Title Page

  • Site conducted

  • Date of Inspection

  • Contractor Name

  • Contractor's Inspector Name

  • Contractor Project Manager Name

  • Project Name

  • Project Number

  • Permit Number

  • Region

  • Project Code (SA #)

  • Reason for Inspection

  • State Complaint here

  • Specify Other Reason for Inspection

  • Precipitation Since Last Inspection

  • Has there been a storm event since the last inspection?

  • Storm event start date, precipitation amount, and storm event duration

  • Source

  • Current Conditions at Time of Inspection

CONSTRUCTION SITE ASSESSMENT

  • Construction site perimeter contained and offsite tracking minimized?

  • Disturbed areas contained?

  • SWMP available online?

  • Areas used for material and waste storage and fueling?

  • Active stormwater at time of inspection?

  • Estimated disturbed area at the time of the inspection?

SWMP MANAGEMENT

  • Changes made to the SWMP during construction?

  • Changes approved and noted on the plans?

CONTROL MEASURES

EROSION CONTROL

    Seed & Mulch
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Temporary Mulching
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Seed & Blanket
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Check Dams
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Diversion Berm
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Diversion Channel
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Surface Roughening
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Outlet Protection
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Additional Stabilization
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Other Control Measure
  • Specify BMP Type

  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

SEDIMENT CONTROL

    Inlet Protection
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Perimeter Control
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Curb Checks
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Cut Back Curb/Grade Drop
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Silt Fence
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Rock Socks
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Wattles
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Erosion Bales
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Temporary Sediment Basin
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Stabilized Construction Entrance
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Sweeping at Construction Entrance
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Other Control Measure
  • Specify Control Measure Type

  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

MATERIALS HANDLING & SPILL PREVENTION, WASTE MANAGEMENT AND GENERAL POLLUTION PREVENTION

    Stockpile Management
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Materials Delivery & Storage
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Spill Prevention & Control
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Concrete Washout
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Concrete Saw Water Containment
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Solid Waste
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Sanitary Waste
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Maintenance & Fueling
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Street Sweeping Vacuuming
  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Dewatering
  • Practice Required/Used?

  • Active discharge today?

  • Discharge Location

  • Observations (visual quality, characteristics of discharge: color; odor; floating, settled or suspended solids; foam; oil sheen; and other indicators of stormwater pollutants.)

  • Sample taken today?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Other Control Measure
  • Specify Control Measure Type

  • Practice Required/Used?

  • Maintenance or Sediment Removal Needed?

  • Date for Action to be Completed?

  • Select date

  • Date Action Completed?

  • Date Action No Longer Needed?

  • Select date

  • Additional Comments

INSPECTIONS AND MAINTENANCE PROGRAM

  • Inspection Frequency

CERTIFICATION STATEMENT

  • “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.”

  • Contractor's Inspector Sign Off

  • Certification of all issues completed are on individual findings as each is completed with date.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.