Site Information
-
Document No.
-
Job No.
-
Client
-
Site
-
Engineer
System
Inspection
-
What is the inspection frequency?
Property
-
How many dwellings in the block?
Grade D System
-
Communal system tested?
-
System ok?
-
Details
-
Flats tested?
-
System ok?
-
Details
-
Flats that were tested?
-
List any defects
Emergency Lighting Inspection
-
Does the site have emergency lightning?
-
How many?
-
Three hour drain down Completed?
-
Issues
-
Does this block have a Landlords power supply available?
-
System Status
-
Remediation Requirements
Declaration
Declaration
-
Resident available?
-
Resident Declaration: All work has been carried out to my satisfaction
-
Signature:
-
Date:
-
SCCI Alphatrack Engineer(s) Declaration: I/We, being the competent person(s) for the servicing, certify that the above work complies to the best of my/our knowledge and belief with the recommendations of BS5839-1 2002 clause 45 and/or BS5266-1 / BS5266-8: 2004 section 7 with the exception of any variations and deviations.
-
Signature:
-
Date: