Information

  • Job Number

  • Job Name

  • Conducted on

  • Prepared by

  • Competent Person

General Conditions

  • Proper Keller signage is positioned for best visibility?

  • Site access is adequate?

  • Dumpsters and toilets are available?

  • All permits and state approved plans are on site?

Site Work

  • All utilities are marked?

  • Roadways adjacent to the site are cleaned and maintained?

  • Excavations are back filled and compacted properly?

Footings and walls

  • Was specified mix used?

  • Were test cylinders taken

  • Was the correct size and quantity of rebar available and placed per plan?

  • Are anchor bolts set with correct dimensions and projections?

  • Is there excessive honey combing that requires back-plastering to achieve an acceptable finish?

  • Do all dimensions of concrete and anchor bolts match the plan?

  • Are weep holes, wall cuts, and plates installed per plan?

  • Backfill was done in layers and adequately tamped

Concrete Flat Work

  • Pours were planned for quality and efficiency?

  • Grading was precise to avoid concrete overages?

  • Was a custom mix called for and used?

  • Placement of rebar/reinforcement was correct?

  • Guard posts, trench drains, pit bottoms, and truck docks all meet specifications?

  • Water stop is installed properly and welded as needed?

  • Proper pitch to catch basins and drains?

  • In floor heat is layer out to avoid stud walls?

  • Expansion joint is used where needed?

  • Door openings are isolated to avoid cracking from shrinkage?

  • Expansion joints are laid out to reduce unwanted spider cracks and under walls when possible?

  • Expansion joints are cut deeper at intersecting points and drilled to guide cracking?

  • Slab finish meets customers expectations?

  • Curing or Sealing agent coverage is applied as specified?

  • Joints Caulked

Masonry

  • Nervastral ; sealed to floor and wall

  • Weeps are installed at base and above headers

  • Bearing plates are installed

  • Header is painted

  • Mortar net installed'

  • Masonry has been washed and sealed?

  • Block is insulated

  • Bond beam and reinforcing as required is complete

Building Erection (Steel)

  • Building layout is orderly and efficient

  • Structure is braced adequately and plumb and square

  • All bearing heights have been verified

  • All bolts are tightened and marked

  • All openings are flashed correctly

  • All side steel fits well and is fully screwed

  • Roof is installed correctly, seamed, stitch screws, roof hatches, deck tights, and roof curbs with crickets are installed

  • Trim work is complete including eave, rake, corner, ridge,gutters, down spouts, facades, mansards, scuppers, and overflows

  • Steel is clean

  • Stairs and rails are built and placed correctly, rails 42" & 21" heights off walking surface

Building Erection (Wood)

  • All walls plumb and square and on sill seal

  • All corners are insulated while they are accesiable

  • All door and window openings are proper size

  • Sheeting is nailed per schedule

  • Building wrap is installed correct, wraps all jambs

  • Trusses are installed per plan and bracing meets requirements

  • All required joist hangers and clips are installed

  • Smoke and fire barriers are installed per requirements

  • Facias and soffits fit well

  • Siding fits well and is caulked where needed

  • Roof material is sealed, flashed, and square, all penetrations are weather tight

Insulation and vapor barriers

  • In floor is installed

  • Sidewall and Endwall

  • Roof

  • Interior wall and ceiling or attic

  • Are all seams closed and acceptable in appearance

  • Have all rips and holes been repaired

  • Vapor barriers are installed on the warm side of the insulation

Doors and Windows

  • OHD flashed and installed as required, drip caulked

  • Steel and Aluminum service doors, swing, hardware, closer, paint, caulked, light kit, threshold

  • Wood and aluminum interior doors, fit, stain, closer, hardware, light kit, door bumpers

  • Windows caulk, positive pitch, returns, flashed correctly

Interior carpentry

  • Framing is plumb and square, 2x6 walls as needed, backing, fire rated, insulated

  • Casings, base, accessories including, mirrors, grad bars, fire extinguishers, paper product dispensers, signage

  • Do all doors operate and latch smoothly

Finishes

  • Drywall, expansion joints at 30' max.

  • Paints and primers

  • Nail holes are filled with puddy

  • Stain is acceptable

  • Ceiling and Grids complete and symmetrical

  • Floor, VCT, ceramic, tile, carpet all joints and ends are complete

  • All areas are clean

Plumbing

  • All items are per plan

  • Drains are placed correctly

  • Stacks are sealed

Electrical

  • All penetrations are sealed?

  • Service is protected with a viable cover, NOT cardboard?

  • All cover plates are installed and all screws were installed?

Miscellaneous and general items

  • Comments:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.