Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Personnel
-
1.1. All personnel Katala site inducted
-
1.2. All personnel CSR site inducted
-
1.3. Council, Client, Consultant representatives both Katala and CSR site inducted
-
1.4. Evidence of operator competences
-
1.5. Industry induction cards sighted
-
Induction register complete with evidence of training in SWMS and Safety Induction
2. Plant and Equipment
-
2.1. Pre start check list in place for all items of plant
-
2.2. Plant in good condition
-
2.3. Safe or compatible attachments used with plant/equipment
-
2.4. Competent operators
-
2.5. Flashing lights and reverse beepers in place and working
-
2.6. Tag out procedures for cleaning, servicing and maintenance
-
2.7. Service records available for inspection
-
2.8. Seat belts worn at all times
-
2.9. Site speed limit sited and adhered to
3.0. Existing services
-
3.1. DBYD Information on site and current
-
3.2. All existing services located and plotted on plans
-
3.3. Services which impact construction works physically marked
-
3.4. Overhead power identified and protected
-
3.5. All site personnel made aware of location of services
4. Lifting Equipment
-
4.1. All lifting equipment free from damage
-
4.2. Tests and tags current
-
4.3. Correct SWL used
-
4.4. SWMS in place for lifting
-
4.10. Personnel trained in used of lifting equipment
5. Personal Protective Equipment
-
5.1. Hard hats being worn at all times
-
5.2. Hi Viz vests or equivalent at all times on site
-
5.3. Safety foot ware being worn on site
-
5.4. Hearing protection, breathing protection, gloves, safety glass available or being worn we're required
-
5.5. Wet weather clothing available on site
6.0 Housekeeping
-
6.1. Slip/trip hazards clear in pedestrian areas
-
6.2. Rubbish bins in place
-
6.3. Car park clearly marked and delineated
-
6.4. Toilets clean and adequate for site
-
6.5. Lunch room clean and adequate for site
-
6.6. Drinking water available
-
6.7. Safety policy displayed
-
6.8. All construction signs in place at entry points to site and in other relavent places
7. Hazardous Substances
-
7.1. MSDS register up to date
-
7.2. MSDS attached to register
-
7.3. Risk assessment completed for substances
-
7.4. Storage area and Containers suitable for use and labelled correctly
-
7.5. Personnel trained in use of hazardous substances
-
7.6. Correct PPE and handling equipment on site
-
7.7. Emergency procedures for spill/fire/exposure on site
-
Adequate ventilation
9. Emergency Response
-
9.1. Emergency plans displayed with evacuation points
-
9.2. First aid kit adequate, correctly stored and complete
-
9.3. First aid officer's name displayed
-
9.4. Emergency phone numbers displayed
-
9.5. Insufficient access to formally trained First Aiders for all shifts?
-
9.6. Fire extinguishers suitable and currently inspected
10. Traffic Management
-
10.1. Traffic management plan, (TMP), iin place
-
10.2. Personnel trained in TMP
-
10.3. TMP daily inspection being conducted
11. Personal Protective Equipment (PPE)
-
11.1. Lack of, or inadequate PPE (including sun protection)
-
11.2. Lack of system to issue, inspect, replace and monitor PPE?
-
11.3. Lack of training in safe use, clean-up and inspection of PPE?
12. Electrical Hazards
-
12.1. Electrical leads safe? (damaged, out of test date or untested)
-
12.2. Earth leakage protection in place
-
12.3. Outlets overloaded
-
12.4. Leads off ground and insulated from metallic structures
-
12.5. Electrical equipment clear of water
13. Trenches and Excavations
-
13.1. Trenches battered or benched at 1:1 or shored
-
13.2. Sound and adequate ladders in place at 9m spacing
-
13.3. Barricades around excavations( min 1m form edge)
-
13.4. Wearing signs in place
14. Confined Spaces
-
14.1. Risk assessment completed by competent person
-
14.2. Recovery gear in place
-
14.3. Air quality monitored
-
14.4. Personnel trained in confined space
-
14.5. Entry/exit procedure followed
15. Manual Handling
-
15.1. Lifting, pulling, pushing, dragging of heavy loads to be avoided
-
15.2. Bending or reaching above shoulder height and twisting of back to be avoided
-
15.3. Mechanical lifting aids available where required
-
15.5. Safe team lift procedure in place
16. Security
-
16.1. Personnel not working alone or in isolation where possible
-
16.2. Staff movement book being used
-
16.3. Visitor book being used
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
On site representative
-
Auditor's signature