Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Sales Persons Name:
- Darren Mifsud
- Jay Chen
- Sally Inkster
- Joseph Siryani
- Arifa Careem
- Maree Filippello
- Celia Chen
-
Sales Order Number:
-
Project / Site Manager Details:
-
Phone Number:
Installation of Workstations and Loose Furniture
-
Have the Critical dimensions been adhered to:
-
Have the shelves been installed:
-
Has the soft wiring been installed neatly:
-
Soft wiring installed:
-
Melamine and Screen Panels are damage free:
-
All items have been for counted for correct quantities:
-
Was the Installation completed on time:
Joinery / Storage units
-
Have all storage units been installed correctly:
-
Have all shelves been installed:
-
Have exposed screws have been capped with correctly coloured screws:
-
Have all cupboards and draws been cleaned:
-
Lock replacement required:
-
Barrel / Key Number:
Seating
-
Seating is damage free:
-
Bags removed from chairs:
Cleaning
-
Edging checked for glue residue:
-
Rubbish removed from site:
-
All furniture cleaned:
-
Site has been vacuumed:
-
All storage units cleaned for wood chips:
-
Krost labels attached to product:
-
Have all spare parts been removed from site:
Corrective Action
-
Who is responsible to repairs defects:
- N/A
- Operations Manager
- Project Co-Ordinator
- Sales Person
- Customer Service
- Client
-
Drawing of Defect:
-
Date defects are to be completed by:
-
Notes:
Sign Off
-
Photograph of site:
-
Client / Project Manager / Site Managers details:
-
Krost Representative's Details: