Information
-
Conducted on
-
Department
-
Document No.
-
Manager Or Supervisor of the area
-
Prepared by
-
Personnel
-
Select date
-
Are the MBS safety Checklist signed off
Department:
-
Is the bottleneck machine/process operating?
-
Is the Lead Board up to date?
-
Is production tracking being utilized?
-
Is WIP controlled within the queue?
-
Is WIP available for production?
-
Are all machines operational?
-
5S+1: is the area organized?
-
Is WPO being followed?
Work Area
-
Are dedicated aisles clear?
-
Are machines running (as needed)?
-
Are TPMs being performed and signed off?
-
Is the operator in area (as needed)?
-
Are all employees staying in their work area?