Title Page
-
Client
- Alliance Homes
- Templar Home Build
- Cornerstone
- WMS
- Ocean Housing
- Cornwall Housing
-
Job number
-
Site Address
-
Conducted on
-
Prepared by
Pre Start
-
Occupant informed of your site attendance prior to arrival
-
Good access to loft
-
Access method to enter loft
-
Ladder inspected before use and fit for purpose
-
Does loft have lighting in place
-
Is the loft boarded out
-
If boarded, can the boarding be easily lifted to access insulation
-
Will boards be refitted after insulation installed
-
Has the occupant been informed about not refitting boards (where applicable)
-
Is the loft space clear of personal belongings
-
If belongings are in situ can the insulation works be completed
-
Depth of current insulation
- No insulation in place
- Up to 50mm
- Up to 100mm
- Up to 150mm
- Up to 200mm
- Up to 250mm
- Up to 300mm
- More than 300mm
Completion
-
Number of rolls of insulation used
-
Loft insulation work completed
-
All tools and equipment removed from loft
-
Depth of insulation on completion
-
Area below loft hatch left clean and tidy
-
Loft lighting turned off
-
Loft hatch fitted in place and secure
Sign Off
-
Occupant satisfied that all work has been completed and that the area has been left clean and tidy.
-
Occupants Name
-
Occupants Signature
-
Installation Technicians Name
-
Installation Technicians Signature