Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
CASH AND CASH EQUIVALENT (5%)
Petty Cash management:
-
Is there any discrepancy on Petty Cash Fund? (Shortage/Overage)
-
Does the use of petty cash comply with the prescribed standards on the audit checklist?
-
Is the liquidation of warehouse petty cash to the head office carried out on time, as per standard?
RPF (Request for Payment Form):
-
Do the warehouse records in the RPF show no discrepancies as per the audit checklist?
-
Are the RPF properly filled out with the appropriate attachments as per the requirements?
-
Were all the requests submitted on time?
-
Were all RPFs liquidated on time?
WAREHOUSE DOCUMENTS STANDARDS (20%)
DR - DELIVERY RECEIPT
-
Is the Physical Delivery Receipt (DR) filed completely?
-
Is the filing of Physical Delivery Receipt (DR) within the established standards?
-
Is the Physical Delivery Receipt (DR) input properly and completely?
-
Are Physical Delivery Receipt (DR) properly and completely encoded in Odoo?
SMF - STOCKS MOVEMENT FORM
-
Is the Physical Stock Movement Form (SMF) filed completely?
-
Is the filing of Physical Stock Movement Forms (SMF) within the established standards?
-
Is the Physical Stock Movement Form (SMF) input properly and completely?
-
Are Physical Stock Movement Forms (SMF) properly and completely encoded in Odoo?
BMF - BAD STOCK MOVEMENT FORM
-
Are all Bad Stock Movement Forms (BMF) listed in the following documents:<br>a. Warehouse BO Logs for product damages and conversions?<br>b. Checkers SMF Logs for transferring of stocks?
-
Are Physical Bad Stock Movement Forms (BMF) properly and completely encoded in Odoo?
RRF - RETURN RECEIVE FORM
-
Is the RRF series filed properly and completely?
-
Is the filing of Physical Return Request Forms (RRF) within the established standards?
-
Does every Return Receiving Assessment Slip (RR-AS) have a corresponding Return Request Form (RRF)?
-
Is the Physical RR-AS (Return Receiving Assessment Slip) or RRF (Return Request Form) properly and completely encoded in Odoo?
DCC DAILY CYCLE COUNT/INVENTORY RECONCILIATION
-
Is the Daily Cycle Count (DCC) fully accomplished?
-
Is the Daily Cycle Count (DCC) submitted on time by 9:00 AM each day?
-
Are all SKUs with discrepancies reconciled by 12:00 PM each day, including checking the history of missed SKUs?
-
Are all records in the Daily Cycle Count (DCC) reconciled and updated with the Odoo records?
WAREHOUSE MAPPING
-
Does the actual mapping align with the actual inventory per pile, including placement and inventory?
-
Is each pile color-coded for easy identification and representation on the mapping?
-
Is the mapping updated daily and sent by 12:00 PM?
OTHER DOCUMENTS (LOGS):
Warehouse BO Logs
-
Is the data input correct and accurately encoded in Odoo?
Rebagging Logs
-
Is the data input correct and accurately encoded in Odoo?
Sweeping Logs
-
Is the data input correct and accurately encoded in Odoo?
Checker DR Logs
-
Are all records on DCC vs IOI records are updated and reconciled?
Checker SMF Logs
-
Is the data input correct and accurately encoded in Odoo?
WAREHOUSE CLEANLINESS AND STANDARDS (20%)
WAREHOUSE STANDARDS
-
One (1) template per brand, per type, vessel code.
-
Each pile must be color coded for easy representation on mapping.
-
All piles must have at least 1 meter distance from walls (Left, Right & Back).
-
Sling bags foundation should have 3 high for foundation before locking. <br>Jumbo bags foundation should have 4 high for foundation before locking
-
Sling bags maximum stacking must be 6 high. <br>Jumbo bags maximum stacking must be 9 high.
-
Arrangement at the back part must be 3 high foundation for sling and 4 high for jumbo on first 2 rows
-
Must have horizontal counting and running total written at the side of the pile
-
Other part of the warehouse ( Parking Lot, BO area, Rebag area, Resling Area, Sweeping Area) per door
WAREHOUSE CLEANLINESS
-
Is there a staging area/tagging, for items, bad stocks?
-
Warehouse is organized & clean?
SERVICE TOOLS/ASSETS (15%)
-
Are all tools/assets placed in a secured area?
-
All tools/assets are properly maintained
-
Are all issued tools/asset, properly documented?
-
Are all issued tools/asset, have proper preventive maintenance schedule?
-
Are all records of service tools assets on the warehouse aligned on HO records?
-
Forklit are properly maintained daily (with Preventive maintenance checklist/s accomplished daily)
INVENTORY RESULT (40%)
Wall-to-wall AUDIT INVENTORY vs DCC (Daily Cycle count) (1 day, less all yesterday's transaction) - Cement Product
-
GOOD STOCKS - No variance?
-
BAD STOCKS - No variance?
Wall-to-wall AUDIT INVENTORY vs DCC (Daily Cycle count) (1 day, less all yesterday's transaction) - Plywood Product
-
GOOD STOCKS - No variance?
-
BAD STOCKS - No variance?