Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Shrubs
-
plants are in good, healthy condition
-
Shrubs installed per plan
-
Shrub basins defined on slopes
-
excessive mulch at base of plant material
-
All shrubs planted at correct depth
Trees
-
lodgepoles are straight and cut 4" above cinch ties
-
Breather tubes are installed
-
Tree rings cut 2"-4" beyond lodgepoles when tree installed in sod
-
All trees planted in correct depth
-
Trees are in good condition, disease free
-
Trunk guards installed
-
Root barriers installed
-
Tree basins defined on slopes
Ground cover
-
Plants are evenly spaced with none missing
-
Plants are in good, healthy condition
-
Excessive mulch at base of plant material
Vines
-
Vines are fastened to adjoining structure
-
Nursery stakes are removed
-
Plants are in good, healthy condition
-
Vines installed per plan
-
Excessive mulch at base of plant material
-
All vines planted at correct depth
Turf
-
Sod pieces are laid with No gaps between pieces
-
Edging is even along bedding areas
-
Turf is at correct grade along concrete edges
-
Finsh grade is smooth, with no divots or dips
Irrigation
-
Plant material is not sitting in water
-
Controller programmed with batteries installed
-
Controller charts are installed and accurate
-
Rain check installed and aperational
-
Permanent electricity and water are available
-
Each station is operable from controller
-
Valve boxes are straight & set 2" above grade
-
Valve boxes are free of debris; have a gravel base
-
Valve boxes are numbered & Valves are tagged
-
DBYs are installed
-
Coverage is correct with no overspray
-
Heads are correct with no overspray
-
Heads are correct height and angle
-
Heads are at the edge of turf
-
Vacuum breakers/ Anti-siphon/Angle valves are plumb
-
Backflow installed per plan and operational
-
Is master valve working with controller
-
Is flow sensor working with controller
-
Is booster pump working with controller
General
-
Set of current plans ( or site map for production )
-
Weeds
-
Pre-emergent herbicide applied
-
Site free from construction debris