Information

  • Job Number

  • Contracts Manager

  • Prepared by

  • Conducted on

  • Location
  • Personnel

  • Main Task

  • Asbestos Material

  • Asbestos Type

  • Priority visit?

  • Job Notified?

SITE GENERAL

  • Have all lads got ID cards ?

  • Are all lads wearing Keltbray clothing ?

  • Are pedestrian route and walkways clear?

  • Are first aid and fire equipment available?

  • Is there adequate lighting?

PLANNING AND DOCUMENTATION

  • Have you checked the POW, ASB5 and Risk assessments?

  • Is there a copy of the Asbestos licence and insurance on site?

  • Does the site site layout agree with the drawings and photos and include the correct enclosure sizes and location?

  • Does the POW include the following - Air monitoring arrangements, 4 Stage clearance, smoke testing and witnessing, Type of RPE and the hours of work?

REGULATORY RECORDS

  • Asbestos Training - Medicals - Face Fits - Mask Cert -

  • Asbestos Training - Medicals - Face Fits - Mask Cert -

  • Asbestos Training - Medicals - Face Fits - Mask Cert -

  • Asbestos Training - Medicals - Face Fits - Mask Cert -

HYGIENE FACILITY/DECONTAMINATION UNIT

  • Are the following certification in place and in date? - Gas/Electrical/DOP and air clearance

  • Is there any damage to the outside unit and is it clean?

  • Is the DCU compliant with HSG247? E.g legs down and earthed, warning signs on doors, are all doors self closing, adequate showering facility and supplies, vents clean, hooks available for masks and are all areas free of dust?

  • Is the gas detected fitted and working?

SITE PREPARATION

  • Are any of the following activities or equipment being used?

  • Scaffolding

  • Ladders and steps

  • Mobiles towers

  • Confined space

  • During preparation /sheeting is the correct PPE & RPE being used?

  • Has the supervisor confirmed all ducts, hidden voids and pipes have been sealed?

AIRLOCK AND BAGLOCK

  • Has the airlock, baglock and enclosure have vision panels/CCTV fitted, can all areas be viewed?

  • Is the airlock, baglock and enclosure clean and free of dirt? <br>Check flaps and signage?

PPE

  • Are all operatives wearing and using the PPE correctly?

  • Have all masks been checked by a competent person?

CONTROL MEASURES-DUST REDUCTION/WET STRIPPING

  • Are dust levels being reduced to the lowest practicable levels?

  • Do the results of air monitoring indicate that the methods used are effective?

PLANT AND EQUIPMENT

  • Is the NPU working correctly? Check air flow indicator

  • Is the NPU correctly sheeted to the enclosure?

  • Does the NPU vent to the outside atmosphere? If venting inside is there regulars air monitoring taking place?

  • Are DOP/Electrical certificates available and in date for the NPU's and HVAC's?

WASTE HANDLING AND DISPOSAL

  • Is there a suitable waste route with signage? And does it follow the POW?

  • Have all waste bags been sufficiently soaked? Check for moisture content.

  • What condition is the skip? Is it lockable? Are suitable signs present?

  • COMMENTS

TRANSIT PROCEDURE

  • Is the transit procedure being followed correctly and signs in place?

VAN

  • Has it been air tested within the last one month?

  • Is the van compliant to the company's policy?

  • Comments

  • Select from range

  • Select date

  • Supervisor

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.