Title Page
-
Inspection Address
Section 1
-
Note: This checklist should only be filled out if you are already in the possession of:
1. The Retro fit Assessment and Design for the property in question
2. The EEM Design for the property in question
This checklist is used to confirm the completeness/adequacy of the building survey and the EEM Design prior to the EEM installation.
All items resulting in a negative"NO" or unknown answer shall be referred back to either the original Building survey surveyor or the EEM provider to obtain further information or confirmation as appropriate. If a negative answer is addressed positively elsewhere in the check sheet, further reference to the Building Survey Surveyor or EEM Designer is not required.
-
Survey Completed by
- Billy Wright
- Jeremy Illy
- Steve Britton
- Lee Glenister
- Oliver Bush
- Other
-
Client
- Dartford Borough Council
- LiveWest
- Somerset West & Taunton
- Alliance Homes Group
- Abri
- Soveriegn
- Selwood
- Shal
- Magna
- Celtic Horizons
- Exeter City Council
- Other
-
Property Address
-
Date of Survey
Details/Condition of the property
-
Property Type:
- Maisonette
- Mid Terrace
- End Terrace
- Semi
- Detached
- Linked
- Other
-
Attachment
- Maisonette
- Mid Terrace
- End Terrace
- Semi
- Detached
- Linked
- Other
-
Number of elevations to be treated
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
-
Agrees with the Building Survey
-
Property Construction:
- Cavity Wall
- Solid Brick
- Pre-Fab
- Non Traditional
- Metal Frame
- Other
-
Please describe construction.
-
No of Storeys of building
-
No of Storeys in individual unit
-
No of Storeys agrees with Retro fit Assessment and Design
-
Number of Bedrooms:
-
Agrees with Retro fit Assessment and Design
-
Approximate Year of Construction:
- A - (Pre 1900)
- B - (1900-1929)
- C - (1930-1949)
- D - (1950-1966)
- E - (1967-1975)
- F - (1976-1982)
- G - (1983-1990)
- H - (1991-1995)
- I - (1996-2002)
- J - (2003-2006)
- K - (2007-Onwards)
-
Conservation area status Established:
-
Planning permission status Established:
-
Building control status Established:
-
Does the wall have cavity insulation?
-
If no, has the cavity been sealed at the perimeter?
-
Need for fire separation of the compartments/Boundaries defined:
-
EEM Design: Accounts for the Building Regulation requirements for fire:
EEM DESIGN:
-
design accounts for building exposure:
-
Design accounts for loading in service e.g Impact:
-
Comments
-
Design eliminates thermal bridging:
-
Design minimises thermal bridging
-
Interface design details(weather seals etc.) comply with requirements of PAS 2030 2019:
Section 2
Existing Finishes: External/Internal
-
Agrees with Retro fit Assessment and Design
-
External Finishes
- Stone
- Brick
- Sand & Cement Render
- Mass Concrete
- Dry dash
- Wet Dash
- Concrete Block
- Wood paint
- Tile Hanging
- Other
-
Please state other type of finish.
-
Internal: Colours & Textures
- Plaster skim
- Plaster board
- Sand and Cement
- Insulated Plaster Board
- Timber
- Other
-
Other internal finishes please specify:
- Wallpaper
- Paint
- Tiles
-
Comments:
Through Wall Construction
-
Internal to external surface layers
-
Overall Wall Thickness
-
Photo of wall thickness
-
Layer 1
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 2
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 3
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 4
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 5
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 6
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 7
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Existing U-value: .............W/m2K (taken from EEM design)
-
Has a second through wall construction been identified ?
-
Overall Wall Thickness
-
Photo of wall thickness
-
Layer 1
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 2
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 3
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 4
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 5
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 6
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 7
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Existing U-value: .............W/m2K (taken from EEM design)
-
Has a third through wall construction been identified ?
