CONTROL: Positively identify all services within planned excavation area. Purpose: To prevent mechanical disturbance of known and unknown underground services

  • Tick "Yes" if applicable

  • Proof of dial before you dig prior to the commencement of the excavation?

  • Inspection of the planned excavation site and surrounding area has been conducted to identify any visual indicators of buried services?

  • Cable locating used to verify location of known services within close vicinity of the planned excavation?

  • Spray paint on ground indicating where service is; depth, direction and Mechanical No Dig Zone?

  • Pot hole markers every five metres (Showing depth and direction)?

  • Excavation permit in place?

  • Additional precautions when working in vicinity of Known HV services: (Complete Below)

  • Pot hole markers every three metres (Showing depth and direction)?

  • GPR (Ground Penetrating Radar) of entire planned excavation?

  • Slit trenches have been dug around the perimeter to the depth of the excavation?

CONTROL: Isolate all identified HV electrical or high-risk services with potential to encroach within 5m of the planned excavation Purpose: To de-energise identified HV electrical and high-risk services within the planned excavation

  • Tick "Yes" if applicable

  • Completed Isolation instruction for HV electrical and high-risk services?

  • Lockout / Tagout hardware in place?

  • Procedures implemented and control measures in place for high-risk services including Asbestos and Silica Dust?

CONTROL: Minimum clearance is maintained from all underground services Purpose: To prevent contact with known services within the planned excavation

  • Tick "Yes" if applicable

  • A dedicated spotter used when performing mechanical excavation in the vicinity of underground services?

  • 500mm separation from known live HV services is maintained?

  • 300mm separation from known HV and LV isolated electrical services?

CONTROL: Excavations greater than 1.5m are benched, battered, shored or verified stable PURPOSE: To prevent excavation collapse

  • Tick "Yes" if applicable

  • If excavation is greater than 1.5 metres in depth, benching (1:1 ratio & not exceeding 1.5 metres), battering (not exceeding a slope of less than 45 degrees) or shoring is in place?

  • (If the requirements above are not met, formal notification from a suitably qualified engineer is mandatory)

CONTROL: Heavy loads and machinery are stable and positioned outside the ‘zone of influence’ of the excavation PURPOSE: To prevent loads or machines falling into an excavation

  • Tick "Yes" if applicable

  • 'Zone of influence' where the minimum set back distance is at least equal to the depth of the excavation is in place?

  • Set back distances in place?

  • No loads on zone of influence unless a shoring box is in place?

  • Battered sides of trenches and excavations?

  • Excavations are clear of persons when there is risk of plant or loads falling into the excavation? (no persons in the line of fire)

CONTROL: Barricading of excavations that create a fall risk PURPOSE: To prevent a person from falling into an open excavation

  • Tick "Yes" if applicable

  • If excavation creates a fall risk of more than 1.5 metres, either hard barricading on the edge of excavation OR soft barricading at least 2 metres from the edge of the excavation?

  • Sign(s) that say, "DANGER DEEP EXCAVATION” that warn people approaching the excavation?

  • No person putting themselves at risk of falling more than 1.5 metres? (including spotters)

CONTROL: No persons working within the slew radius of mobile plant during operation without positive communication with the operator PURPOSE: To prevent mobile plant from striking a person

  • Tick "Yes" if applicable

  • Spotter in place using positive communication with the machine operator?

  • Bucket grounded and control de-activated before person enters the slew radius exclusion zone?

  • No person in the slew radius exclusion zone during operation?

  • Exemption for workers protected by the sides/wall of a trench or excavation?

CONTROL: Emergency Response PURPOSE: To mitigate the impact on human life of exposure to unsafe conditions during excavation and trenching works

  • Tick "Yes" if applicable

  • High risk rescue plan in place for workers entering an excavation deeper than 1.5m?

  • Spotter in place as per the rescue plan?

  • If the mobile plant spotter is the dedicated rescue person, do they have visibility of all persons in the excavation?

  • Rescue equipment in place (as per the rescue plan)? e.g. davit arms on shoring box, ladders every 9m

  • First aid resources and first aid trained workers in place?

Additional Information

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.