Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
If 'NO' is selected for any of the controls - Work must stop immediately until the control is in place and verified
CONTROL: Positively identify all services within planned excavation area. Purpose: To prevent mechanical disturbance of known and unknown underground services
-
Tick "Yes" if applicable
-
Proof of dial before you dig prior to the commencement of the excavation?
-
Inspection of the planned excavation site and surrounding area has been conducted to identify any visual indicators of buried services?
-
Cable locating used to verify location of known services within close vicinity of the planned excavation?
-
Spray paint on ground indicating where service is; depth, direction and Mechanical No Dig Zone?
-
Pot hole markers every five metres (Showing depth and direction)?
-
Excavation permit in place?
-
Additional precautions when working in vicinity of Known HV services: (Complete Below)
-
Pot hole markers every three metres (Showing depth and direction)?
-
GPR (Ground Penetrating Radar) of entire planned excavation?
-
Slit trenches have been dug around the perimeter to the depth of the excavation?
CONTROL: Isolate all identified HV electrical or high-risk services with potential to encroach within 5m of the planned excavation Purpose: To de-energise identified HV electrical and high-risk services within the planned excavation
-
Tick "Yes" if applicable
-
Completed Isolation instruction for HV electrical and high-risk services?
-
Lockout / Tagout hardware in place?
-
Procedures implemented and control measures in place for high-risk services including Asbestos and Silica Dust?
CONTROL: Minimum clearance is maintained from all underground services Purpose: To prevent contact with known services within the planned excavation
-
Tick "Yes" if applicable
-
A dedicated spotter used when performing mechanical excavation in the vicinity of underground services?
-
500mm separation from known live HV services is maintained?
-
300mm separation from known HV and LV isolated electrical services?
CONTROL: Excavations greater than 1.5m are benched, battered, shored or verified stable PURPOSE: To prevent excavation collapse
-
Tick "Yes" if applicable
-
If excavation is greater than 1.5 metres in depth, benching (1:1 ratio & not exceeding 1.5 metres), battering (not exceeding a slope of less than 45 degrees) or shoring is in place?
-
(If the requirements above are not met, formal notification from a suitably qualified engineer is mandatory)
CONTROL: Heavy loads and machinery are stable and positioned outside the ‘zone of influence’ of the excavation PURPOSE: To prevent loads or machines falling into an excavation
-
Tick "Yes" if applicable
-
'Zone of influence' where the minimum set back distance is at least equal to the depth of the excavation is in place?
-
Set back distances in place?
-
No loads on zone of influence unless a shoring box is in place?
-
Battered sides of trenches and excavations?
-
Excavations are clear of persons when there is risk of plant or loads falling into the excavation? (no persons in the line of fire)
CONTROL: Barricading of excavations that create a fall risk PURPOSE: To prevent a person from falling into an open excavation
-
Tick "Yes" if applicable
-
If excavation creates a fall risk of more than 1.5 metres, either hard barricading on the edge of excavation OR soft barricading at least 2 metres from the edge of the excavation?
-
Sign(s) that say, "DANGER DEEP EXCAVATION” that warn people approaching the excavation?
-
No person putting themselves at risk of falling more than 1.5 metres? (including spotters)
CONTROL: No persons working within the slew radius of mobile plant during operation without positive communication with the operator PURPOSE: To prevent mobile plant from striking a person
-
Tick "Yes" if applicable
-
Spotter in place using positive communication with the machine operator?
-
Bucket grounded and control de-activated before person enters the slew radius exclusion zone?
-
No person in the slew radius exclusion zone during operation?
-
Exemption for workers protected by the sides/wall of a trench or excavation?
CONTROL: Emergency Response PURPOSE: To mitigate the impact on human life of exposure to unsafe conditions during excavation and trenching works
-
Tick "Yes" if applicable
-
High risk rescue plan in place for workers entering an excavation deeper than 1.5m?
-
Spotter in place as per the rescue plan?
-
If the mobile plant spotter is the dedicated rescue person, do they have visibility of all persons in the excavation?
-
Rescue equipment in place (as per the rescue plan)? e.g. davit arms on shoring box, ladders every 9m
-
First aid resources and first aid trained workers in place?
Additional Information
-