE?

  • 11.3. Lack of training in safe use, clean-up and inspection of PPE?

12. Electrical Hazards

  • 12.1. Electrical leads safe? (damaged, out of test date or untested)

  • 12.2. Earth leakage protection in place

  • 12.3. Outlets overloaded

  • 12.4. Leads off ground and insulated from metallic structures

  • 12.5. Electrical equipment clear of water

13. Trenches and Excavations

  • 13.1. Trenches battered or benched at 1:1 or shored

  • 13.2. Sound and adequate ladders in place at 9m spacing

  • 13.3. Barricades around excavations( min 1m form edge)

  • 13.4. Wearing signs in place

14. Confined Spaces

  • 14.1. Risk assessment completed by competent person

  • 14.2. Recovery gear in place

  • 14.3. Air quality monitored

  • 14.4. Personnel trained in confined space

  • 14.5. Entry/exit procedure followed

15. Manual Handling

  • 15.1. Lifting, pulling, pushing, dragging of heavy loads to be avoided

  • 15.2. Bending or reaching above shoulder height and twisting of back to be avoided

  • 15.3. Mechanical lifting aids available where required

  • 15.5. Safe team lift procedure in place

16. Security

  • 16.1. Personnel not working alone or in isolation where possible

  • 16.2. Staff movement book being used

  • 16.3. Visitor book being used

Corrective Actions

  • Enter any corrective actions that will be undertaken

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.