Information

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Untitled Page

Severity+Probability=Priority (Eg. Worker at heights without Fall Protection - 1A) (1 life threatening, 2 serious, 3 Minor) (A likely to happen to E NOT likely to happen)

INSTRUCTIONS: Identify potential hazard, prioritize and write the control for the hazard

1. GENERAL INFORMATION

  • 1.1 Task Location

  • 1.2 Task to be performed:

  • 1.3 PPE Inspected?

  • 1.4 Muster Point designated?

  • 1.5 Emergency Response Plan available?

  • 1.6 Emergency Equipment Available?

  • 1.7 Required number of First Aiders available?

2.0 ENVIRONMENTAL HAZARDS

  • 2.1 Work Area Clean<br>

  • 2.2 Material Storage Identified

  • 2.3 Dust/Mist/Fumes

  • 2.4 Noise in Area

  • 2.5 Extreme Temperatures/ weather conditions

  • 2.6 Spill Potential

  • 2.7 Waste Properly Managed

  • 2.8 Other Workers in Area

  • 2.9 Ground Disturbance

3.0 ERGONOMIC HAZARDS

  • 3.1 Prolonged Twisting/Repetitive/Bending Motion

  • 3.2 Working in a Tight Area

  • 3.3 Lift too heavy/Awkward to Lift

4.0 ACCESS/EGRESS HAZARDS

  • 4.2 Scaffold (Inspected & Tagged)

  • 4.3 Ladders Tied Off

  • 4.4 Slips/Trips

  • 4.5 Hoisting ( tools, equipment)

  • 4.6 Confined / Restricted Space Entry (Permit required?)

  • 4.7 Excavation

5.0 OVERHEAD HAZARDS

  • 5.1Power Lines

  • 5.2 Hoisting or Moving Loads Overhead

  • 5.3 Falling Objects

6.0 FALL PROTECTION AND GENERAL SAFEGUARDS

  • 6.2 Harness/Lanyard Inspected

  • 6.3 100% Tie-off with Harness and Anchor Points Identified (Fall Protection Plan available)<br>

  • 6.5 Guardrails

  • 6.6 Tools, equipment and machinery have proper safeguards?

7.0 RIGGING & HOISTING HAZARDS

  • 7.1 Rigging Plan Available for Review?

  • 7.2 Proper Tools Used

  • 7.3 Tools/Slings Inspected

  • 7.4 Equipment Inspected

8.0 ELECTRICAL HAZARDS

  • 8.2 Working On / Near Energized equipment

  • 8.3 Electrical Cords/tools condition

  • 8.4 Fire Extinguisher

  • 8.5 Hot Work or Electrical Permit required

  • 8.6 Verification of lockout/tagout. (De-Energized)

9.0 PERSONAL LIMITATIONS HAZARDS

10.0 POWERED MOBILE EQUIPMENT

  • 10.1 Powered mobile equipment including vehicles working at site

  • 10.3 High visibility clothing available

  • 10.4 Traffic Control

11.0 CHEMICAL OR BIOLOGICAL HAZARDS

  • 11.1 Air Quality

  • 11.2 Ventilation

  • 11.4 Asbestos

  • 11.5 MSDS Reviewed

  • 11.6 Respiratory Equipment

11.0 ADDITIONAL CONTROLS TO ELIMINATE HAZARDS

  • undefined

12.0 GENERAL TOOLBOX MEETING OR TOPIC OF DISCUSSION

  • undefined

13.0 Has any equipment been locked out/tagged out or removed from service? Explain.

  • 13.1 Locked, tagged or removed from service? explain if yes.

All workers must sign onto FLHA prior to work commencing. If any new workers show up onto site they must review this FLHA and sign on as we'll.

  • Lead Supervisor / Company

  • Worker Name / Company

  • Worker Name / Company

  • Worker Name / Company

  • Worker Name / Company

  • Worker Name / Company

  • Reviewed by: Company Representative

  • Reviewed by: Safety Represntative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.