Is equipment present, in good working condition, and clean?
-
Sample bags
-
Knife
-
Chisel
-
Wipes
-
Screwdrivers (flat and cross head)
-
Core samplers
-
Tape / Paint / sealant
-
Flat nosed pliers
-
Barrier tape / signage
-
Overalls/Overshoes
-
RPE & filters
-
Waste bag
-
Drop sheet
-
Ladders (Tagged and in date)
-
H-type vac (in date)
-
Is the surveyor well presented, including uniform and ID?
-
Is the surveyor clean shaven?
Survey
-
Does the surveyor have a scope of work, signed risk assessment and method statement on site?
-
Are samples taken correctly and according to procedure? (i.e. sprayed down, tool decontaminated, sample point sealed, RPE worn, drop sheet used where required)
-
Is the surveyor working in a logical manor i.e. bottom to top – clockwise from the room entered? (as per LCC procedures)
-
Are sample bags labelled appropriately?
-
Is the surveyor checking all surfaces thoroughly? I.e. using a knife / chisel to inspect
-
Is survey data recorded with sufficient detail, including non-asbestos items? (consider presumed / strongly presumed samples)
-
For management surveys, are all easily accessible non-asbestos panels etc. inspected behind, including beneath floor coverings? (as per LCC procedures)
-
Have all areas of the building been accessed? If not, have no accesses been recorded correctly, with an appropriate reason as to why?
-
For refurb / demo surveys, are all non-asbestos materials accessed internally, including within boxing’s, behind panels, under floor boards etc.? (as per LCC procedures)
-
Is the surveyor aware of procedures in case of an emergency, including what to do on site, who to inform etc.?
-
Has the surveyor left the site in a safe condition without risk of injury to the building occupants upon completing the survey?
-
Is there any making good needed after the survey?
-
Are sufficient samples of ACM’s taken by the surveyor? (consider sample strategies for each material)
-
Is the surveyor qualified and authorised to carry out the survey? (this may have to be checked from the office)
-
Additional Comments:
Summary
-
Overall Comments and Performance:
-
Is the tenant happy with how the survey was conducted?
-
Has the surveyor been informed of any issues / concerns?
-
Has the survey been carried out to a satisfactory level?
-
Has the surveying company been provided with a copy of this audit, including any issues?