Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

PROGRAM ADMINISTRATION

  • OSHA and Labor law posters in place?

  • Emergency numbers / contacts posted

  • Warning/information signage in place

  • Safety manual - Lincoln Builders

  • Safety manual -subcontractors

  • MSDS on site - LBBR

  • MSDS on site - subcontractors

  • Weekly toolbox talks

  • CPR/First Aid trained personnel on site?

  • Are confined space hazards identified and addressed?

  • Are all rebar/pipe and other implement hazards capped/protected?

  • First aid kits on site, current

  • Adequate drinking water and disposable cups on site?

  • Emergency action plan posted / up to date

  • Fire extinguisher - trailer

HOUSEKEEPING

  • Work areas orderly

  • Adequate lighting

  • Projecting nails, screws removed or bent down?

  • Job site free of slips, trips and fall hazards

  • Stairways / walkways clear

  • Jobsite clean, trash picked up

ELECTRICAL / UTILITY

  • Insulation intact on cords and wiring

  • Temporary lighting guarded

  • Electrical panels labeled HOT and covered

  • GFCI protection utilized

  • Lockout procedures utilized

HAND, POWER EQUIPMENT and POWDER ACTUATED TOOLS

  • Hand tools in good working order

  • Electrical cords in good working order

  • All mechanical safeguards in use

  • Handles not broke / splinter free

  • Guards on all saws?

  • Powder actuated tools used properly, operators certified

  • Shot clips stored properly?

  • Used shot clips disposed of properly?

EQUIPMENT

  • Are all operators certified?

  • Brakes, lights, signals and alarms operative

  • Daily log book, inspections done

  • Seat belts worn

  • Are forks on the ground when parked?

  • Is the forklift operator in the seat when load is raised?

  • Aerial lift - PPE being used

  • Do cranes have current inspection, paperwork

  • Cranes- swing radius protected - level

  • Rigging equipment inspected - tag showing

BARRICADES AND FENCING

  • Roadways and sidewalks protected

  • Floor openings planked or barricaded

  • Wall, roof openings covered or barricaded

  • Leading edges guarded

EXCAVATION

  • Is competent person on site

  • Necessary access/egress provided

  • Spoil set back at least 2 feet

  • Proper benching, sloping or trench boxes in place?

  • Barricades and warning signs in place?

  • Rebar impalement protection

LADDERS and STAIRWAYS

  • Handrails in place on stairways

  • Ladders in good condition

  • Side rails extend 36 inches above landing

  • Are access/egress locations with a change in elevation > 19 inches provided with stairs, ladders or ramps?

  • Proper for job and secure

  • Step ladders fully open when in use

  • Employees using stepladders safely?

  • Placement of ladder, 4:1 rule being applied?

SCAFFOLDING

  • Are scaffold inspections done and tags in place and current?

  • All scaffolds plumbed and leveled as erection proceeds

  • Are adequate sills and base plates being used

  • Are base plates and mud sills on firm footing and secured?

  • If electrical power lines are near the scaffold, are necessary precautions being taken

  • Do scaffold planks extend past their end supports not less than 6 inches and no more than 12 inches

  • Are scaffold planks in good condition and approved for use?

  • Are guardrails and end rails in place

  • To protect from falling objects, are toe boards or area barricaded below

  • Are frames and panels braced by cross, horizontal or diagonal braces

  • Are scaffolds with a (4:1) base to height ratio

  • Is fall protection being used in areas where required

  • Are scaffolds securely anchored at lease every 30 feet of length and 25 feet in height

  • Is their an access ladder, steps or equivalent safe access to scaffold

  • Is the scaffold load within its weight capacity

Fall Protection

  • Is fall protection equipment properly inspected and maintained

  • Is fall protection in use at heights > 6 feet

  • Are employees properly trained in fall protection

  • Are all floor holes properly covered and marked

ENVIRONMENTAL CONTROLS

  • Silt fence installed and maintained

  • Hazardous materials properly stored

  • Spill containment kit adequate / on site

FIRE PREVENTION

  • Are safety cans being used and properly labeled

  • Fuel tanks - barricade installed - labeled -( flammable,no smoking, fuel type)

  • "No Smoking" posted/enforced

  • Compressed gas cylinders secured- upright- protected from damage

  • Fire extinguishers immediately available and inspection current

PPE

  • Hard hats worn

  • Gloves being worn - cut resistance

  • Face shields being worn as needed

  • Eye protection being worn

  • Proper foot protection being worn?

  • Hearing protection in use

  • Safety harness and lanyards utilized with adequate anchorage points

  • Respirators and masks utilized

  • High visibility clothing in use

Jobsite pictures

  • Pictures

LBBR VIOLATIONS

  • Notes

SUBCONTRACTOR VIOLATIONS

  • Notes

Job Safety Rating

  • Safety Rating

Signatures

  • Safety Auditor

  • Superintendent/Foreman

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.