Title Page
-
Level
-
Room Number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 69
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- 98
- 99
- 100
- 101
- 102
- 103
- 104
- 105
- 106
- 107
- 108
- 109
- 110
- 111
- 112
- 113
- 114
- 115
-
Conducted on
-
Prepared by
Mechnaical
-
Paint sprinkler pipework
-
Connect island bench gas taps
-
Connect perimeter gas taps
-
Connect island bench cold water
-
Connect island bench drainage
-
Connect perimeter bench domestic services
-
Install water heaters
-
Install valve sets and connect HVHR units
-
Complete radiator run outs and loop out for flushing
-
Install radiators
-
Install secondary ductwork from HVHR units to windows
-
Insulate LTHW and domestic services pipework
-
Install extract fan and attenuator
-
Install plenum and extract grille
Electrical
-
Install gas proving panel
-
Connect HVHR to network
-
Network HVHR’s together
-
Install HVHR controller
-
Install air differential pressure switch
-
Wire gas proving panel
-
Install containment to island benches
-
Install containment to perimeter benches
-
Wire island bench power
-
Wire perimeter bench power
-
Wire teachers wall dado trunking
-
Second fix island bench power
-
Second fix perimeter bench power
-
Second fix Teachers Wall dado
-
Install e-stop
-
Install raft lights
-
install fire alarm system
-
Second fix fire alarm
-
install cleaners socket
-
Second fix clock
-
Second fix power to hvhr
-
Second fix water heater
-
Second fix PA speakers
ESG Sign off Sheet
-
Signed off on Behalf of ESG