Information
-
Document No.
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
undefined
-
Work/Job Order #:
-
Observer:<br>
-
Crew Leader Observed:
- Arthur
- Bachman
- Bandy
- Barb
- Cardinel
- Colt Clark
- Richard Clark
- Cook
- Crouse
- Dotts
- Dubois
- Ducken
- Elwess
- Fournier,D
- Fournier,G
- Gednalske
- Hall,Cameron
- Hall,Chad
- Hannon
- Hongslo
- Hull
- Jerome
- Johnson, Tyler
- Kennedy, Colby
- Lortie
- Olson
- Palacios, Damon
- Pilgrim
- Rollins
- Smither
- Smith, Adam
- Smith, Rob
- Snell, Hayden
- Teal
- Thompson, Will
- Thompson, Eric
- Turley
- Tolzmann
- Trahanes, Ty
- Underdown
- VanDewerker
- Wagner,Garth
- Wanous
- Wold
- Brunner, Brian
-
Employees Observed:
- Arthur
- Bachman
- Bandy
- Barb
- Cardinel
- Colt Clark
- Richard Clark
- Cook
- Crouse
- Dotts
- Dubois
- Ducken
- Elwess
- Fournier,D
- Fournier,G
- Gednalske
- Hall,Cameron
- Hall,Chad
- Hannon
- Hongslo
- Hull
- Jerome
- Johnson, Tyler
- Kennedy, Colby
- Lortie
- Olson
- Palacios, Damon
- Pilgrim
- Rollins
- Smither
- Smith, Adam
- Smith, Rob
- Snell, Hayden
- Teal
- Thompson, Will
- Thompson, Eric
- Turley
- Tolzmann
- Trahanes, Ty
- Underdown
- VanDewerker
- Wagner,Garth
- Wanous
- Wold
- Brunner, Brian
Job Task:
-
Scope of Work:
-
Job Type:
- Daily Scheduled Work
- Overtime Work
- Storm Work
- Overhead
- Underground
- Street Lighting
- Sub-Station
- Customer Owned
- Primary
- Secondary
- Metering
- New Construction
- Existing Construction
- Tree Trimming
- Circuit Switching
- Maintenance
- Transmission
- Three Phase
- Single Phase
- Single Phase Transformer
- Power Bank Transformer
- Capacitor Bank
- Regulator
- Auto Booster
- Underground Riser
- Customer Service
- Pad Mount Transformer
- Pole Mounted Transformer
- Circuit Switches
- Oil Switches
- Vacuum Switches
- Fault Indicators
- Splicing Wire
- Wye Primary
- Primary Gloves Class 2
- 12kV system
- 25kV system
-
Recommendation:
-
Issues that need to be resolved:
Vehicles:
-
Proper Traffic Control (signs & cones)
-
Wheel Chocks Set (OSHA 1910.67)
-
Outrigger Set/Solid Surface <br>(OSHA 1910.67)
-
Vehicle Condition <br>(OSHA 1910.67)
-
Pre-Flight Aerial Life Checks (OSHA 1910.67)<br><br>
-
Vehicle Properly Grounded/Barricaded (OSHA 1910.269 (q) )<br>
-
DOT Walk Around<br>
Work Area Safety Procedures:
-
Testing Procedures OK<br>
-
Hot Stick Work<br>
-
Climbing Pole/Pre-Climb Inspection<br>
-
Pole Handling<br>
-
Protective Grounding<br>
-
Ladder Safety<br>
-
Control of Hazardous Energy<br>
-
Properly Locked and/or Tagged<br>
-
Covering of Neutral <br>
-
Covering of Surrounding Phases<br>
-
Covering of Cross Arm & Pole <br>
-
Using Hot Stick to Install Truck Grounds<br>
-
Use of Hand Line on Pole During Work<br>
-
In Proper Working Position <br>
-
Circuit Open, Tested & Grounded<br>
-
Tagged Devices & Inoperative<br>
-
Line Treated as Live<br>
-
Confined/Enclosed Spaces<br>
-
Proper Use of Cover-up in Work Zone <br><br>
-
Comments:
Personal Safety:
-
Hard Hat (on and in good condition) (OSHA 1910.135)
-
Safety Glasses (OSHA 1910.133)<br>
-
Work Boots (OSHA 1910.136)<br>
-
Work Gloves (OSHA 1910.132)
-
Chainsaw Chaps<br>
-
FR Clothing (OSHA1910.269(2) )
-
Rubber Gloves & Protectors: Check for current test date. (OSHA 1910.137)<br>
-
Personal Fall Protection (OSHA 1910.269(g) )
-
Safety Vest (working in road ROW)<br>
-
Face Shield or Goggles (OSHA 1910.133)
-
Hearing Protection (OSHA 1910.95)
-
First Aid Kit (OSHA 1910.157)
-
AED<br>
-
Fire Extinguisher/s<br>
-
Seat Belt Usage<br>
-
Climbing Tools in Good Condition<br>
Work Area Safety: Tail Gates
-
Discussed Hazards
-
Work Procedures
-
Special Precautions
-
Personal Protective Equipment
-
Energy Source Control
-
Safe & Clean Work Area<br>
-
Tools in Good Working Condition<br>
-
“Hot” Tools Clean, Tested & Inspected<br>
-
Sharps covered<br>
-
Slings and Ropes<br>
-
Called in Location and Circuit of Work<br>
-
Equipment Storage on Truck<br>
-
Comments:
-
Comments of Crew/Crew Leader/Lead Lineman:
-
Discussion/Training with Crew by Inspector/ Supervisor Concerning Proper Work Practices and/or Safety Rules: