Fixture Consistency Checklist
Stockroom - Light Duty Shelving
-
Mending plates are installed within 18” from top and bottom of upright and plates added at every 36” in between.
-
Slotted angle bracing is installed along the top of the 14’ closed uprights at the end of LD runs.
-
Slotted angle bracing is removed from the center of runs where there is cotterman ladders.
-
Support strap is installed at front 14’ LD ends.
-
LD anchor clips have 2 screws installed vertically into the upright. Check SR drawings.
-
Light duty anchored per plan. (Seismic or Non-Seismic) - Dust is vacuumed.
-
Wave protectors and rails are installed per plan.
Stockroom - Pallet Racking
-
Racking is anchored per plan. (Seismic and Non-Seismic). Dust is vacuumed.
-
Wide span has all 4 holes anchored per upright.
Montel System
-
Tracks as well as the ramps have been completed grouted and grouted neatly.
-
Rails are clean of debris.
-
Rails are installed with the spec anchors and tapcons. (Seismic or Non-Seismic)
-
Plywood is notched on the backside at every anchor location.
-
All anti-tips installed correctly.
-
Brakes are adjusted and functioning.
-
All systems have been tested and are in good operating condition.
Hardlines
-
All kick plates have been screwed.
-
Reinforced kick plates are installed per plan.
-
HD bumpers are installed and anchored per plan.
-
4’ End Frames heavy duty stabilizer kits have been installed. 2nd upright to be anchored and block installed underneath bottom rail at first upright.
-
Stabilizer kits are installed on every end frame.
-
Trim lock is installed around all shelf’s and shelf’s are supported.
-
Filler boxes are installed per plan.
-
High walls are all anchored and vacuumed.
-
All trim kits are installed on all wall work and gondolas.
-
High capacity wall work is anchored to floor not to wall.
-
All corner protectors are installed per plan and sleeves are glued.
-
All MAC’s and battery centers are installed per plan.
Softlines
-
All perimeter wall work is installed per plan
-
All high walls are anchored and vacuumed.
-
MAC centers are anchored per plan location.
-
Moveable walls/tables are set per plan.
-
Shoe end frames have shelves installed.
-
Fitting Room
-
All mirrors and wedge mirrors are installed and siliconed.
-
Benches and modesty base are also siliconed.
-
Door stops and coat hooks are installed per plan.
-
All signage installed per plan.
-
All doors are operable with no binding and are able to latch.
-
Supplied hardware is used on all door hardware. NO SUBSTITUTIONS
-
Stools and furniture are set to plan.
Guest Service/OPU
-
OPU stockroom fixtures are installed per plan.
-
GS desk is installed and all lights are working.
-
License and policy board are installed per plan.
-
Guest Service/OPU signage installed per plan.
-
Registers shrouds have been installed.
Electronics and Entertainment
-
All wood shelves are installed per plan.
-
All tables and consultation desk are set per plan with stools.
-
Checklanes
-
Check lanes are set and anchored per plan.
-
Red gondolas are anchored.
-
SCO’s and adjacent gondolas are built and set to plan.
Starbucks
Ulta
-
Fins are installed per shade of each. Darkest on the outside to lightest in the middle.
-
All low voltage wires are connected during install.
-
High walls are set to plan.
-
Graphic focal is on site and installed.
-
Called out fixtures are anchored.
Signage
-
All CSE frames are installed per plan.
-
All overhead signs are installed as you complete a department.
-
All fire exit door stickers are installed.
-
Fire extinguisher stickers are installed per plan.
-
MAC center stickers and “question mark” sign are installed.
-
All office signage/off stage signage is installed.
Offices
-
Desks, chairs, workstations, and file cabinets are all installed per plan.
-
Microwave shelf installed per plan.
-
Lounge Millwork is installed and siliconed. <br>
-
Lockers are installed per plan and numbers installed.
-
Trims are installed on lockers.
-
ADA lockers are installed with hardware and stickers per plan.
-
Lactation room chair, millwork, mirror, and signage are installed per plan.
-
AP bench is anchored.