KINJAL LTD - SITE INSPECTION
-
Audit Title
-
Site Address
-
Location
-
Conducted on
-
Document No.
-
Prepared by
-
Technician(s) Performing work
-
Type Of Job
General Info
-
Note: Use this audit to assess the following aspects of this site as Safe, At Risk or Not Applicable. The unsafe response indicates that attention is required to bring items to a satisfactory standard.
-
All personnel on site has visionstream passport?
-
All Personnel on site aware of the location of the First aid kit and Fire extinguisher?
-
First Aid kit fully stocked, items are within expiry dates and is readily accessible?
Work Areas
-
Do you wish to examine work areas on this safety walk?
-
Site and/or pathways clear of slip/trip hazard?
-
Work Surfaces (clear of clutter and dust)
-
Sides or Holes cordened or covered
-
Is site area properly secured/covered when not attended?
-
Do pedestrian have safe passage?
Personal Protective Equipment (PPE)
-
Do you wish to examine PPE on this safety walk?
-
Hard Hats (available, worn by crew(s) and in safe condition)
-
Safety Glasses with Side Shields (available, worn by crew(s) and in safe condition)
-
Safety Boots (fit for task, worn by crew(s) and in safe condition)
-
Hearing Protection (available, worn by crew(s) and in safe condition)
-
Appropriate Clothing (in safe condition)
-
Gloves (available, worn by crew(s) and in safe condition)
-
Respiratory Protection (available, worn by crew(s) and in safe condition)
-
Comments
Fall Protection Equipment
-
Do you wish to examine fall protection equipment on this safety walk?
-
Appropriate for task and used properly by crew where applicable?
-
Fall protection equipment inspected before use?
-
Is there any discoloring/fraying or holes on harness components?
-
Are all the clips / attachment points present?
-
Are there any cracked / bent clips or buckles?
-
Is there any discoloring/fraying or holes on the lanyard fabric?
-
Is the retracting feature working (if self-retracting) ?
-
Is the lanyard appropriate for the job?
-
Are any cable lines snapped or frayed (if cable)?
-
Are any links bent or stretched (if metal links)?
-
Are all hooks and carabiner intact?
-
Is there a locking mechanism present?
-
Are any connectors stretched, cracked or modified?
-
Has any of the stitching been ripped?
Ladders
-
Do you wish to examine ladders on this safety walk?
-
Ladders are well maintained and in satisfactory condition
-
Ladder base, footing and set up is to standard
-
Proper Ladder for Task
Tools and Equipment
-
Do you wish to examine tools and equipment on this safety walk?
-
General condition of tools
-
Tools and Equipment inspections take place and are recorded
-
Right tools are being used for tasks
-
Crew members are trained to be competent in the tools appropriate for their work tasks
Excavations
-
Do you wish to examine excavations on this safety walk?
-
Access/Egress is safe and frequency of egress is acceptable
-
Shoring/Shielding/Sloping is safe
-
Barricades are in place as required
-
Spoil Pile
Electrical Safety
-
Do you wish to examine electrical safety on this safety walk?
-
Ground fault circuit interrupters in use
-
Extension Cords are not causing trip hazards or used inappropriately
-
Power Tools are undamaged and being used fit for purpose
Personnel
-
Do you wish to check personnel in this safety walk?
-
Behavior is orderly and professional
-
Clear communication is possible without needing to shout
People Safety
-
Do you wish to check work crew safety knowledge at this inspection?
-
Approach at least one team member and record their responses to the following. Make clear this is not an assessment of the team member themselves, but rather the safety procedures on site.
Team Member
-
Has the team member attended a pre-start meeting or toolbox talk within the last week?
-
Is the team member able to describe the correct process to follow in an emergency situation?
-
Is the worker able to identify three hazards they may encounter in their tasks today?
-
Team member signature (to verify this interview took place NOT to assess their safety knowledge)
General Comments
-
Any further comments or recommendations arising from this inspection?
-
Add any additional relevant photos
-
Have all required corrective actions been added as Actions to this inspection?
-
Please add any corrective actions to the appropriate questions above before completing this report
Sign Off
-
Name & Signature of Inspector
-
Name & Signature of Site Supervisor / Foreman