Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Project Name

  • Principal Contractor

  • Brief description of project

  • Office Address

  • Contact Name

  • Email

Questionnaire

  • 1. Person responsible for H&S & CDM

  • 2. Person responsible for First Aid on site

Requirements

  • 3. Is the construction phase health and safety plan onsite?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 4. Was the plan in place before work commenced on site?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 5. Is the Notification (F10) on display and correct?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 6. Are the site rules on display?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 7. Is the fire plan on display and schematic?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 8. Are authorised persons on the site?<br><br>Check site register

  • Risk rating: 1. Non c 2. IN 3. PN

  • 9. Is the Security of the premises maintained?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 10. Are arrangements in place for liaison with the Clients Representative?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 11. Is the Health & Safety Plan being developed by the PC?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 12. Are employees and visitors induction procedures followed?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 13. Is an Induction Register maintained?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 14. Are emergency procedures in place?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 15. Is First Aid Equipment available & complete?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 16. Is PPE available?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 18. Have there been any accidents: Minor / RIDDOR?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 19. Have risk assessments and method statements been prepared by Contractors?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 20. Are arrangements in place for co-ordinating the work of Contractors?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 21. Are arrangements in place for monitoring H&S matters?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 22. Are arrangements in place for Protection & Separation?<br><br>Aspergillus and other contractors

  • Risk rating: 1. Non c 2. IN 3. PN

  • 23. Is appropriate signage displayed and correct?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 24. Are arrangements in place for the control of works outside the Principal Contractors Site?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 25. Are arrangements in place for monitoring the safety of scaffolding and works equipment?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 26. Are arrangements in place for the control of vehicles?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 27. Are arrangements in place for the provision of welfare facilities?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 28. Are arrangements in place for the maintenance and protection of the works whilst the site is unoccupied?

  • Risk rating: 1. Non c 2. IN 3. PN

  • 29. Is information being collated for the H&S File?

  • Risk rating: 1. Non c 2. IN 3. PN

Summary

Sign off

  • On Site Representative

  • Auditors Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.