-
Overall Wall Thickness
-
Photo of wall thickness
-
Layer 1
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 2
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 3
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 4
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 5
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 6
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Layer 7
- Wallpaper
- Paint
- Plaster Skim
- Render
- Dense Concrete Block
- Lightweight Concrete Block
- Cavity
- Cavity Insulation
- Timber Frame
- Plywood
- Plasterboard
- Insulated Plasterboard
- Dry Dash
- Wet Dash
- Hanging Tile
- Brickwork
- Stone
- System built Concrete wall with cavity
- System built Concrete without cavity
- Metal Frame
-
Existing U-value: .............W/m2K (taken from EEM design)
Property Elevation Photos
-
Which Elevations exist on this property
- Front
- Rear
- Left from front
- Right from front
- Garage and/or outbuilding
- Other elevations
-
Photos
Property Measurements:
-
Property Sketch Photos
-
Front
-
Rear
-
Left Hand Side (from front)
-
Right Hand Side (from front)
-
Other
-
Agrees with Building Survey
Section 3
Enabling
-
Satellite Dish works (qty)
-
TV Ariel (qty)
-
External Lights (qty)
-
Alarms (qty)
-
CCTV (qty)
-
Electric Cables (description and lm)
-
Satellite Cables (lm)
-
Electric Box (Type and qty)
-
BT Box (qty)
-
Gas Box (Type and qty)
-
Gas Flue (position and qty)
-
Gas Pipework (lm)
-
Condense Pipework (lm)
-
PRV (qty)
-
Overflow (qty)
-
External Tap (qty)
-
Downpipes (Number of downpipes and lm)
-
Soil and Vent Pipe (connections and lm)
-
Vent Pipe (lm)
-
Through soffit (Y/N)
-
Gates (Material and qty)
-
Fence panels (material and qty)
-
Fence posts (material and qty)
-
Walls (construction type and description)
-
Canopy/Porch (material and qty)
-
Vegetation (day work estimation)
-
Handrail (material and lm/brackets)
-
Grab rails (material and qty)
-
Scaffolding Bridge (qty)
-
Window Cills (over or under)
-
Insulated Plinth Detail (lm)
Section 4
STRUCTURAL DEFECTS (E.g. Cracking, subsidence,weak or cored components):
-
Is there any evidence of structural defects ?
-
What are the Details?
-
Requires Competent Person e.g. Structural Engineer
-
Agrees with Retrofit Assessment/Design
-
Photos of Structural Defects
-
EEM Design:
-
Structural repairs included in the design before works start
-
Structural repair to be carried out by others before works start
-
Site pull-out tests undertaken for mechanical fixings
-
System fixing design calculated for all loading conditions ( wind,system weight etc.)
-
Design eliminates thermal bridging
-
Design minimises thermal bridging
-
Interface design details( weather seals etc.) comply with requirements of PAS 2030 2019
EXISTING RENDER:
-
Comments:
- No evidence of defects
- Defects apparent
-
Comments on apparent defects
-
Agrees with Retrofit Assessment/Design
-
Photo(s)
-
EEM Design:
-
Requires removal, partial removal, repair
-
Render repair included in the design
-
Render repair measure to be carried out by others prior to works.
PRESENCE OF DAMP (RISING, PENETRATING OR CONDENSATION):
-
Comments
-
Comments on damp
-
Agrees with Retrofit Assessment/Design
-
Photo(s)
-
EEM Design:
-
Damp treatment included in the design
-
Damp treatment measure to be carried out by others prior to works starting.
FROST DAMAGE:
-
Comments
- No evidence of weathering damage
- Evidence of weathering damage
-
Agrees with Building Survey
-
Photo(s)
-
EEM Design:
-
Frost repair included in the design
-
Frost repair measure to be carried out before
DETAIL/LOCATION OF MOVEMENT JOINTS:
-
Are there Movement Joints
- No movement joints in existing or required by EEM
- Movement joints in existing
- New movement joints required
-
Comments of movement joints
-
Agrees with Building Survey
-
Photo(s)
-
EEM Design:
-
Included in the design
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals etc.) comply with the requirements of PAS 2030 2019
MOSS/LICHEN/MOULD/IVY or EFFLORESCENCE
-
Is MOSS/LICHEN/MOULD/IVY or EFFLORESCENCE present
-
Comments of growth
-
Agrees with Building Survey
-
Photo(s)
-
EEM Design:
-
Remediation included in the design
-
Design eliminates cold bridging
-
Design minimises cold bridging
-
Interface design details (weather seals etc.) comply with requirements of PAS 2030 2017
Section 5
HEATING SYSTEM - EXTERNAL PIPEWORK/FLUES/METER BOXES etc:
-
Detail type(s) and location(s) of the heating system(s) in the comments below
-
Agrees with Retrofit Assessment/Design
-
Has the Ventilation strategy been completed?
