Title Page

  • SITE CONDUCTED

  • CONDUCTED ON

  • PREPARED BY

  • LOCATION

  • PLOT NUMBER

  • SUBCONTRACTOR

LASER 2ND FIX QA SHEET

2ND FIX INSTALLATION

  • Downlights cut out and installed correctly, batten holders, Pendants and lamps fitted

  • All Fire and CO detection accessories (smoke detectors & bases, heat & bases, carbon monoxide detectors and bases ) Installed and 300mm away from all other accessories, and interlinking

  • Co2 Detector installed between 1m and 3m of the boiler

  • All (sockets outlets, spurs, cooker switches, grids, doorbell chime etc) Installed

  • All TV and BT accessories Installed - list missing items

  • All ventilation equipment, ( extract fans, diffusers, MVHR & MEV units etc.) Installed correctly

  • All loft roof accessories, batten holders, sockets, Installed

  • All consumer units ( breakers, blanks, busbar covers, labelling) Installed correctly

FINALS (2ND AND SUBSEQUENT VISITS)

  • All heating controls, ( thermostatts, cylinder statts, motorised valves, programmers, pumps, junction boxes, wiring centers, immersion supplys) Installed correctly

  • Power up, Functional Testing

  • Earthing & bonding installed, clamps fitted where applicable

  • All externals fitted, outside lights, grills, ev box

  • Garage complete, armoured cleated, spurs, switches, sockets and batten holders fitted

  • Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.