Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

INTRODUCTION

  • Front of building

  • Enquiry Number

  • Client details

  • Date of Visit

  • Type of building

  • Start Date

  • Finish Dates

  • Shift Starts

  • Shift Ends

  • Estimate of Number of Supervisors Required

  • Estimate of Number of Operatives on Site

  • Estimate of Number of shifts

1.0 SCOPE OF WORKS

  • Location of Task 1

  • Removal Task 1

  • Condition Task 1

  • Photo Task 1

  • Notes

  • Location of Task 2

  • Removal Task 2

  • Condition Task 2

  • Photo Task 2

  • Notes

  • Location of Task 3

  • Removal Task 3

  • Photo 3

  • Notes

1.1 Site Constraints and Conditions

  • General Conditions

  • Notes

  • Parking <br>

  • Add media

  • Notes

1.1.1 Pre-cleaning and decanting information

  • Add media

1.1.2 Electrical and Gas Isolations required

  • NO

  • YES

  • If isolations required state whose responsibility

  • Kershaw

  • Client to arrange

  • Electrical and gas installations requiring isolations

1.1.3 Mechanical Isolations, including AC, required

  • NO

  • YES

  • Add media

1.2 AIB Specific information on how the material has been secured

  • Add media

  • Notes

1.3 Survey type

  • Notes

1.4 Air monitoring arrangements

  • Notes

1.5 Anticipated Exposure

  • Notes

1.6 CDM Information

  • Notes

2.0 Enclosure, Airlocks, DCU and Other Controls

  • Task 1 Enclosure Size

  • Task 2 Enclosure Size

  • Task 3 Enclosure Size

  • Notes

2. 3 Airlocks and Baglocks Dimensions

  • Airlock Size

  • Bag lock

2.4 Airlocks and Baglocks VPS

2.4.1 Enclosure VPs

2.5 Provision of CCTV and Monitors

2.6 Smoke Testing Arrangement

  • Smoke detectors are present

  • Client and or consultant will be present

  • Security will need to be advised about the smoke test details below

2.7 DCU Location and Parking Arrangements

  • The DCU will be set up in the area specified in the notes below

  • The DCU will set up in the roadway at the front of the property or on the drive to the property

  • Location of DCU

2.8 DCU to Enclosure Description of Transit Route

  • Not Applicable - Direct Connection

  • Transit Route Required - description in notes below

  • Description, including length of transit route

2.9 DCU Information and Waste Management

  • DCU is self contained in both Power and Water

  • DCU is not self contained in power and water- see notes below for details

  • Waste Water from the DCU will discharge to foul drain

  • Foul Drain

  • Waste Water will be stored in a receptacle before discharging to foul drain

  • Water Bowser will be checked at start and finish of each shift

2.10 DCU Direct Connection

  • Direct Connection will be undertaken

  • No Direction Connection, on first floor, impedes footpaths, fire exits etc

  • Explain the reason for non connection

2.11 RPE and PPE information - Standard

  • Ori-nasal for preparing work

  • Full face for Removal

  • Other information

2.12 Access Equipment

  • Ladders

  • Podiums

  • Tower

  • Fixed Scaffolding and will this need to be Licenced?

  • Will a Licenced scaffolder be required?

  • MELP

2.13 Waste Management Estimate of Waste

  • Waste Bags

  • Waste skips . size indicated in notes below

  • Waste Skip size

2.14 Waste Management - Disposal Arrangements

  • Returned in by Kershaw to Transfer Station

  • Waste Collection needs to be arranged

  • Skip Required see above for selection of skip size

2.15 Weather Protection of Enclosure, Airlocks and Baglocks

  • Not Applicable - all internal

  • Applicable - weather protection required

2.16 Loading List

  • DCU

  • NPU 500

  • NPU 2300

  • NPU 5000

  • Vacuums

  • CCTV Cameras

  • Task lighting units

  • Access Tower

  • Access Ladders

  • Access Podiums

  • Airless Sprayer

  • Other Tools and equipment required

3.00 MANAGEMENT ARRANGEMENTS

3.1.1 WC Welfare Arrangements

  • Portaloo Requried

  • Client has extend use of their facilities

  • Short duration work - ad hoc arrangements

  • Principal Contractor has arrangements place

3.1.2 General Welfare Arrangements

  • Client has extend use of their facilities

  • Short duration work - ad hoc arrangements

  • Principal Contractor has arrangements place

3.2 Emergency Plan

  • Client has the identified arrangements in place

  • Client led Emergency Arrangements

  • The default Assembly point is the DCU

3.3 Non Asbestos Risks

  • Electrical

  • Notes

  • WAH

  • Notes

  • Manual Handling

  • Notes

  • Fire

  • Notes

  • Other

  • Notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.