-
Photo(s)
-
EEM Design:
-
Included in the design
-
Safety of the design (compliance with "Specification for the installation of external wall insulation ensuring the safety and operation of the fuel burning appliances ")
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals etc,) comply with the requirements of PAS 2030 2019
-
Comments:
EXISTING VENTILATION:
-
Agrees with Retrofit Assessment/Design
-
Photo(s)
-
Will current roof vents be adequate after EWI has been installed?
-
Is there adequate ventilation in the subfloor?
-
Are there room ventilators / extractors where necessary? (E.G Bathroom/kitchen/utility)
-
Please take pictures of fans and fan flow rates.
-
Are the combustion ventilators adequate for the heating system(s)?
-
If any of the above are no are there provisions to be put in place for new ventilation?
-
If yes please give details
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals etc.) comply with requirements of PAS 2030 2019
-
Comments
WINDOWS/DOOR MATERIAL:(Timber/PVC/Other):
-
Agrees with Retrofit Assessment/Design
-
Photo(s):
-
Window material type
- UPVC
- Timber
- Metal
- Composite
-
Window Renewal
-
Door material type
- UPVC
- Timber
- Metal
- Composite
-
External Door Renewal
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals around cill, window frame etc.) comply with requirements of PAS 2030/2019
-
Comments:
EXTERNAL SERVICES/ATTACHMENTS TO THE WALLS e.g (Satellite dish, lights):
-
Agrees with Retrofit Assessment/Design
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals around cill, window frame etc) comply with requirements of PAS 2030/2019
-
Comments:
EXTERNAL ELECTRICAL CABLES/EQUIPMENT:
-
Agrees with Retrofit Assessment/Design
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Design details (Penetration,fixings, weather seals etc.) comply with requirements of PAS 2030 2019
-
Comments:
Section 6
EWI ABUTMENT TO EAVES & ROOFS:
-
Agrees with Retrofit Assessment/Design
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging (full continuity between wall and the roof insulation)
-
Design minimises Thermal bridging (partial continuity between wall and roof insulation)
-
Interface design details (weather seals etc.) comply with the requirements of PAS 2030/2019
-
Comments:
EWI ABUTMENT TO OTHER STRUCTURES (Conservatories extensions, garden walls, gate posts etc):
-
Agrees with Retrofit Assessment/Design
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Interface design details (weather seals etc.) comply with requirements of PAS 2030/2019
-
Comments:
RAIN WATER AND DRAINAGE PIPES:
-
Agrees with Retrofit Assessment/Design
-
Photo(s):
-
EEM Design:
-
Can existing Pipework be moved ?
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Design details (Penetrations, fixings, weather seals, mounting blocks etc.) comply with the requirements of PAS 2030/2019
-
Comments:
DAMP PROOF COURSE(DPC) PROVISION AND LOCATION:
-
Agrees with Retrofit Assessment/Design
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Design details (E.g Insulated plinth below DPC) complies with requirements of PAS 2030/2019
-
Comments (including any insulated plinth detail and location)
ARCHITECTURAL FEATURES (e.g. protruding stone work, tile sills, soldier courses):
-
Agrees with Retro Fit assessment/Design
-
Photo(s)
-
EEM Design:
-
Design eliminates Thermal bridging
-
Design minimises Thermal bridging
-
Design details (Penetrations, fixings, weather seals,etc.) comply with requirements of PAS 2030 2019
-
Comments:
Section 7
Additional information
-
Is a Gas meter present ?
-
Photo of Gas Meter
-
Is an Electric meter present ?
-
Photo of Electric Meter & Consumer Unit with Earthing.
-
Is there a loft space ?
-
Is the loft accessible ?
-
Photos of insulation (inc depth)
-
Photos of party and external walls (if visible)
Summary
-
Is the building suitable for EWI, adhering to guidelines as set out in the Building Regulations and requirements of PAS 2030/2017
-
Company
-
Signature