Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
8 Maintenance
-
8.1.1 maintenance requests (review RM tasks at random)<br>Prompt and efficient response to maintenance requests as per agreed SLA.
-
8.1.2 Water supply and drainage<br>Comprehensive maintenance of water supply and drainage is in top operating condition
-
8.1.3 Air conditioning <br>Comprehensive maintenance of air conditioning supply and associate equipment is in top operating condition
-
8.1.4 Electrical <br>Electrical supply equipment and distribution services is in top operating condition <br>
-
8.1.5 PPM<br>All mechanical equipments and services is in top operating condition <br>Planned preventive maintenance in place and documented and followed.
-
8.1.6 inspections <br>Regular inspections carried out, documented, reported and snag rectification carried out
8.2 MEP and Life safety systems
-
8.2.1 Repair and replacement of mechanical and electrical equipment, water heaters, extraction fans - physical inspection carried out - checklist maintained
-
Water pumps<br>Repair of water pumps wherever possible
-
Water pipes and tanks<br>Repair leaks to water pipes and tanks
-
Sanitary fittings<br>Repair and replacement of sanitary-ware fittings
-
Drainage<br>Attention to drainage problems
3. Preventive maintenance
-
Electrical and lighting circuits<br>Safety trip checks of lighting and electrical circuits
-
Distribution boards<br>Check inspection of distribution boards
-
Water heaters<br>Check inspection of water heaters
-
Pumps and controls<br>Check n inspection of all pumps n controls
Air conditioning
-
Quarterly service <br>QS of indoor and outdoor equipment as per ppm
-
Filters<br>Cleaning and replacement as per ppm
-
Electrical components<br>Cleaning and checking as per ppm
-
Coils<br>Pressure washing of coils as per ppm
-
Fluid<br>Top up of refrigerant and oil as per ppm
-
Belts<br>Belts replaced where required
-
Drain lines<br>Lubrication and cleaning of drain lines as per ppm
-
Drip trays<br>Drains checked and inspected
-
Touch ups<br>Minor painting and insulation touch ups
8.3 Carpentry and aluminum
-
8.3.1 doors - Repair fly screen, windows, doors <br>
-
8.3.2 doors<br>Repair door latches, locks n hinges
-
Cupboards and drawers<br>Repair cupboards and drawers
8.4 Masonry
-
8.4.1 tiling - minor grouting and fixing of isolated tiles
8.5 Painting
-
8.5.1 touch ups <br>Touch up painting only following maintenance work
8.6 Other
-
Staff attendance
-
Training records
-
Asset list
-
Material storage
-
Incident reports logged
-
Other
-
Other
Sign Off
-
On site representative
-
Auditor's signature