Installation of insulation within SFS (if applicable)

  • Has EPS cut back flush with outside face of SFS

  • Is ther any voids within SFS/Timber frame have been packed with mineral wool insulation (Isover)

Installation of Y-Wall

  • Has the Boards been full fixed in line with manufactures direction

  • Are all joints have been sealed/taped

Installation of EPDM

  • Is EPDM fully bonded to existing window/existing EPDM

  • Is EPDM Fully bonded to Y-wall

Installation of VCL

  • Has it been installed in accordance with manufacturers details

  • Are all joints have been taped and sealed

Installation of Insulation

  • Is the Fixing pattern is in accordance with manufactures details

  • Are all voids been packed with mineral insulation (duo-slab)

Installation of Fire Breaks

  • Are Vertical fire breaks installed in accordance with construction issue drawings

  • Is there any compression on the fire break once the cladding has been reinstated

  • Are the vertical fire break installed in accordance with manufacturers details

  • Are the Horizontal fire breaks installed in accordance with construction issued drawings

  • Are the Horizontal fire beaks installed in accordance with manufacturers details

Installation of applicable wall covering

  • Are all items are installed line and level

  • Are all items are free of defects (other than that identified prior to removal)

Completion

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.