Information

  • Plant

  • Manufacturing Process

  • Work Centre

  • Part Number

  • Prepared by

  • Auditor-Enter First Name/Last Name of person completing the audit

  • Audit Participant(s)

  • Type of Audit (Manager or Supervisor)

  • Conducted on

People

  • Has the operator been trained to requirements of the job and is the versatility training matrix updated?

  • Does it include temp & contract personnel?

  • Are all personnel using all the posted Personal Protective Equipment?

Standardization / Built in Quality

  • Has there been a recent customer incident?

  • Is the quality alert posted?

  • Are people trained on the alert & has it been signed off?

  • Is the work being performed to the instructions on the alert?

  • Are the employees aware that this is a customer concern & can explain what it is?

  • Are all quality checks being performed to the inspection sheet requirements as defined by the first off & process checks?

  • Are all the inspection points within the requirements?

  • Is there a verification station at the work station where there are any of the following happening: final inspection / GP12 / quality gate, (can be temporary or permanent) or where processes have been bypassed.

  • Is there evidence of standardized work instructions (combination table, standardized work chart, and job element sheets) available at the verification station(s) for the work being done?

  • Are they being followed & is training matrix is posted & up to date?

  • Do the trend charts on the I-Charts show an improvement on the top 3 items?

  • Are the alarm limits for visual defects posted & mentioned in the standardized work instructions?

  • Are the operators aware of what the alarm limits are?

  • Is there evidence that verification station(s) are used following significant physical damage to equipment when recovery took longer than 24 hours and the quality of the final product was compromised?

  • Are the work instructions (JES) for the parts being produced at the station?

  • Are they being followed? Observe 3 cycles

  • Are the operators aware of the location of the work instructions?

  • Has the first off process been completed & is the first off tag been completed & posted as per the first-off procedure?

  • Has the safety check sheet been verified?

  • Can the operator show you how they do the checks?

  • For error proofing/error detection device verification, are master/boundary samples (red rabbit) available for each customer attachment point?

  • Are results recorded? Check data back 1 month

  • Do the numbers on the boundary samples match what is on the boundary sample sheet

  • Are process settings and/or parameters being monitored? Choose N/A if there is no equipment/parameters to monitor at the line

  • Are the parameters settings in specification?

  • Is there any screwdriving equipment at the line

  • Are we monitoring the torque?

  • Is the calibration sticker up to date?

  • Is the screw torque with in spec-parameters are on first off?

  • Are key severity items being controlled? - High Severity items

  • Are customer interface characteristics documented on a special product matrix & displayed?

  • Are scrap racks/bins/lock boxes present & parts clearly marked & defective parts marked on the scrap sheets?

  • Are the parts clearly marked?

  • Are the defective parts recorded on scrap sheets or electronically?

  • Per Inspection sheet / Control Plan, is gauge available & does have proper calibration stickers? Select N/A if there is no gauge at the line

  • Enter fixture/gauge # here

  • Is there lot traceability on the parts?

  • Does the lot match what is on the lot traceability sheet. (Check 3 components)

  • Are we following FIFO at the line? - Review dates on the boxes available at the line - check oldest

  • Do the labels at the cell / line match the parts being produced?

  • Does the packaging match the packaging instructions?

  • When was the last time the packaging was checked?

  • Are the operators adding their employee # on the label or part?

  • Is the communication log ("Black Book") available and completed as required?

  • Are there entries by maintenance or quality. Verify the last weeks entries in the book to support any quality alerts or maintenance activities.

Customer Incidents Follow - Up

  • If this work centre had a recent customer incident, is the corrective action in place and does it work?

  • Are verification stations are being used until validation is complete?

  • Is the 8D posted at the line?

More

  • Comments

Sign-off

  • Signature

Customer Incidents Follow - Up

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.