Title Page
-
Audit Title
-
Client / Site
-
Prepared by
-
Personnel
SIGNAGE and COVID19 Controls
-
Face Coverings
-
Sanitizing
-
Current Sanitizing Log
-
Temp Screening
-
COVID19 Posters
-
Hand Sanitizer
-
Warning Signs
-
Laser Sign if needed
-
Silica Sign if risk present
-
Haz Assessment Thoroughly Completed - Does it reflect ALL risks?
-
Sign In
-
DOL Poster
-
Cal OSHA Safety Poster
-
KDC rules posted
-
MPN and map posted
-
Incident Reporting instructions posted
-
Emergency Evac
-
Fire Extg
Public
-
Pedestrian / Public Protection Plan
-
Fencing
-
Access
-
Any trip hazards for public
Fall Protection/Prevention
-
Scissor lift safety and compliance
-
Fall protection if exposed to a free fall six feet or more
Scaffold Compliance
-
Rolling Scaffold Plan
-
Scaffold Safety
-
Scaffold Plan
Trenching Excavation
-
Soil Testing
-
Annual Trench Permit from OSHA
-
811 Called Ticket No
-
Permit
-
Access Egress 4ft or >
-
Cave In Protection
-
Fall Protection 6ft or >
-
Tabulated Data Sheets
Electrical / Tools
-
Tool safety
-
Equipment safety
-
Electrical Safety - GFCI, Temp Power, Cords, Open Panels, LOTO
Ladders
-
Ladder Safety including manufacturing labels
-
Ladder usage and set up
Housekeeping
-
Housekeeping [Interior & Exterior]
-
Water in compliance with HIPP
-
Caught In-between/Struck By
-
Any trip and fall hazards
-
Impalement Protection
Safety Plans - Required Permits
-
Silica Mngt Plan
-
Demo Plan
-
Hot Work Permit
-
Fall Protection Plan 15 or>
-
Scaffold Plan
-
Pedestrian Protection Plan (Signed)
-
Crane Plan
-
Lock Out Tag Out Plan
-
Fork/Boom Lift Certs
-
Powder Actuated Tool Lic
PPE
-
PPE Compliance - Z87.1, N95, N100, Hardhats, Gloves, Hearing P, Class II Vests
-
SWPPP ISSUES?
-
Dust Control
Sanitation
-
External Wash Station
-
Clean with supplies
Crane Lift Inspection
-
All Paperwork Submitted
-
1. Name of the operator<br><br>2. Operators crane card<br><br>3. Annual Crane Cert<br><br>4. What are we are lifting<br><br>5. Weight of item<br><br>6. Total boom length<br><br>7. Boom length time of lift<br><br>8. Swing Radius<br><br>9. Rigging Being used<br><br>10. Party executing rigging
-
Pre Lift Meeting - This meeting shall be held prior to the lift at each new work location and shall be repeated for any employees newly assigned to the operation
-
Inspection of all blocks, straps, guy lines.Examination for damaged, cracked, or worn parts, loose nuts and bolts, and of lubrication and condition of straps and guy lines
-
Confirm there is no heat damage including weld splatter Arc stripes or evidence of tearing or splitting
-
Confirm there is no excessive nicks, cuts, splices or corrosion.
-
Confirm all shakels are USA made precluding and rigging from China.
-
Review for legible manufacturers tags of rigging straps with rated load
-
Tag Lines Being Used
-
% of lift compared to max capacity based on load chart MUST be 70% or less
Training/Coaching Provided
-
Areas of training were provided. Be specific.Hiw did we help? What did we do?
-
Signatures