  • Audit Title

  • Client / Site

  • Prepared by

  • Personnel

SIGNAGE and COVID19 Controls

  • Face Coverings

  • Sanitizing

  • Current Sanitizing Log

  • Temp Screening

  • COVID19 Posters

  • Hand Sanitizer

  • Warning Signs

  • Laser Sign if needed

  • Silica Sign if risk present

  • Haz Assessment Thoroughly Completed - Does it reflect ALL risks?

  • Sign In

  • DOL Poster

  • Cal OSHA Safety Poster

  • KDC rules posted

  • MPN and map posted

  • Incident Reporting instructions posted

  • Emergency Evac

  • Fire Extg

Public

  • Pedestrian / Public Protection Plan

  • Fencing

  • Access

  • Any trip hazards for public

Fall Protection/Prevention

  • Scissor lift safety and compliance

  • Fall protection if exposed to a free fall six feet or more

Scaffold Compliance

  • Rolling Scaffold Plan

  • Scaffold Safety

  • Scaffold Plan

Trenching Excavation

  • Soil Testing

  • Annual Trench Permit from OSHA

  • 811 Called Ticket No

  • Permit

  • Access Egress 4ft or >

  • Cave In Protection

  • Fall Protection 6ft or >

  • Tabulated Data Sheets

Electrical / Tools

  • Tool safety

  • Equipment safety

  • Electrical Safety - GFCI, Temp Power, Cords, Open Panels, LOTO

Ladders

  • Ladder Safety including manufacturing labels

  • Ladder usage and set up

Housekeeping

  • Housekeeping [Interior & Exterior]

  • Water in compliance with HIPP

  • Caught In-between/Struck By

  • Any trip and fall hazards

  • Impalement Protection

Safety Plans - Required Permits

  • Silica Mngt Plan

  • Demo Plan

  • Hot Work Permit

  • Fall Protection Plan 15 or>

  • Scaffold Plan

  • Pedestrian Protection Plan (Signed)

  • Crane Plan

  • Lock Out Tag Out Plan

  • Fork/Boom Lift Certs

  • Powder Actuated Tool Lic

PPE

  • PPE Compliance - Z87.1, N95, N100, Hardhats, Gloves, Hearing P, Class II Vests

  • SWPPP ISSUES?

  • Dust Control

Sanitation

  • External Wash Station

  • Clean with supplies

Crane Lift Inspection

  • All Paperwork Submitted

  • 1. Name of the operator<br><br>2. Operators crane card<br><br>3. Annual Crane Cert<br><br>4. What are we are lifting<br><br>5. Weight of item<br><br>6. Total boom length<br><br>7. Boom length time of lift<br><br>8. Swing Radius<br><br>9. Rigging Being used<br><br>10. Party executing rigging

  • Pre Lift Meeting - This meeting shall be held prior to the lift at each new work location and shall be repeated for any employees newly assigned to the operation

  • Inspection of all blocks, straps, guy lines.Examination for damaged, cracked, or worn parts, loose nuts and bolts, and of lubrication and condition of straps and guy lines

  • Confirm there is no heat damage including weld splatter Arc stripes or evidence of tearing or splitting

  • Confirm there is no excessive nicks, cuts, splices or corrosion.

  • Confirm all shakels are USA made precluding and rigging from China.

  • Review for legible manufacturers tags of rigging straps with rated load

  • Tag Lines Being Used

  • % of lift compared to max capacity based on load chart MUST be 70% or less

Training/Coaching Provided

  • Areas of training were provided. Be specific.Hiw did we help? What did we do?

  • Signatures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.